| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹15.8 L+₹85,699 (5.73%)Rejected-AOC | L2 | Rejected-AOC Not Lowest | |
| 3 | L3₹15.8 L+₹89,393 (5.98%)Rejected-AOC 164 197 NEWAJPUR DASAULI KURSI ROAD LUCKNOW UTTAR PRADESH 226026 | LUCKNOW | UTTAR PRADESH | 226026 | L3 | Rejected-AOC Not Lowest | |
| 4 | L4₹16.0 L+₹1.1 L (7.09%)Rejected-AOC | L4 | Rejected-AOC Not Lowest | |
| 5 | L5₹16.8 L+₹1.9 L (12.4%)Rejected-AOC 202 NEW RAM VIHAR COLONY PINTO PARK MORAR GWALIOR 474005 | GWALIOR | GWALIOR | MP | 474005 | L5 | Rejected-AOC Not Lowest |
Tender Value
₹23.3 L
EMD Value
₹46,500
Closing Date
6 Jan 2024, 6:00 pmClosed
CWE HILLS DEHRADUN
HQ CWE HILLS, MALL ROAD, DEHRADUN CANTT- 248003.
PROVISION OF APFC PANELS FOR WATER SUPPLY INSTALLATION UNDER AGE (I) MES LANSDOWNE.
2023_MES_631931_1
87175/LDN/E8
Open Tender
Electrical and Maintenance Works
Item Rate
150 days
AGE (I) LANSDOWNE
Class E Category b(i)
6 documents required · 6 mandatory
₹500
AGE I LANSDOWNE
₹46,500
Yes
7 Mar 2024
9 Dec 2023
13 Jan 2024
9 Dec 2023
6 Jan 2024
25 Dec 2023
Amount
Supply, installing, testing and commissioning of Automatic power factor improvement capacitor ( APFC ) having aggregate capacity : 125 KVAR Outdoor type in 12 stages with micro processor based, platform mounted, suitable for 415 Volts 3 Phase and neutral, 4 wire, 50Hz AC supply system. Shall be dust and vermin proof, protection class (IP-54) and made of 3.15 mm thick CRCA Sheet having bus bar of aluminium 300 Amps capacity , three phase and one neutral fixed on insulator and bus bar insulated by coloured heat shrinkable sleeve with suitable frame work/ support made out of 50 x 50 x 6 mm, front opening type with space for cable entry from back side of the panel, with proper ferrule & cable gland, internal wiring with PVC insulated multistranded copper conductor FR cable of adequate size but not less than 1.5 sqmm complete (at IInd Stage P/H and IInd Lift Pump House Installation, Location of IInd Stage pump house is located at hilly terrain and not approachable by road, new LT Panel transport by manually is required which is approx 1.8 Km). All steel metal works including frame shall be with anticorrosive coating with seven tank process and finally epoxy polyester powder coating of Siemens grey RAL- 7035 shade. The scope of work also comprising of the following:-
(1) Incoming MCCB 200 Amps 25 KA 4 Pole Adjustable thermal & fixed magnetic setting Ics=100% of Icu - 01 No (2) Microprocessor based Power factor corrector relay 12 stage -01 No. (3) Capacitor duty contactor for 25 KVAR, - 02 Nos (4) Capacitor duty contactor for 20 KVAR, - 01 Nos. (5) Capacitor duty contactor for 15 KVAR, - 01Nos. (6) Capacitor duty contactor for 10 KVAR, - 02 Nos. (7) Capacitor duty contactor for 05 KVAR, - 02 Nos (8) Power contactor 9 A 3 Pole for 03 KVAR, -01 Nos. (9) Power contactor 9 A 3 Pole for 02 KVAR, -01 Nos. (10) Power contactor 9 A 3 Pole for 01 KVAR, -02Nos (11) MCB 63 A,10 KA TP C Curve - 02 Nos. (12) MCB 40 A,10 KA TP C Curve - 01 No. (13) MCB 32 A,10 KA TP C Curve - 01 No. (14) MCB 25 A,10 KA TP C Curve - 02 Nos. (15) MCB 16 A,10 KA TP C Curve - 06 Nos.
Supply, installing, testing and commissioning of Automatic power factor improvement capacitor ( APFC ) having aggregate capacity : 100 KVAR Outdoor type in 12 stages with micro processor based, platform mounted, suitable for 415 Volts 3 Phase and neutral, 4 wire, 50Hz AC supply system. Shall be dust and vermin proof, protection class (IP-54) and made of 3.15 mm thick CRCA Sheet having bus bar of aluminium 250 Amps capacity , three phase and one neutral fixed on insulator and bus bar insulated by coloured heat shrinkable sleeve with suitable frame work/ support made out of 50 x 50 x 6 mm, front opening type with space for cable entry from back side of the panel, with proper ferrule & cable gland, internal wiring with PVC insulated multistranded copper conductor FR cable of adequate size but not less than 1.5 sqmm complete (at Zero Stage Pump House Installation, Location of Zero Stage pump house is located at hilly terrain and not approachable by road, new LT Panel transport by manually is required which is approx 2.5 Km). . All steel metal works including frame shall be with anticorrosive coating with seven tank process and finally epoxy polyester powder coating of Siemens grey RAL- 7035 shade. The scope of work also comprising of the following:-
Supply, installing, testing and commissioning of Automatic power factor improvement capacitor ( APFC ) having aggregate capacity : 50 KVAR Outdoor type in 8 stages with micro processor based, platform mounted, suitable for 415 Volts 3 Phase and neutral, 4 wire, 50Hz AC supply system. Shall be dust and vermin proof, protection class (IP-54) and made of 3.15 mm thick CRCA Sheet having bus bar of aluminium 150 Amps capacity , three phase and one neutral fixed on insulator and bus bar insulated by coloured heat shrinkable sleeve with suitable frame work/ support made out of 50 x 50 x 6 mm, front opening type with space for cable entry from back side of the panel, with proper ferrule & cable gland, internal wiring with PVC insulated multistranded copper conductor FR cable of adequate size but not less than 1.5 sqmm complete (at Jharapani Pump House Installation). All steel metal works including frame shall be with anticorrosive coating with seven tank process and finally epoxy polyester powder coating of Siemens grey RAL- 7035 shade. The scope of work also comprising of the following:-
Supply, installing, testing and commissioning of Automatic power factor improvement capacitor ( APFC ) having aggregate capacity : 40 KVAR Outdoor type in 8 stages with micro processor based, platform mounted, suitable for 415 Volts 3 Phase and neutral, 4 wire, 50Hz AC supply system. Shall be dust and vermin proof, protection class (IP-54) and made of 3.15 mm thick CRCA Sheet having bus bar of aluminium 150 Amps capacity , three phase and one neutral fixed on insulator and bus bar insulated by coloured heat shrinkable sleeve with suitable frame work/ support made out of 50 x 50 x 6 mm, front opening type with space for cable entry from back side of the panel, with proper ferrule & cable gland, internal wiring with PVC insulated multistranded copper conductor FR cable of adequate size but not less than 1.5 sqmm complete( at 15 Lakh Gallon Pump House Installation). All steel metal works including frame shall be with anticorrosive coating with seven tank process and finally epoxy polyester powder coating of Siemens grey RAL- 7035 shade. The scope of work also comprising of the following:-
Note : for Item Ser No 01 to 04 above The panel manufacturer should have following Govt. Approved Certificates: 1. Panel should be according to IEC-61439. CPRI Certification Degree of Protection IP-54 (IS/IEC : 61439 (Part-1), 2011 & IS/IEC : 61439 (Part-2) 2011) 2. Temprerature Rise (IS/IEC : 61439-1, 2011 & IS/IEC : 61439-2 2011) 3. CPRI Short Circuit IEC-61439-1 & 2 withstand strenght should be 70kArms for 1.0 Sec with intial peak of 154kApk 4. CPRI Certification IEC-61439-1 & 2 Rated current for short circuit not less than 4000 A with rated insulation voltage 660V 5. ISO 9001 CERTIFIED
Supplying, laying, jointing and testing of 1.1 KV grade XLPE insulated PVC sheathed steel armoured aluminum stranded conductor LT UG cable (Conforming to IS 7098) ISI marked in trenches/ ducts/ through GI pipes under roads of following size cable complete all as specifed and directed :- Note :- The earth work, GI pipe shall be measured and paid sepretely under appropriate item of Sch A.
Size 240 sqmm 3.5 core.
Size 185 sqmm 3.5 core
Size 70 sqmm 3.5 core.
Size 50 Sqmm 3.5 core.
Excavation in trenches n.exc 1.5 m width and n.exc 1.5 m in depth for foundation etc or for shafts, well, cess pits, manholes, pier holes etc n.ex 10 Sqm on plan and n.exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm. complete all as specified and directed.
Removing excavated materials to a distance n'exc. 50 Mtr and depositing where directed at a level not exc 1.5m above the starting point complete all as specified and directed.
M&L for laying river dry and clean sand filling for cushioning in layer 8 cm before laying cable and 15 cm after laying cable in trenches and punned upto 18 cm thick around under ground cable complete all as specified and directed. Note :- Thickness after punning shall be measured for payment.
Supply and laying cable protection bricks, common burnt clay sub class 'B' designation 75 for protection of UG cable laid in trenches with axis of the bricks perpendicular to the axis of the cable complete all as specified and directed.
M&L for earthing complete with galvanised steel earth plate electrode 600mm X 600mm X 6mm thick buried directly in ground vertically earth pit not less than 2.25 meter deep below normal ground level (with top edge of earth plate not less than 1.5 meter below ground level) connected to GI earth strip of size 25x4 mm as earthing lead by means of bolts, nuts and washers all as shown in electrical plate No 3 of MES Scedule part I (2009) with conected to eath test point including adequate quantity of charcoal dust and comman salt, PCC (1:3:6) type C-1 chamber and for earth pit with 40x40x6mm mild steel angle iron frame for cover. precast RCC cover 40mm thick (1:2:4) type B1 using 20 mm graded stone aggregate reinforced with 8 mm dia round bars both ways with MS handle 8 mm dia. PGI funnel and wire mesh 20 mm dia GI pipe medium grade for watering and 32mm dia medium earth lead protection pipe complete all as specified and directed. Note:- (i) RCC pit cover shall be precast of RCC(1:2:4) type B1, 80mm thick reinforced with XPM weighing not less than 4kg/sqm in lieu of CI cover. (ii) GI earth strip and protection pipe upto and including 7.5m is deemed included in unit rate quoted by contractor.
S&F galvanized steel water tubing (GI Pipe) light grade (ISI marked) with all fittings as in sleeving for cable protection & laid in trenches/ floor or fixed to wall, ceiling and pole of following bore complete as specified and directed :- Note : MS Clamp, nut bolts and washer shall be measured and paid seperatly for fixing with pole etc.
80mm bore
100mm bore
ANAND SERVICES
SIYA ASSOCIATES
CHAUDHARY FURNITURE HOUSE
automation and switchgear control
RAMSONS DEVELOPERS
M/s RP AGRAWAL
Aziz Traders
AMAN MATERIAL AND LABOUR CONTRACTOR
BK CONSTRUCTION
Vinayak Trading House
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .