| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹3.8 L+₹96,819.18 (34.7%)Rejected-AOC | ₹3.8 L+₹96,819.18 (34.7%) | L2 | Rejected-AOC L2 |
| 3 | L3₹3.9 L+₹1.1 L (40.1%)Rejected-AOC | ₹3.9 L+₹1.1 L (40.1%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Negi Constructions L2 | Universal Engineering L3 | AADRITI POWER AND INFRATECH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of Stay Clamp S/E for SP-23 with N&B | 16 | Nos | 405 ₹6,480 | 415 ₹6,640 | 295 ₹4,720 Lowest |
| 2.00 | Supply of Stay Clamp D/E for SP-23 with N&B | 7 | Nos | 305 ₹2,135 | 308 ₹2,156 | 245 ₹1,715 Lowest |
| 3.00 | Supply of Top Channel Clamp for SP-23 Pole | 41 | Nos | 330 ₹13,530 | 331 ₹13,571 | 205 ₹8,405 Lowest |
| 4.00 | Supply of Earth wire Clamp For SP-10 with N&B | 14 | Nos | 410 ₹5,740 | 400 ₹5,600 | 265 ₹3,710 Lowest |
| 5.00 | Supply ofHolding Clamp for TPMO & Fuse Set SP-23 with N&B | 12 | Nos | 320 ₹3,840 | 323 ₹3,876 | 205 ₹2,460 Lowest |
| 6.00 | Supply of Bracing Clamp Top for SP-23 with N&B | 14 | Nos | 315 ₹4,410 | 300 ₹4,200 | 260 ₹3,640 Lowest |
| 7.00 | Supply of Bracing Clamp Bottom for SP-23 with N&B | 14 | Nos | 415 ₹5,810 | 405 ₹5,670 | 280 ₹3,920 Lowest |
| 8.00 | Supply of AL Crimpling Type Lugs 70 Sq.mm. | 8 | Nos | 125 ₹1,000 | 126 ₹1,008 | 77 ₹616 Lowest |
| 9.00 | Cartage of SP-21/23 Pole 21-50 Km | 21 | Nos | 705 ₹14,805 | 712 ₹14,952 | 630 ₹13,230 Lowest |
| 10.00 | Cartage of Petty Material 21-50 Km | 25.52 | Qtl | 515 ₹13,142.8 | 510 ₹13,015.2 | 400 ₹10,208 Lowest |
Tender Value
₹2.8 L
EMD Value
₹11,200
Closing Date
16 Apr 2025, 3:00 pmClosed
EE, EDD Almora
Laxmeshwar, Almora
Construction of HT and LT Line and Transformer to release New Service Connection for Rajkiya Polytechnic Takula with supply of decentralised material under EDD Almora
2025_UPCL9_81951_1
70/2024-25/EDD(A)
Open Tender
Electrical Works
Item Wise
365 days
EDD Almora
As per tender document
2 documents required · 2 mandatory
₹295
EE, EDD Almora
₹11,200
1 Sept 2025
25 Mar 2025
17 Apr 2025
1 Apr 2025
16 Apr 2025
1 Apr 2025
Amount
Supply of Stay Clamp S/E for SP-23 with N&B
Supply of Stay Clamp D/E for SP-23 with N&B
Supply of Top Channel Clamp for SP-23 Pole
Supply of Earth wire Clamp For SP-10 with N&B
Supply ofHolding Clamp for TPMO & Fuse Set SP-23 with N&B
Supply of Bracing Clamp Top for SP-23 with N&B
Supply of Bracing Clamp Bottom for SP-23 with N&B
Supply of AL Crimpling Type Lugs 70 Sq.mm.
Cartage of SP-21/23 Pole 21-50 Km
Cartage of Petty Material 21-50 Km
Cartage of 63 KVA DTR 21-50 Km
Headload Cartage of Material (1-3 Km)
Headload Cartage of 63 KVA DTR (1-3 Km)
Excavation of Pit for Pole
Erection of Single SP-23 Pole
Erection of Double SP-23 Pole
Grouting of Pole
Muffing Of Pole
Febrication of Steel
Excavation of pit for Stay Set
Erection of LT Stay Set
Grouting of Stay Set
Erection of Earthing Rod
Guarding of LT/11KV Line
Lopping & Chopping of Tree Branches
Laying of Weasel Conductor in HT Line
Installation of 63 Kva DTR on Pole Structure
Fixing of TPMO
Fixing of Fuse Set
Fixing of Lightning Arrestor
Chemical Earthing
Laying of LT PVC Cables (up to 150 Sq.mm)
Installation of Danger Board/Number Plate
Headload Cartage SP-21/23 Pole (1-3 Km)
Installation of LT PRMC
Negi Constructions (BID ID -374663)
Universal Engineering (BID ID -374681)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .