Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | L1 | Accepted-AOC Agreement executed on 29/10/2022 | |
| 2 | L2₹2.5 L+₹16,946.58 (7.15%)Rejected-AOC ARISHAD HOUSE AHMED NAGAR PANTAS KUTTER MALAPPURAM KERALA | MALAPPURAM | MALAPPURAM | KERALA | 676305 | L2 | Rejected-AOC Higher rate and hence not admitted |
Tender Value
₹2.5 L
EMD Value
₹6,354
Closing Date
14 Sept 2022, 2:00 pmClosed
Bindhu V K
Assistant Executive Engineer, CIP Sub division Pazhayannur
GENERAL-CSM 2022-23-CSM-2022-23 - urgent rectification work of Spout in Killimangalam, Pynkulam and Panjal branch canal-General Civil Work
2022_Irrig_506169_15
D1/785/2022/TD
Open Tender
Civil Works - Canal
Item Rate
270 days
Cheerakuzhy Irrigation Project Canal
Please refer Tender documents.
7 documents required · 7 mandatory
₹565
Yes
₹6,354
Yes
15 Nov 2022
1 Sept 2022
15 Sept 2022
1 Sept 2022
14 Sept 2022
1 Sept 2022
Amount
Urgent rectification of spout in killimangalam,panjal & pynkulam branch canals
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD7449/2022-2023:Supplyinfg and fixing in position PVC Pipe 150mm dia incluingcutting laying jointing to the lines levels as per the direction of departmental officers.
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD7450/2022-2023:Supplying Anodised Aluminium pull bolt lock (locking bolt) of size 85 mmx42 mm wutg screws, bolts, nuts and washers complete
OD7451/2022-2023: Supplying PVC End Cap for 150mm dia PVC Pipe
13.2.1:15 mm cement plaster on the rough side of single or half brick wall of mix:1:4 (1 cement :4 fine sand)
Muhammed
Bidder Name
Muhammed
SULAIMAN A M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .