| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.7 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹14.6 L+₹89,288.47 (6.51%)Rejected-Finance KOPPAM PALAKKAD DIST | PALAKKAD | KERALA | 672122 | 2 | Rejected-Finance L2 | |
| 3 | 3₹14.8 L+₹1.1 L (7.92%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical L6 | |
| 5 | Rejected-Technical | - | Rejected-Technical L5 |
| Sl No | Description | Qty | Unit | muhamedrafeek L5 | VINODH L4 | Pradeep A L2 | subin L7 | MOHAMMAD KUNHI L1 | SEVENSMART ENGINEERING AND TRADING PRIVATE LIMITED L8 | HARIS K L6 | Nakshathra construction L9 | A R Constructions L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00COMPOUND WALL MAINTANANCE | ||||||||||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 41.73 | cum | 1,938.15 ₹80,879 | 1,927.51 ₹80,434.99 | 2,000 ₹83,460 | 1,978.62 ₹82,567.81 | 1,446.66 ₹60,369.12 Lowest | 2,010.57 ₹83,901.09 | 1,916 ₹79,954.68 | 2,048.69 ₹85,491.83 | 1,853 ₹77,325.69 |
| 1.00 | 15.8.1:Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m ( stacks of cleaned bricks shall be measured )From brick work in mud mortar | 7,113 | no | 4.38 ₹31,154.94 | 4.36 ₹31,012.68 | 4 ₹28,452 | 4.48 ₹31,866.24 | 3.2 ₹22,761.6 Lowest | 4.55 ₹32,364.15 | 4.3 ₹30,585.9 | 4.64 ₹33,004.32 | 4.2 ₹29,874.6 |
| 1.00 | OD45761/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 24.94 | cum | 3,634.04 ₹90,625.69 | 3,614.08 ₹90,127.93 | 3,000 ₹74,814 Lowest | 3,709.92 ₹92,517.98 | 3,928.5 ₹97,968.93 | 3,769.83 ₹94,012.02 | 3,590 ₹89,527.42 | 3,841.31 ₹95,794.59 | 3,478 ₹86,734.36 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.69 | cum | 9,544.78 ₹1,02,014.61 | 9,492.34 ₹1,01,454.13 | 9,500 ₹1,01,536 | 9,744.07 ₹1,04,144.62 | 8,495.28 ₹90,797.55 Lowest | 9,901.4 ₹1,05,826.16 | 9,400 ₹1,00,467.2 | 10,089.15 ₹1,07,832.84 | 9,090 ₹97,153.92 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 748.16 | kilogram | 102.31 ₹76,544.25 | 101.75 ₹76,125.28 | 102 ₹76,312.32 | 104.45 ₹78,145.31 | 90.72 ₹67,873.08 Lowest | 106.13 ₹79,402.22 | 100 ₹74,816 | 108.15 ₹80,913.5 | 108 ₹80,801.28 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 48.83 | sqm | 351.4 ₹17,157.11 | 349.47 ₹17,062.87 | 370 ₹18,065.25 | 358.74 ₹17,515.48 | 275.4 ₹13,446.41 Lowest | 364.54 ₹17,798.67 | 360 ₹17,577 | 371.45 ₹18,136.05 | 330 ₹16,112.25 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 49.15 | cum | 7,019.32 ₹3,44,971.5 | 6,980.75 ₹3,43,075.94 | 6,700 ₹3,29,278.2 Lowest | 7,165.88 ₹3,52,174.34 | 6,804 ₹3,34,389.38 | 7,281.58 ₹3,57,860.53 | 7,400 ₹3,63,680.4 | 7,419.65 ₹3,64,646.12 | 6,710 ₹3,29,769.66 |
| 1.01 | OD45760/2026-2027:Brick work with Departmental brick. Brick Work with common burnt burnt clay F.P.S (non-modular) bricks of class designation 5.0
in foundation and plinth in cement mortar 1:6 (1 cement:6 coarse sand) | 15.19 | cum | 3,806.41 ₹57,811.76 | 3,785.5 ₹57,494.17 | 4,000 ₹60,752 | 3,885.89 ₹59,018.9 | 2,900 ₹44,045.2 Lowest | 3,948.63 ₹59,971.79 | 3,850 ₹58,473.8 | 4,023.5 ₹61,108.92 | 3,640 ₹55,284.32 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 150 | kg | 162.36 ₹24,354 | 161.47 ₹24,220.5 | 150 ₹22,500 | 165.75 ₹24,862.5 | 144.99 ₹21,748.5 Lowest | 168.43 ₹25,264.5 | 160 ₹24,000 | 171.62 ₹25,743 | 155 ₹23,250 |
Tender Value
₹16.9 L
EMD Value
₹42,361
Closing Date
10 Aug 2026, 4:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER DISTRICT PANCHYATH OFFICE PALAKKAD
Annual Plan-DP PKD 2026-27 COMPOUND WALL AND INTERLOCK LAYING IN GVHSS KANJIKODE IN PUDUSSERY DIVISION
2026_LSGD_863060_28
02/AEE/2026-27 DT-28.07.2026
Open Tender
Civil Works - Others
Item Rate
210 days
DISTRICT PANCHAYATH PALAKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,361
Yes
29 Sept 2026
1 Aug 2026
13 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1COMPOUND WALL MAINTANANCE | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.002 | 15.8.1:Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m ( stacks of cleaned bricks shall be measured )From brick work in mud mortar | - | no | - | - |
| 1.003 | OD45761/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 1 | cum | - | - |
| 1.004 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.007 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | - | - |
| 1.008 | OD45760/2026-2027:Brick work with Departmental brick. Brick Work with common burnt burnt clay F.P.S (non-modular) bricks of class designation 5.0
in foundation and plinth in cement mortar 1:6 (1 cement:6 coarse sand) | - | cum | - | - |
| 1.009 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1460526.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.04 MB
Tendernotice_3.pdf
PDF • 0.14 MB
Tendernotice_4.pdf
PDF • 0.06 MB
Tendernotice_5.pdf
PDF • 0.07 MB
Tendernotice_6.pdf
PDF • 1.64 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.91 MB
BOQ_1460526.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .