Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹5.0 L+₹4,706.10 (0.95%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest | |
| 3 | L3₹5.0 L+₹5,235.71 (1.06%)Rejected-AOC | L3 | Rejected-AOC 3rd lowest | |
| 4 | L4₹5.1 L+₹17,734.90 (3.58%)Rejected-AOC | L4 | Rejected-AOC 4th lowest | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-integrity pact certificate not up loaded |
Tender Value
₹5.8 L
EMD Value
₹8,705
Closing Date
28 Dec 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
Office of the assistant executive engineer PWD roads sub division Tirur
GENERAL-OR-Urgent Rectification and pot holes filling works to Omanoor Kuzhimanna road Between Km 0/000 and 4/500 in kondotty LAC
2021_PWD_462124_1
D2/102551/2021-22 DT.21.12.2021
Open Tender
Civil Works - Roads
Item Rate
90 days
Kondoty
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,280
Yes
₹8,705
Yes
8 Jun 2022
21 Dec 2021
31 Dec 2021
21 Dec 2021
28 Dec 2021
21 Dec 2021
60 days
Amount
Detailed Estimate
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.7.1:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade.
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
P.P.NOUSHAD ALI
SHABEER K.K.
mammoo
Bidder Name
K. KUTTIRAYIN
P.P.NOUSHAD ALI
SHABEER K.K.
mammoo
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_661324.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .