| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 LAccepted-AOC | ₹3.8 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹4.2 L+₹34,866 (9.10%)Rejected-AOC | ₹4.2 L+₹34,866 (9.10%) | 2 | Rejected-AOC Higher rate hence rejected |
| Sl No | Description | Qty | Unit | Santha Kumar V L1 | MURALI NITTURAN L2 |
|---|---|---|---|---|---|
| 1.00Compound wall | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 50.5 | sqm | 219.2 ₹11,069.6 | 70 ₹3,535 Lowest |
| 1.00 | 15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar | 13.4 | cum | 2,498.5 ₹33,487.4 | 2,000 ₹26,806 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 18.18 | cum | 299.5 ₹5,444.91 Lowest | 500 ₹9,090 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 10.1 | sqm | 350 ₹3,535 Lowest | 600 ₹6,060 |
| 1.00 | OD7913/2025-2026:Laterite boulder masonry with hard departmental stone in foundation and plinth including levelling up with cement concrete 1:6:12 (one cement, six course sand , 12 graded stone aggregate 20mm nominal size ),up to plinth level with cement mortar1:6 <br>(OD taken from TS Register No: 277/2022-2023(EST NO:2022/595)) | 25.25 | cum | 6,900 ₹1,74,225 | 5,000 ₹1,26,250 Lowest |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.03 | cum | 6,900 ₹20,907 Lowest | 10,000 ₹30,300 |
| 1.01 | OD1122/2022-2023: Laterate masonry with neatly dressed laterate stone of size 30x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. <br> | 14.12 | cum | 6,299 ₹88,941.88 Lowest | 8,000 ₹1,12,960 |
| 1.01 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 147.28 | sqm | 303.5 ₹44,699.48 Lowest | 500 ₹73,640 |
| 1.01 | 13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm | 147.28 | sqm | 119.5 ₹17,599.96 Lowest | 200 ₹29,456 |
Tender Value
₹4.2 L
EMD Value
₹10,591
Closing Date
15 Jun 2026, 3:00 pmClosed
AEE
Harbour Engineering Subdivision office,cheruvathur
DEPOSIT-Fisheries Department-Urgent repair to the Compound wall of the Office of Deputy Director of Fisheries Kasargod district-General Civil Work
2026_HED_849785_2
HED/CEHED/TR/215/2022_5_1_1/3
Open Tender
Civil Works - Buildings
Item Rate
Cheruvathur
Please refer Tender documents.
12 documents required · 12 mandatory
₹935
Yes
₹10,591
Yes
9 Sept 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
8 Jun 2026 - 15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Compound wall | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar | - | cum | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.004 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.005 | OD7913/2025-2026:Laterite boulder masonry with hard departmental stone in foundation and plinth including levelling up with cement concrete 1:6:12 (one cement, six course sand , 12 graded stone aggregate 20mm nominal size ),up to plinth level with cement mortar1:6 <br>(OD taken from TS Register No: 277/2022-2023(EST NO:2022/595)) | - | cum | - | - |
| 1.006 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | OD1122/2022-2023: Laterate masonry with neatly dressed laterate stone of size 30x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. <br> | 1 | cum | - | - |
| 1.008 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | - | sqm | - | - |
| 1.009 | 13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1443787.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 2.57 MB
BOQ_1443787.xls
BOQ • 0.30 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Other Document • 2.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .