Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
7 Dec 2022, 10:00 amClosed
DGM CC AND PHS
ROOM NO.35 TECHNICAL BUILDING
Annual rate contract for Miscellaneous jobs in the Ball Mill section of ANP Plant at RCF, Trombay Unit.
2022_RCFL_724167_1
ET-CC/ANP/233/L/2223/1211
Open Tender
Miscellaneous Services
Lump-sum
365 days
RCF TROMBAY
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹20,000
Yes
28 Dec 2022
17 Nov 2022
7 Dec 2022
17 Nov 2022
7 Dec 2022
17 Nov 2022
Amount
Belt Conveyor BC-0 / BC- 1:Gear -Box replacement
Bucket Elevator BE-2:Gear -Box replacement
Screw - Top AF-2:Gear -Box replacement
Screw - Bottom AF-2:Gear -Box replacement
Screw-AF-1:Gear -Box replacement
Ball Mill:Gear -Box replacement
Disc Feeder:Gear -Box replacement
Ball mill:Pinion replacement
Ball mill:Liner Replacement
Mill Fan:Rotor replacement
Ball mill - Gear Box:Hi Jet Pump
Ball Mill - Liners:Hi Jet Pump
BC-0: Drive side Brg repl.
BC-1: Drive side Brg repl.
BE-2: Drive side Brg repl.
VF-1: Drive side Brg repl.
VF-2: Drive side Brg repl.
VF-3: Drive side Brg repl.
Mill Fan: Drive side Brg repl.
AF-2 Top: Drive side Brg repl.
AF-2 Bottom: Drive side Brg repl.
AF-1: Drive side Brg repl.
RAL2 Screw: Drive side Brg repl.
BC-0: NDE - Bearing Replacement
BC-1: NDE - Bearing Replacement
BE-2: NDE - Bearing Replacement
Mill Fan: NDE - Bearing Replacement
AF-2 Top: NDE - Bearing Replacement
AF-2 Bottom: NDE - Bearing Replacement
AF-1: NDE - Bearing Replacement
RAL2 Screw: NDE - Bearing Replacement
Product Bin: Diverter make free
Screw: Teflon Bush replacement
Blower and Disc Feeder: "V" belt replacement
Coupling and Bearing: Greasing: Greasing
Ball Mill: Alignment
Mill Fan: Alignment
Ball mill: MHC opening and box-up
RAL 2 Screw: Chain Replacement
Bucket Elevator: Chain Replacement
Rock Grinding Section: Flange opening and Box-up
Rock Grinding Section: Man-Hole cover opening and Box-up
Rock Grinding Section: Crack Welding - CS
Rock Grinding Section: Cutting and welding - CS
BC-0 and BC-1 Belt Conveyor - 500 mm belt width: Roller replacement
Bucket Elevator - BE1: Top sprocket Assembly Replacement
Bucket Elevator - BE2: Bottom sprocket Assembly Replacement
Bucket Elevator - BE3: Bucket Replacement
Pneumatic Pump: "O" Ring Replacement
Pneumatic Pump: Canvas Replacement
Pneumatic Pump: Top Gate Replacement
Pneumatic Pump: Bottom Gate replacement
Pneumatic Pump: Discharge rubber hose replacement - 6 "
Mepico Fabricators
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .