Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.5 L
EMD Value
₹5,510
Closing Date
25 Nov 2026, 5:30 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
Superintending Engineer, M.I. Division, Jharsuguda, At-Pahadi Mandir, Po-K.M.Road,Dist-Jharsuguda, Pin-768202
Improvement to Hatituda Check Dam in Laikera block under Improvement to Check Dam scheme in Jharsuguda district for the year 2026-27.
2026_CEMIB_146011_2
TCN-05/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Jharsuguda
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹5,510
Yes
16 Nov 2026
16 Nov 2026
26 Nov 2026
16 Nov 2026
25 Nov 2026
16 Nov 2026
16 Nov 2026 - 23 Nov 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: SUPERINTENDING ENGINEER,MINOR IRRIGATION DIVISION, JHRSUGUDA
Name of Work: Improvement to Hatituda Check Dam in Laikera block under Improvement to Check Dam scheme in Jharsuguda district for the year 2026-27.
Contract No: SEMID JSD 05 OF 2026-27.
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category . TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC within an initial lead of 1 km. from the place of excavation complete. 638.04 One Cubic Meter 82 Excess(+) Full Conversion INR
2 Cement Concrete M20 grade with crushed granite coarse aggregate of 20 mm down grade size in concrete mixture including cost of all materials ,machineries and labouer with all lead for materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground level etc. complete in all respect to proper slope & level with all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge. 51.3 One Cubic Meter 6031.1 Excess(+) Full Conversion INR INR Three Lakh Nine Thousand Three Hundred & Ninety Five and Paise Forty Three Only
3 Straightening, cutting, bending, binding and tying the grills and placing them in position of approved design includign cost and conveyance of TMT bar(HYSD) and binding wire 18 to 20 gauge complete as directed by the Engineer-in-Charge. 5.13 One Quintal 9610.5 Excess(+) Full Conversion INR INR Forty Nine Thousand Three Hundred & One and Paise Eighty Seven Only
4 Providing and removing rigid smooth centering and shuttering for C.C./R.C.C. lintel work including cost and conveyance of the materials required for the work complete in all respect as directed by the Engineer-in-Charge 137 One Square Meter 250.5 Excess(+) Full Conversion INR INR Thirty Four Thousand Three Hundred & Eighteen and Paise Fifty Only
5 Filling in foundation and plinth with sand watering and ramming as directed by the EIC. 12.68 One Cubic Meter 54.7 Excess(+) Full Conversion INR INR Six Hundred & Ninety Three and Paise Sixty Only
6 Rough stone dry packing in aprons and revetments to all heights with hard stone of size 30cm and above, weight not less than 40kg/piece including cost,conveyance, royalty to proper slope and level complete in all respect as directed by the Engineer-in-Charge. 42.35 One Cubic Meter 2472.2 Excess(+) Full Conversion INR INR One Lakh Four Thousand Six Hundred & Ninety Seven and Paise Sixty Seven Only
Total in Figures INR Five Lakh Fifty Thousand Seven Hundred & Twenty Six and Paise Thirty Five Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
DTCN.pdf
Tender Documents • 6.58 MB
BOQ_620461.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .