Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹17.3 L
EMD Value
₹17,300
Closing Date
19 Oct 2026, 5:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Secretary, The Agricultural Produce Market Committee, Sanjeli
CONSTRUCTION OF (1) CONSTRUCTION OF NEW TOILET BLOCK AT APMC MAIN YARD SANJELI @ VILLAGE SANJELI TA:- SANJELI DIST:- DAHOD (2) CONSTRUCTION OF WEIGHBRIDGE AT APMC SANJELI MAIN YARD @ VILLAGE SANJELI TA:- SANJELI DIST:- DAHOD
354269
02 of 2026-27
Open
Civil Works
Works
Dahod
1 document required · 1 mandatory
₹900
Secretory, APMC, SANJELI
₹17,300
10 Oct 2026
10 Oct 2026
10 Oct 2026
19 Oct 2026
10 Oct 2026
BILL OF QUANTITIES (SCHEDULE-B)
Memorandum showing items of works to be carried out
Item No. Description of Item Quantity Unit Rates in Total Amount
Item No. Description of Item Quantity Unit Rates in Total Amount
1 Item No. 1 :- Excavation for foundation up to 1.5 M. depth 199.00 Cum 259.93
including sorting out & stacking of useful materials and
disposing of the excavated stuff up to 50 Meter lead. (B)
Dence or hard soil.
2 Item No. 2 :- Providing and Filling in foundation with 11.10 Cum 3207.71
ordinary Cement concrete M-100 mix and providing
necessary vertical pin headers including formwork, vibrating,
ramming and curing complete.
3 Item No.3 :- Providing and Casting insitu controlled Cement 34.05 Cum 4460.60
Concrete M-200 for R.C.C. Raft and cutt-off walls including
necessary shuttering laying , vibrating , ramming and curing
4 Item No.4 :- Providing & laying controlled cement concrete 8.60 Cum 6814.77
M - 250 RCC work with curing etc. complete including the
cost of form work but excluding the cost of reinforcement for
R.C.C. Work in column up to plinth level as directed by
engineer incharge.
5 Item No.5 :- Providing and casting in situ controlled cement 1.95 Cum 5207.42
concrete M-200 for R.C.C solid slab including centering
scaffolding curing and finishing complete.
6 Item No.6 :- Providing TMT Bar FE 500/500D 5101.00 Kg 77.29
reinforcement for R.C.C. work including bending, binding
and placing in position complete upto floor two level.
7 Item No.7 :- Filling in plinth with sand under Floors including 19.20 Cum 419.82
watering ramming , consolidation and dressing complete.
8 Item No.8 :- Providing and laying cement concrete 1 : 4 : 8 ( 12.46 Cum 2679.92
1 cement : 4 coarse sand : 8 machine cut stone aggregates
40mm nominal size) and curing complete excluding cost of
form work in :(a) foundation and plinth .
9 Item No. 9 :- Brick work using common burnt clay building 50.35 Cum 4342.24
bricks having crushing strength not less than 35 Kg./Sq.Cm
in foundation and plinth in cement mortar 1:5 ( 1 cement :
Fine sand) ( C ) Fly Ash Bricks
10 Item No. 10 :- Brickwork using common burnt clay building 25.40 Cum 4630.67
bricks having crushing strength not less than 35 kg./Sq.Cm.
in superstructure in Cement Mortar 1:6 (1- Cement : 6 -fine
sand) (B) Fly Ash Bricks
11 Item No. 11 :- Providing and laying cement concrete 1:3:6 6.85 Cum 3992.44
(1- Cement : 3- Coarse sand : 6- graded stone
aggregates 20 mm nominal size) and curing complete
including the cost of formwork in (A) Walls Caps / Coping.
Sanjeli APMC Wighbridge and Toilet Tender
Item No. Description of Item Quantity Unit Rates in Total Amount
Item No. Description of Item Quantity Unit Rates in Total Amount
12 Item No. 12 :- Providing and laying Vitrified tiles 8 to 10 mm 76.80 Sqm. 1195.02
thick, 24''x24'' in skrting risers of steps and dedo on 10mm
thick cement plaster 1:3 (1-cement:3-coarses and ) and
jointed with white cement slurry
13 Item No. 13 :- Providing and fixing 35 mm thick shutters for 24.15 Sqm. 4101.06
Doors ,windows and clear story windows including anodised
alluminium but thinge swith necessary screws. (A) Indian
Teak Wood (1) Fully Panelled
14 Item No. 14 :- Providing and laying broken chine mosaic 31.40 Sqm. 779.70
flooring for terrace using 12mm to 20 mm broken piecec of
glazed tiles to be laid over cement mortor 1:3 to plain or
slope and to be tempered to bring mortor creme out upto
surface using white cement including rounding off junctions
and extending them upto 15cm along the wall, clearing with
water and oxalic acid, as directed
15 Item No. 15 :- Providing 15 mm. thick cement plaster in 163.45 Sqm. 253.61
single coat on fair sides bricks / concrete walls for interior
plastering up to floor two level finished even and smooth in
cement mortar 1:3 (1 cement : 3 coarse sand) including
finishing with a floating coat of neat cement slurry.
16 Item No. 16 :- 20mm thick sand faced cement plaster on 214.90 Sqm. 353.98
walls upto height 10 metres above ground level consisting
of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand)
and 8mm thick finishing coat of C.M. 1:1 (1-cement : 1-
sand) etc. complete.
17 Item No. 17 :- Providing and laying ordinary cement 6.65 Cum 7665.60
concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone
aggregates 20 mm nominal size) and finishing smooth
with,curing etc. complete including the cost of formwork but
excluding the cost of reinforcement for R.C.C work in A)
Beam (ii) having cross sectional area more than 0.08 Sqm.
and upto 0.12 Sqm.
18 Item No. 18 :- Providing and laying dinary orcement 3.20 Cum 6888.15
concrete 1:2:4 ( 1 cement : 2 coarse sand: 4 graded stone
aggregate 20 mm nominal size ) and finishing smooth
with curring etc. Complete including the cost of form work
but excluding the cost of reinforcement for R.C.C work in
(iii) slab having more than 10 cms and up to 13 cms.
19 Item No. 19 :- Distempeing with dry distemper of approved 163.45 Sqm. 57.46
brand and manufacture (Two coats) of required shade on
wall surfaces to give an even shade, over and including a
priming coat of whiting after throughly brooming the surface
free from mortar dropping and other foreign matter.
20 Item No. 20 :- White washing with lime on Ceiling surface 163.45 Sqm. 13.52
(Two coats) to give an even shade including throughly
booming the surface to remove all dirt, dust, mortar drops
and loose scales of lime wash and other
21 Item No. 21 :- Finishing wall with water proofing cement 87.55 Sqm. 96.29
paint of on wall surfaces (Three coats) to give an approved
brand and manufacture and of required shape even shade
after thoroughly brushing the surface to remove all dirt and
remains of loose powered materials.
22 Item No. 22 :- Providing and laying Marble Slab Polished 7.75 Sqm. 3680.51
granite stone 20 to 25 mm thick Colour on a bed of 12 mm
thick cement mortar 1:3 (1-cement:3-coarse sand ) finishing
with flush pointingin white cement.
Sanjeli APMC Wighbridge and Toilet Tender
Item No. Description of Item Quantity Unit Rates in Total Amount
Item No. Description of Item Quantity Unit Rates in Total Amount
23 Item No. 23 :- Providing and fixing M,S. grills of required 324.80 Kgs 110.31
pattern to wooden frames of windows etc with M.S. flats at
required spacings and frame alround square or round bars
with round headed bolts and nuts or by screws ( A ) plain
24 Item No. 24 :- Providing and laying (two level or slopes ) 15.00 Rmt 225.47
and jointing with stiff mixture of cement mortar in proportion
1:1, Salt glazed stoneware pipes including testing of pipes
and joints complete. (A) 100 mm dia.
25 Item No. 25 :- Providing sock pit of 5.00 Cu.m. Volume 1.00 Each 3285.35
including excavating and filling brickbats with dry masonary
work at top for 45 cm. height including covering the top with
stone including providing vatas in C.M. 1:3 with finishing,
curing etc. complete as directed.
26 Item No. 26 :- Providing and fixing to wall ceiling and floor 15.00 Rmt 280.23
10.00 Kg./Cm.2 working pressure polythene pipes of the
following outside dia. low density, complete with special
flange compression type fittings, wall clips etc. including
making good the wall ceiling and floor. (F) 75 mm.
27 Item No. 27 :- Providing and fixing in position PVC covel 8.00 Each 393.04
vent to pipes (i) 75 mm. dia.
28 Item No. 28 :- Providing and fixing to wall ceiling and floor 30.00 Rmt 252.49
galvanized mild steel tubes ( Medium Grade ) of the
following nominal bore, tube fitting and clamps including
making good the wall ceiling and floor
( A ) 15 mm. dia.
29 Item No. 29 :- Providing and fixing to wall ceiling and floor 20.00 Rmt 401.95
galvanized mild steel tubes ( Medium Grade ) of the
following nominal bore, tube fitting and clamps including
making good the wall ceiling and floor.
( C ) 25 mm. dia.
30 Item No. 30 :- Providing and fixing gun metal check or non 3.00 Each 186.83
return full way wheel valve. (i) 15 mm. dia.
31 Item No. 31 :- Providing and fixing gun metal check or non 3.00 Each 420.63
return full way wheel valve. (C) 25 mm. dia.
32 Item No. 32 :- Providing and fixing screw down bib taps of 20.00 Each 205.83
following size.(i) 15 mm. dia.
33 Item No. 33 :- Providing and fixing chromium plated half 6.00 Each 263.77
turn flush cock of approved quality including fixing in pipe
line etc.complete. (ii) 25 mm. dia.
34 Item No. 34 :- Providing and fixing to wall ceiling and floor 10.00 Rmt 339.05
10.00 Kg./Cm.2 working pressure poluthene pipes of the
following outside dia. Low density, complete with special
flange compression type fittings, wall clips etc. including
making good the wall ceiling and floor.
35 Item No. 35 :- Constructing brick masonary chamber for 2.00 Each 2932.93
underground C.I Inspection chamber and bends with bricks
having crushing strength not less than 35 Kg. / Cm.2 in C.M.
1:5 C.I. cover with frame (Light duty ) 455mmx610mm
internal dimensions total weight of cover with frame to be
not less than 21 Kg.(Wt. of cover 16 Kg. ) and Wt, of frame
5 Kg. ) foundation concrete 1:5:10 inside plaster 15 mm.
thick with cement mortar 1:3 finished smooth with a floating
coat of neat cement on walls and bed concrete etc.
Sanjeli APMC Wighbridge and Toilet Tender
Item No. Description of Item Quantity Unit Rates in Total Amount
Item No. Description of Item Quantity Unit Rates in Total Amount
36 Item No. 36 :- Supplying & fixing PVC water tank such as 1000.00 Litter 10.10
Sintex including delievery at site, supply and fixing of inlet,
outlet, air vent overflow, drainage sleves of the specified
size, with necessary neo-prene gasket/packing/washers, GI
washer & check nuts etc. completed.
37 Item No. 37 :- Providing and fixing water closet squatting 7.00 Each 1541.31
Pan (Indian type W.C. Pan) size 580mm with providing and
fixing in cement mortar 1:3 (1 cement : 3 coarse sand) a pair
of white vitreouse china 250mm x 130 mm x 30mm footrest
to long pattern squtting pan water closet (A) vitreous china
(I) long pattern = white color
38 Item No. 38 :- Providing and fixing urinal of squatting plate 5.00 Each 1674.15
pattern white earthen ware 550 mm x 300mm. Size
approved quality including connection with trap and with
integral longitudinal flush pipe.
39 Item No.39 :- White washing with lime on wall surface (two 127.35 Sqm. 13.00
coats) to give an even shade including thoroughly brooming
the surface to removed all dirt, dust mortar drops and other
foreign matter.
40 Item No. 40 :- Dismentaling the existing struture including 54.60 Cum 952.51
removing and stacking the dismentalled materials as and
where directed (A) R.C.C. Work
Rupees Seventeen Lakh(s) Twenty Six Thousand Eight Hundred Forty Only
Sanjeli APMC Wighbridge and Toilet Tender
Item No. Description of Item Quantity Unit Rates in Total Amount
Item No. Description of Item Quantity Unit Rates in Total Amount
I / we, am / are willing to carry out the works at______ % Above / below percent (should be
written in figure and words) of the estimate rates mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender: Estimated amount put to tender:
Deduct………% below Add………% Above
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
Quantity, rates & wording of items are as per estimates and calculation in the schedule
" B " are arithmetically checked and found correct.
Signature of Contractor
Sanjeli APMC Wighbridge and Toilet Tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
APMC SANJELI . NOTICE Conditions.pdf
SBD Sanjeli APMC Wighbridge and Toilet Tender.pdf
SCH.B Sanjeli APMC Wighbridge and Toilet Tender.pdf
Tender Notice Sanjeli APMC Wighbridge and Toilet Tender.pdf
TENDER NOTICE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .