Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC Firdt lowest | |
| 2 | L2₹3.7 L+₹69,920.10 (23.1%)Rejected-AOC | L2 | Rejected-AOC Second lowest | |
| 3 | L3₹3.9 L+₹85,739.32 (28.4%)Rejected-AOC | L3 | Rejected-AOC Third lowest |
Tender Value
₹4.9 L
EMD Value
₹12,282
Closing Date
30 Oct 2023, 5:00 pmClosed
Assistant Executive Engineer
Minor Irrigation Subdivision Muvattupuzha
GENERAL-2023-24 Annual Maintenance - Annual maintenance of Kadathy LI scheme for the year 2023-24
2023_Irrig_613465_1
IRR/IA/2963/2023-2024
Open Tender
Civil Works - Others
Item Rate
180 days
KADATHY
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,085
Yes
₹12,282
Yes
28 Nov 2023
21 Oct 2023
1 Nov 2023
21 Oct 2023
30 Oct 2023
21 Oct 2023
Amount
Detailed Estimate
OD8795/2023-2024:Engaging Beldar for cleaning and clearing pump house premises and delivery pit
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
M A JOSE
Jomin Benny
Bidder Name
Benny O.M.
M A JOSE
Jomin Benny
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_917741.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .