Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically qualified it is cancelled being L3 | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically qualified it is rejected being L2 |
| Sl No | Description | Qty | Unit | SANAL KUMAR L3 | JOSE C L1 | SOORAJ V J L2 |
|---|---|---|---|---|---|---|
| 1.00Drain Construction | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 129.4 | cum | 309.99 ₹40,112.71 | 286 ₹37,008.4 | 200 ₹25,880 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 11.05 | cum | 6,836.04 ₹75,538.24 | 6,326 ₹69,902.3 Lowest | 7,600 ₹83,980 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 68.24 | cum | 9,038.53 ₹6,16,789.29 | 8,364.2 ₹5,70,773.01 Lowest | 9,875 ₹6,73,870 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,529.2 | kilogram | 96.88 ₹5,35,668.9 | 89.65 ₹4,95,692.78 Lowest | 98 ₹5,41,861.6 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 307 | sqm | 723.51 ₹2,22,117.57 | 669.5 ₹2,05,536.5 | 500 ₹1,53,500 Lowest |
| 1.01 | 16.75:Providing and laying C.C pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator, vacuum dewatering process and finally finished by floating brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge ( The panel shuttering work shall be paid for separately)
(Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less
cement used as per design mix is payable/ recoverable separately). | 5.1 | cum | 9,686.73 ₹49,402.32 | 8,277.55 ₹42,215.51 Lowest | 10,100 ₹51,510 |
Tender Value
₹18.3 L
EMD Value
₹45,659
Closing Date
15 Oct 2025, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-Construction of new drain in front of Civil station Kudappanakkunnu near vehicle shed-Civil wok
2025_PWD_805756_1
TR/19202/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
90 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹45,659
Yes
13 Nov 2025
6 Oct 2025
18 Oct 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .