Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
19 Dec 2023, 12:00 pmClosed
Head Purchase
KELTRON COMMUNICATION COMPLEX TRAFFIC SIGNAL DIVISION MONVILA, KULATHOOR.P.O, THIRUVANANTHAPURAM-695583
Rate contract for the Installation of various types of Traffic Signals Road Warning Blinkers and LED Street lights
2023_KSEDC_629407_1
KSEDC/KCC/TSD/RC/0001/23-24
Open Tender
Civil Works - Others
Item Rate
VARIOUS SITES IN KERALA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
10 Jan 2024
7 Dec 2023
20 Dec 2023
7 Dec 2023
19 Dec 2023
7 Dec 2023
Amount
ITEM No.: 1. SUPPLY OF MATERIALS 1. Supply of PVC pipe a) 2" (50mm) dia
b) 3" (75mm) dia
c) 4" (100mm) dia
2. Supply of GI pipe (ISI) Class B a) 1.5" (38mm) dia
b) 2" (50mm) dia
c) 3" (75mm) dia
d) 4" (100mm) dia
3. Supply of 8 SWG GI wire for overhead cabling
4. Supply of 14 SWG GI wire for earthing
5. Supply of Cable glands 20mm/25mm/30mm suitable for cable termination in Controller
6. Supply of HDPE pipe (As per IS:4984:1995) a) 2" (50mm) dia
b) 3" (75mm) dia
c) 4" (100mm) dia
ITEM No.: 2. CIVIL WORK 7. Excavation of trench and refilling the same after laying GI/PVC pipe of various diameter a) Soft cutting 1' x 0.5'
b) Semi Hard cutting 1' x 0.5'
c) Hard cutting (carriage way/rock surface) 1' x 0.5'
8. Excavation of trench and refilling the same (without pipe laying) a) Soft cutting 1' x 0.5'
b) Semi Hard cutting 1' x 0.5'
c) Hard cutting (carriage way/rock surface) 1' x 0.5'
9. Restoration Charges including material cost for excavated portion of the carriage way with 1:2:4 PCC
10. Asphalting and Restoration Charges including material cost for excavated portion of the carriage way
11. Excavation of RCC/PCC surface including island median etc.
12. Trenchless horizontal drilling under the road surface including laying of HDPE pipe of dia a) 2" (50mm) dia
b) 3" (75mm) dia
c) 4" (100mm) dia
13. Slot cutting 40mm width 200mm depth (saw cut) on carriage way for laying of control cable where standard excavation is not permitted. This is inclusive of slot cutting, slot cleaning bedding of control cable and refilling with PCC/ hot bitumen seal
14. Slot cutting 4mm width 20 mm depth (saw cut) on carriage way for laying of loop cable for vehicle sensor placement or any other purpose. This is inclusive of slot cutting, slot cleaning, bedding of loop cable and refilling with hot bitumen seal /cold sealant
15. Laying of PVC/GI pipe of various diameters in trenches (1' x 0.5')
16. Construction of controller plinth size 70cm x 50cm x 75cm (single brick construction with plastering on outside surface with 1:6 cement mortar, fixing of controller mounting frame with 4 Nos. of M 10 x 120mm bolts and painting two coats golden yellow paint with black stripes over a coat of cement primer etc. all complete
17. Supply & Installation of Name Board on Plinth: Black granite of Size – 12mm thickness & Dimensions – 600mm x 450mm engraved with the matter informed and painted with golden paint
18. Construction of foundation and basement for battery box (8 Nos. of battery) of size 60cm x 60cm x20cm with brick in 1:6 Cement mortar including plastering all around top for fixing battery box and painting two coats golden yellow paint with black stripes over a coat of cement primer etc. all complete
19. Construction of foundation and basement for battery box (2 Nos. of battery) of size 30cm x30cm x20cm with brick in C:M 1:4 including plastering all around top for fixing battery box and painting two coats golden yellow paint with black stripes over a coat of cement primer etc. all complete
20. Erection and painting with two coats of Golden yellow paint/Silver of single cantilever pole over foundation specification enclosed including the base and painting two coats golden yellow paint with black stripes on base all complete
21. Erection and painting with two coats of Golden yellow/Silver paint of single cantilever pole with 4/2 SPV Panels as per foundation specification enclosed including construction of the base and painting two coats of golden yellow paint with black stripes over a coat of cement primer on base all complete
22. Erection and painting with two coats of Golden yellow/Silver paint of 6 mtr. long pole as per foundation spec including construction of the base and painting two coats of golden yellow paint with black stripes over a coat of cement primer all complete
23. Erection and painting with two coats of Golden yellow/Silver paint of 7/9 mtr long pole with 4/2 SPV panels as per foundation spec including construction of the base and painting two coats of golden yellow paint with black stripes over a coat of cement primer all complete
24. Assembly of 1Mtr long Solar panel frame to standard pole/Cantilever Pole
25. Assembly of 3Mtr long Solar panel frame to standard pole
26. Fixing of Solar panel on Panel frame (per panel)
27. Fixing of controller on a) Pole
b) Plinth
28. Fixing of meter box/junction box
29. Fixing of Digital Count Down a) On Standard Pole/Cantilever Pole bottom portion Clock
b) On Cantilever Pole overhang
30. Fixing of Vehicle Sensing Camera a) On Standard Pole/Cantilever Pole bottom portion
b) On Cantilever Pole overhang
31. Assembly of signal heads 2/3/4/5 aspects -per set
32. Mounting of assembled signal heads 2/3/4/5 on a) Standard Pole/CL Pole Bottom
b) On Overhang of Cantilever Pole
33. Fixing of Pole Cap on Standard Pole /Cantilever pole
34. Fixing of Keltron logo / Name plate on pole
35. Construction of Circular foundation of 2 mtrs. dia at the bottom of the pole
36. Construction of circular barrier platform of dia 2 mtrs and height 1 mtr. with cement concrete 1:2:4 using 20mm metal and plastering all around the surface and top including 2 coat of golden yellow paint with black stripes over a coat of cement primer
ITEM No.: 3. ELECTRICAL WORK 37. Cable laying charges a) 2/3/4 core armoured/unarmoured
b) 6 core armoured/unarmoured
c) 12/14 core armoured/unarmoured
38. Laying of overhead cable with 8 SWG GI wire through pipes, poles and looping etc. including handling charges complete. Running length of bunch of cable tied to 8SWG GI wire properly tied at a height of not less than 7 mtrs. from road surface
39. Pole wiring charges a) On Standard Pole
b) On Cantilever Pole
40. Wiring of signal aspects and interconnecting the aspects on assemblies
41. Earthing as per specification (KSEB standard) a) Controller/Battery Box
b) Pole
42. Fixing of cable glands in controller and glanding of cables all inclusive
43. Termination and wiring of cables in controller
44. Wiring and inter connection of Solar panel on panel frame (per panel)
45. Termination of Solar panel cables in Battery Box (per panel assembly)
46. Wiring of battery box per battery including battery handling charges and CCU wiring
47. Wiring of Digital Countdown clock
48. Wiring of Vehicle Sensing Camera
ITEM No.: 4. ERECTION OF POLES ON FOUNDATION (Erection of Traffic Signal poles by bolting on RCC foundation, including construction of RCC foundation with materials, tools, curing) 49. Construction of RCC foundation as per specification enclosed with materials, tools, curing etc. excluding reinforcement structure and bolts
50. Construction of RCC foundation as per specification enclosed with materials, tools, curing etc. including reinforcement structure and bolts
51. Bolting of Standard pole on foundation
52. Bolting of Standard pole with Solar panel attachment on foundation
53. Bolting of Cantilever pole without Solar Panel attachment on foundation
54. Bolting of Cantilever pole with solar panel attachment on foundation
ITEM No.: 5. SOLAR BLINKER [1 to 20 Nos.] 55. Assembly and Erection of 6Mtr. standard pole with 1 Mtr. long panel frame with the following diameter: a) 2.5" (50mm)
56. Assembly and Erection of 9Mtr Cantilever pole with 1 Mtr long panel frame
57. Fixing of SPV panel to panel frame (per panel)
58. Wiring and termination of cable at solar panel (per panel)
59. Fixing of Signal assembly on blinker Pole (per signal head)
60. Wiring of Signal assembly (per signal head)
61. Fixing of controller box on blinker Pole
62. Fixing of Warning Board size 2mtr long and above
63. Construction of Plinth for Pole
64. Painting with two coats of golden yellow/Silver to solar frame, pole, plinth, clamps etc. all complete
ITEM No.: 6. SOLAR BLINKER [above 20 Nos.] 65. Assembly and Erection of 6Mtr. standard pole with 1 Mtr. long panel frame with the following diameter: a) 2.5" (50mm )
66. Assembly and Erection of 9Mtr. Cantilever pole with 1 Mtr. long panel frame
67. Fixing of SPV panel to panel frame (per panel)
68. Wiring and termination of cable at solar panel (per panel)
69. Fixing of Signal assembly on blinker Pole (per signal head)
70. Wiring of Signal assembly (per signal head)
71. Fixing of controller box on blinker Pole
72. Fixing of Warning Board size 2mtr long and above
73.Construction of Plinth for Pole
74. Painting with two coats of golden yellow/Silver to solar frame, pole, plinth, clamps etc. all complete
ITEM No: 7. SOLAR STREET LIGHT (1-20 Nos.) 75. Assembly and Erection of 3" dia 6Mtr. long standard pole with 1 Mtr long panel frame
76. Assembly and Erection of 4" dia standard pole more than 6 mtr long with 1 Mtr long panel frame
77. Assembly and Erection of 8 to 10 Mtr. long Octagonal pole with solar panel frame (single or double) on Foundation bolts including RCC foundation and bolting structure
78. Fixing of SPV panel on panel frame (per panel)
79. Wiring and termination of cable at solar panel (per panel)
80. Fixing of LED luminaire on bend and fixing on pole
81. Pole wiring charges including drawing of cable through pole
82. Wiring of LED Luminaire
83. Fixing of battery box on Pole
84. Construction of foundation and basement for battery box of size 30cm x30cm x20cm with brick in C:M 1:6 including plastering all around top, fixing of battery box and painting two coats golden yellow paint with black stripes over a coat of cement primer etc. all complete
85. Wiring of Battery box including CCU and battery
86. Construction of Plinth for Pole
87. Painting with two coats of paint of suitable colour on solar frame, pole, plinth, clamps etc. all complete
88. Fixing and wiring of conventional powered LED luminaire on existing KSEB pole excluding KSEB supervision charges (suitable clamp will be provided by KELTRON)
89. Fixing and wiring of conventional powered LED luminaire on existing KSEB pole including KSEB supervision charges (suitable clamp will be provided by KELTRON)
90. Transportation of Materials at site
ITEM No.: 8. SOLAR STREET LIGHT (above 20 Nos.) 91. Assembly and Erection of 3" dia 6 Mtr. long standard pole with 1 Mtr long panel frame
92. Assembly and Erection of 4" dia standard pole more than 6 mtr long with 1 Mtr. long panel frame
93. Assembly and Erection of 8 to 10 Mtr. long Octagonal pole with solar panel frame (single or double) on Foundation bolts including RCC foundation and bolting structure
94. Fixing of SPV panel on panel frame (per panel)
95. Wiring and termination of cable at solar panel (per panel)
96. Fixing of LED luminaire on pole
97. Pole wiring charges including drawing of cable through pole
98. Wiring of LED Luminaire
99. Fixing of battery box on Pole
100. Construction of foundation and basement for battery box of size 30cmx30cmx20cm with brick in C:M 1:6 including plastering all around top, fixing of battery box and painting two coats golden yellow paint with black stripes over a coat of cement primer etc. all complete
101. Wiring of Battery box including CCU and battery
102. Construction of Plinth for Pole
103. Painting with two coats of paint of suitable colour to solar frame, pole, plinth, clamps etc. all complete
104. Fixing and wiring of conventional powered LED luminaire on existing KSEB pole excluding KSEB supervision charges (suitable clamp will be provided by KELTRON)
105. Fixing and wiring of conventional powered LED luminaire on existing KSEB pole including KSEB supervision charges (suitable clamp will be provided by KELTRON)
ITEM No.: 9. MINI MAST LIGHT SYSTEMS (1-10 Nos.) 106. Assembly and Erection of 4" dia 6Mtr. long standard pole with mast assembly with: a) 3 Nos. of LED luminaires
b) 4 Nos. of LED luminaires
c) 6 Nos. of LED luminaires
107. Assembly and Erection of 4" dia 8Mtr. long standard pole with mast assembly with: a) 3 Nos. of LED luminaires
b) 4 Nos. of LED luminaires
c) 6 Nos. of LED luminaires
108. Assembly and Erection of 8 to 10 Mtr. long Octagonal pole on Foundation bolts including RCC foundation and bolting structure with mast assembly with: a) 3 Nos. of LED luminaires
b) 4 Nos. of LED luminaires
c) 6 Nos. of LED luminaires
109. Fixing of LED luminaire on mast arm
110. Pole wiring charges including drawing of cable through pole
111. Wiring of LED Luminaire
112. Wiring & Fixing of Junction Box on Pole
113. Construction of foundation and basement for standard pole of size 30cmx30cmx20cm with brick in C:M 1:6 including plastering all around top, painting two coats golden yellow paint with black stripes over a coat of cement primer etc. all complete
114. Painting with two coats of paint of suitable colour on standard pole, mast & clamps etc. all complete
115. Availing new KSEB Electric Connection at Pole Point excluding KSEB statutory payments (KSEB charges will be paid extra on producing the actual receipt from KSEB)
116. Earthling of Pole as per specification
ITEM No.: 10. MINI MAST LIGHT SYSTEMS (above 10 Nos.) 117. Assembly and Erection of 4" dia 6Mtr. long standard pole with mast assembly with: a) 3 Nos. of LED luminaires
b) 4 Nos. of LED luminaires
c) 6 Nos. of LED luminaires
118. Assembly and Erection of 4" dia 8Mtr. long standard pole with mast assembly with: a) 3 Nos. of LED luminaires
b) 4 Nos. of LED luminaires
c) 6 Nos. of LED luminaires
119. Assembly and Erection of 8 to 10Mtr. long Octagonal pole on Foundation bolts including RCC foundation and bolting structure with mast assembly with: a) 3 Nos. of LED luminaires
b) 4 Nos. of LED luminaires
c) 6 Nos. of LED luminaires
120. Fixing of LED luminaire on mast arm
121. Pole wiring charges including drawing of cable through pole
122. Wiring of LED Luminaire
123. Wiring & Fixing of Junction Box on Pole
124. Construction of foundation and basement for standard pole of size 30cmx30cmx20cm with brick in C:M 1:6 including plastering all around top, painting two coats golden yellow paint with black stripes over a coat of cement primer etc. all complete
125. Painting with two coats of paint of suitable colour on standard pole, mast & clamps etc. all complete
126. Availing new KSEB Electric Connection at Pole Point excluding KSEB statutory payments (KSEB charges will be paid extra on producing the actual receipt from KSEB)
127. Earthing of Pole as per specification
ITEM No.: 11. LED STREET LIGHT 128. Fixing and wiring of conventional powered LED luminaire on existing KSEB pole including KSEB supervision charges (suitable clamp will be provided by KELTRON)
129. Dismantling & Transportation of old Street Lights and subsequent Fixing & wiring of conventional powered LED luminaire on existing KSEB pole including KSEB charges
130. Transportation of Materials at site
ITEM No.: 12. ADDITIONAL WORK FOR REPAIR & MAINTENANCE OF TRAFFIC SIGNAL 131. Labour Charge (day time) / person
132. Labour Charge (night time) / person
133. Crane Charge
134. Transportation of Tools (Trivandrum)
135. Transportation of Tools & Labour (Outside Trivandrum)
136. Paint for Poles and Controller (Including brush and Turpentine etc.)
137. Material for fixing one Standard Pole (Including auto, loading and unloading etc.)
138. Material for fixing one Cantilever Pole
139. Material for fixing Controller / Battery box
140. Breaker Charge
NELLISSERIL GROUP
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .