Loading…
Loading…
Tender Value
₹49.1 L
EMD Value
₹50,000
Closing Date
7 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Petlad Irrigation Division Petlad
Constructing box type VRB in place of existing damaged pipe VRB @ ch. 8230 m. on Manej Distry.
283425
21 of 2025-26
Open
Miscellaneous Works
Anand
8 documents required · 7 mandatory · 1 optional
₹1,500
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹50,000
Yes
9 Mar 2026
9 Mar 2026
9 Mar 2026
7 Apr 2026
9 Mar 2026
Name of work :- Constructing Box type V.R.B. in place of existing damaged Pipe V.R.B. at ch
8230 mt. on Manej Distry.
Sr.No Quntity Item Unit Estimated Rate without GST
Without GST Rs.
In figures In World
Dismantalling the existing Brick Rs. Seven
masonry including sorting out and Hundred
stacking the useful material and Fifty &
1 84.00 removing the debries and making good CM 750.90 Ninety Paise
the damages etc. comnpleted. (a) in Only
Dismantling the existing R.C.C. Pipes Rs. Eight
including sorting out and stacking of Hundred
the useful materials of the following Sixty Six &
diameters including refilling the Forty Paise
trenches etc. complete as Only
directed.NP_2 pipes 600 mm. to
Dismantling the existing R.C.C. Pipes Rs. One
including sorting out and stacking of Thousand
the useful materials of the following Two Hundred
diameters including refilling the Seventy &
trenches etc. complete as Seventy Paise
directed.NP_1000 mm. to 1200 mm. Only
Excavation for foundation in all sorts
of soil including yellow sandy gravelly
soils ,soft & hard murrum etc. in dry
condition including depositing the Rs. One
excavated stuff in uniform layers in Hundred
3 801.00 banks or as and where directed etc. CM 107.80 Seven &
complete for lead upto 500 m and all Eighty Paise
lift. (BY MACHINERY) Only
(a) Including dewatering.
Providing & Laying in position
"NOMINAL MIX" cement concrete
using cement, sand and crushed
aggregate by mass and machine mix
for C.C./R.C.C work incl. necessary
formworks centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc
complete Without Dewatering and
excluding cost of steel reinforcement.
(A) For Foundation concrete / General Rs. Three
purpose Thousand
(a) C. C. Nominal Mix, M-10 and MSA- Three
4 192.00 40 mm CM 3346.00 Hundred
Providing & Laying in position
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI"
including necessary formwork,
centering, scaffolding, compaction by
vibrator, curing as directed with all
lead & lift etc complete without
dewatering and excluding the cost of
steel reinforcement.
(A) For Footing of column / Abutment Rs. Four
/ Pier / Bottom slab of barrel / Plinth Thousand
5.a 71.00 course / Coping / Approach Slab CM 4190.00 One Hundred
etc.(e) Concrete grade M-15 and MSA- Ninety Only
(A) For Footing of column / Abutment Rs. Four
/ Pier / Bottom slab of barrel / Plinth Thousand Six
5.b 92.00 course / Coping / Approach Slab CM 4651.00 Hundred
etc.(e) Concrete grade M-25 and MSA- Fifty One
(B) For Pier and Abutments / Wing Rs. Four
wall / Head wall / Return wall / Dowel Thousand
Wall etc.(g) Concrete grade M-15 and Four
5.c 94.00 MSA-20 mm CM 4457.00 Hundred
(E) For Column / Beam / Solid Slab of Rs. Five
Road Bridge / Barrel / Cutoff wall etc. Thousand Six
5.d 125.00 (q) Concrete grade M-25 and MSA-20 CM 5642.00 Hundred
(D) For Kerb / Wearing coat. Rs. Five
(n) Concrete grade M-25 and MSA -10 Thousand
5.e 19.00 CM 5481.00 Hundred
(F) For Parapet wall of Road Bridge / Rs. Eight
Structure. Thousand
5.f 3.00 (t) Concrete grade M-25 and MSA -10 CM 8023.00 Twenty Three
Providing and laying plain/reinforced Rs. Four
cement concrete lining of M 15 (MSA Hundred
20 mm) in bed, side slopes and Fifteen &
curvature including batching, mixing, Eighty Paise
transporting, placing, vibrating, Only
smooth finishing, curing including
6 258.800 dewatering where SM 415.80
required.(MACHINERY BASED by
"FLORI" - WITHOUT PAVER WATER
10 cm thick lining in Bed / Slope
Providing & Placing in position Rs. Eighty
reinforcement bars including cutting, Two
bending, welding joints where Thousand
necessary, hooking etc. complete as Ninteen Only
per drawing for all lead and lifts.
(B) TMT / CRS bars
Providing and fixing in position pre- Rs. One
moulded asphalt or bitumen cork Thousand
board of approved quality and Two Hundred
specifications as per design and Eighty Six &
drawing. Fifty Paise
20 mm thickness Only
Providing and laying in position 110 Rs. Two
mm dia (6 kgf/sq cm) P.V.C. Pipe for Hundred
weep holes with non corroding jali in Sixty Two &
9 24.80 abutments, wing walls, retaining walls Rmt. 262.50 Fifty Paise
etc. complete. Only
Providing and fixing 110 mm diameter Rs. Three
P.V.C..Pipe (6 kgf / sq cm) Water spout Hundred
10 6.40 with necessary iron grating as per Rmt. 369.20 Sixty Nine &
design Twenty Paise
Back filling the foundation trenches Rs. Thirty Six
around the structures etc with & Ninety
selected excavated stuff including Paise Only
11 60.00 watering, ramming, compacting etc. CM 36.90
complete. (By Machinery)
Providing temporary all weather and Rs. Two Lac
fair weather diversion suitable for Thirty
traffic during the construction period Thousand
of the bridge including providing Ninety Only
necessary drains and all safty
12 1.00 measures including red lamps/ signals No. 230090.00
at night for traffic etc. complete.
Total Rs…(Without GST)
Rs. Forty Nine Lac Nine Thousand Six Hundred Fifty Five & Ninety Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division
or as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be
filled in inkand total of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects
and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt
= Running metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs.5483.37/M.T. (Rate as per
CGWRD SOR 2023-24
Techanically Checked By me…................
Arithmetically Checked By me….....................
Deputy Executive Engineer Divisional Account Officer
Petlad Irrigation Sub Division Petlad Irrigation Division
Executive Engineer
Petlad Irrigation Division
Name of Constructing Box type V.R.B. in place of existing damaged Pipe V.R.B. at ch 8230 mt.
Work:- on Manej Distry.
CEMENT CONSUMPTION
Sr No. Item Description Quantity Unit consumptio Total Cement M.T.
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by mass
and machine mix for C.C./R.C.C work incl. necessary
1 4 formworks centering, scaffolding, compaction by vibrator, 192.00 Cum 0.22
curing as directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel reinforcement.
(A) For Foundation concrete / General purpose
(a) C. C. Nominal Mix, M-10 and MSA-40 mm
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as directed with all
lead & lift etc complete without dewatering and excluding the
cost of steel reinforcement.
(A) For Footing of column / Abutment / Pier / Bottom slab of
5.a barrel / Plinth course / Coping / Approach Slab etc.(e) Concrete 71.00 Cum 0.30
grade M-15 and MSA-20 mm
(A) For Footing of column / Abutment / Pier / Bottom slab of
5.b barrel / Plinth course / Coping / Approach Slab etc.(e) Concrete 92.00 Cum 0.38
grade M-25 and MSA-20 mm
(B) For Pier and Abutments / Wing wall / Head wall / Return
5.c wall / Dowel Wall etc.(g) Concrete grade M-15 and MSA-20 mm 94.00 Cum 0.30
(E) For Column / Beam / Solid Slab of Road Bridge / Barrel /
5.d Cutoff wall etc. 125.00 Cum 0.38
(q) Concrete grade M-25 and MSA-20 mm
(D) For Kerb / Wearing coat.
(n) Concrete grade M-25 and MSA -10 to 20mm
(F) For Parapet wall of Road Bridge / Structure.
(t) Concrete grade M-25 and MSA -10 to 20 mm
Providing and laying plain/reinforced cement concrete lining of
M 15 (MSA 20 mm) in bed, side slopes and curvature including
batching, mixing, transporting, placing, vibrating, smooth
3 6 finishing, curing including dewatering where 258.80 SM 0.03
required.(MACHINERY BASED by "FLORI" - WITHOUT
PAVER WATER CURING)
10 cm thick lining in Bed / Slope
Section Officer Deputy Executive Engineer
Petlad-1 Section Petlad Irrigation Sub Division
Percentage Calculation
Name of work :- Constructing Box type V.R.B. in place of existing damaged Pipe V.R.B. at ch 8230 mt. on Manej Distry.
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost Total %
Sr. Estimated but according to estimated Rs. Per Cost Per Unit Cost Unit Cost Per Unit Bitumen Cost Unit y Per Unit Machinery Comodity Comodity Cost per Unit
No. may be more Rs. Unit Cost Per Unit
Dismantalling the existing Brick masonry
including sorting out and stacking the
useful material and removing the debries
comnpleted. (a) in cement mortar
Dismantling the existing R.C.C. Pipes
including sorting out and stacking of the
useful materials of the following diameters
complete as directed.NP_2 pipes 600 mm.
Dismantling the existing R.C.C. Pipes
including sorting out and stacking of the
useful materials of the following diameters
complete as directed.NP_1000 mm. to
Excavation for foundation in all sorts of
soil including yellow sandy gravelly soils
,soft & hard murrum etc. in dry condition
including depositing the excavated stuff in
uniform layers in banks or as and where
m and all lift. (BY MACHINERY)
(a) Including dewatering.
Providing & Laying in position "NOMINAL
MIX" cement concrete using cement, sand
and crushed aggregate by mass and
machine mix for C.C./R.C.C work incl.
necessary formworks centering,
scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc
complete Without Dewatering and
excluding cost of steel reinforcement.
(A) For Foundation concrete / General
(a) C. C. Nominal Mix, M-10 and MSA-40
Providing & Laying in position "DESIGN
MIX" cement concrete using cement sand
and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as directed
with all lead & lift etc complete without
dewatering and excluding the cost of steel
(A) For Footing of column / Abutment /
Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc.(e)
Concrete grade M-15 and MSA-20 mm
(A) For Footing of column / Abutment /
Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc.(e)
Concrete grade M-25 and MSA-20 mm
Percentage Calculation
Name of work :- Constructing Box type V.R.B. in place of existing damaged Pipe V.R.B. at ch 8230 mt. on Manej Distry.
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost Total %
Sr. Estimated but according to estimated Rs. Per Cost Per Unit Cost Unit Cost Per Unit Bitumen Cost Unit y Per Unit Machinery Comodity Comodity Cost per Unit
No. may be more Rs. Unit Cost Per Unit
(B) For Pier and Abutments / Wing wall /
Head wall / Return wall / Dowel Wall
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 21 of 2025-26 online.pdf
1.page.pdf
3. Notice Inviting tender.pdf
4.SBD.pdf
5.Itemwise specifications.pdf
6.schedule B 8230 manej distry.pdf
Download all tender documents and submit your bid