Loading…
Loading…
Tender Value
₹83.8 L
EMD Value
₹83,800
Closing Date
27 Aug 2026, 6:00 pmClosed
Executive Engineer Public Health Works Division GWSSB Godhra
Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as canal offtake structures, elevated service reservoirs (E.S.R), HGLR, sump, water treatment plant, chemical house, staff quarters, pump house, all bulk transmission and distribution pipelines, valves, pumping machinery & electrical equipment etc. for the PM3-B regional water supply scheme including supply of potable water to all the 67 villages/01 towns for 06 months period. Taluka: Kalol, District: Panchmahal based on Narmada Main Canal near Boru village Excluding supply of PAC, bleaching powder and chlorine gas
335852
3 of Year-2026-27
Open
Civil Works - Water Works
Works
Panchmahal
3 documents required · 3 mandatory
₹3,600
Executive Engineer, Public Health Works Division, GWSSB, Godhra, Panchmahal
₹83,800
17 Aug 2026
17 Aug 2026
17 Aug 2026
27 Aug 2026
17 Aug 2026
Name of Work: Operation & mai ntenance of Civi l Prod uci ng potab le water of desirable standards from Bor u
M ain Head Works of PM 3B Regional Water Supply Schem e by Proper Operation and M aintenance (07 Months or
completion of Augmentati on work whichever is earlier) i ncludi ng mai ntenance to all civil works, pipe- lin e
system network all consumab le, existi ng and additional Chlorination plants and i ncl. proper chlorinati on,
skilled and unski lled manp ower, material, T & P articles, vehicles, all type of valve chamber and water meter
for continuous and uni nterrupted water from Various S ub Head works. Proper operati on and of different
class, type and diameter pipes, pump houses, sumps, sluice valves, non return valve at all various head
works. Rep la cem ent spares all equipments and mai ntenance of civi l structures includi ng Supply of suffici ent
potable water to includ ed vi llages in various sub head works included i n the scheme with residual chlorine of
required ppm at bulk supp ly p oi nt i ncludi ng all types of break down works for civil works. Providi ng suffici ent
No. of qualified and experienced Skilled and unski lled labors and providi ng security at all various sub head
works sites, pipeline, u/g sumps, E.S.R, pump houses, compound wall etc.as per directives of the engi neer -
in – charge f or overall management of O & M Civil work of whole scheme based on PM 3B RW SS having
Villages for 24 hours. (Without pumping machinary)
Estimated Cost : Rs.
Executive Engineer
Gujarat Water Supply & Sew erage Board
Public Health Wor ks Div ision, Godhra
THIS PAGE IS LEFT INTENTIONALLY BLANK
SR. NO. PARTIC ULARS
THIS PAG E IS LEFT INT ENTIONALLY BLANK.
PRIC E SCHEDULE A
Schedule show ing approximate quantity of materials to be suppli ed to the contractor at the govt. stor e
for the w ork to be executed on contr act and the rate w hich they ar e to be charged.
Sr. Particular Quantity Issue Rate Uni t Place of Deliv ery
1 Chlorine Gas Free of Cost Departm ental store at
Tarkhanda or any other
2 PAC (10% Liquid) Free of Cost sto re in Panchmahal
3 Bleaching Powder Free of Cost where m aterial is
1. Materials not included in “Schedule – A” but required for the work shall be provided by the contractor at hi s
2. Any m aterials required for items other than labour charges items mentioned in “Schedule – B” and m aterials
not included in “Schedule – A” but available with dept. will be issued on reque st of the contractor a t
departmental issued rate or m arket rate whichever i s more.
3. The contractor shall provide his own arrangement for loading, unloading and transporting PAC solution and
Alum/PAC chlorine gas etc. materials issued by the dept. from store to site at his own cost. Cont ractor will
be respon sible for dam ages what soever during tran sfer.
4. The unused materials issued by the departm ent for this work shall be returned to the department in good
and acceptable condition by the contractors. Any such unused materials not returned by the contractor in
time or issued will be recovered at Double of (As per issue rate + 3% storage charge or Board RC + 3%
sto rage charges) whichever is m ore.
5. All m aterials such as Specials, Fittings, Spare s, etc. shall be brought by Agency / Contra ctor at site of
6. The m aterial which requires to be procured by contractor and sam e as available with the departm ent the
sam e can be issued to the contractor after prior approval from the com petent authority and charged for the
sam e will be at the current market rate or issue rate fixed by the department whichever is higher. The
contractor shall have to deposit total cost of m aterials issued or shall be recovered from the running account
7. The m aterials issued for the above wo rk shall be used in the above O&M work only. If any of materials
issued for this work and found used in other works shall be charged at the double rate.
8. As per the instructions of the competent authority and availabili ty of materials, if needed contractor have t o
transpo rt the same from the other store to HARE DA Scheme for which no ext ra carting, loading, unloading
9. The m aterials i ssued free of cost to the cont ractor is to be transported to the site of wo rk in good condition
by the contractor for which no extra payment will be made.
10. The m aterials to be brought/purchase by the contractor shall be got approval from the EIC before using in
Executiv e Engineer Signature of the contractor
P. H. Works Division
PRIC E SCHEDULE B
Name of Work: Operati on & mai ntenance of Civi l Produci ng potab le water of d esirable stand ards from Bor u
M ain Head Works of PM 3B Regional Water Supply Schem e by Proper Operation and M aintenance (07 Months or
completion of Augmentati on work whichever is earlier) i ncludi ng mai ntenance to all civil works, pipe- lin e
system network all consumab le, existi ng and additional Chlorination plants and i ncl. proper chlorinati on,
skilled and unski lled manp ower, material, T & P articles, vehicles, all type of valve chamber and water meter
for continuous and uni nterrupted water from Various S ub Head works. Proper operati on and of different
class, type and diameter pipes, pump houses, sumps, sluice valves, non return valve at all various head
works. Rep la cem ent spares all equipments and mai ntenance of civi l structures includi ng Supply of suffici ent
potable water to includ ed vi llages in various sub head works included i n the scheme with residual chlorine of
required ppm at bulk supp ly p oi nt i ncludi ng all types of break down works for civil works. Providi ng suffici ent
No. of qualified and experienced Skilled and unski lled labors and providi ng security at all various sub head
works sites, pipeline, u/g sumps, E.S.R, pump houses, compound wall etc.as per directives of the engi neer -
in – charge f or overall management of O & M Civil work of whole scheme based on PM 3B RW SS having
Villages for 24 hours. (Without pumping machinary)
Nam e of work :- Operating and m aintenance of PM3B Regional W ater Supply Scheme
TAL: Kalol DIST - PANCHMAHAL
Name of Work : Prev entive Maintenance and repairing of Civ il works, Civil structures,Pipelines etc. to proper supply of
potable water to 67 Villages under the PM3B RWSS Ta : Kalol Dist : Panchmahal
Duration of O&M : 07 months or com pletion of Agugm entation work whichev er is earlier
Description Qty Amount Unit Amount
Operation & m aintenance of Civ il Producing potable water of
desirable standards from Boru Main Head Works of PM3B
Regional Water Supply Schem e by Proper Operation and
Maintenance (09 Months) including m aintenance to all civ il
works, pipe-line system network all consumable, existing and
additional Chlorination plants and incl. proper chlorination,
skilled and unskilled m anpower, material, T & P articles,
vehicles, all type of v alve cham ber and water m eter f or
continuous and uninterrupted water f rom Various Sub Head
works. Proper operation and of diff erent class, type and
diameter pipes, pum p houses, sumps, sluice valv es, non
return v alv e at all various head works. Replacement spares all
equipm ents and maintenance of civ il structures including
Supply of sufficient potable water to included v illages in
various subhead works sincluded in the scheme with residual
chlorine of required ppm at bulk supply point including all types
of break down works f or civ il works. Providing suff icient No. of
qualified and experienced Skilled and unskilled labors etc.as
per directives of the engineer - in – charge f or overall
management of O & M Civ il work of whole schem e based on
NMC PM3B RWSS having 67 Villages for 24 hours. (Without
Pumping m achinary)
CIVIL DEPARTMENT TOTAL SAY RS.
1. Agency hav e to quote their rates in f igure and words in both ways.
2. (a) The bidder should strictly note that rate will be f ixed and f irm f or supply ing water supply to 56 v illages cov ered
under the Panam Regional W ater Supply Scheme.
(b) If villages ref use to take water supply same has to be added / omitted and Paym ent shall be m ade accordinly
villages served per day . (As per 2023 Population) on basis of unit rate method.
(c) At present GWSSB is maintaining this scheme by engaging daily wages labours through contract system . So
Pref erence may be given to these labours.
3. Presently water supplied to 53 villages.
4. v illages included in schem e ( Annexure attached ) It m ay be added/om itted ( Variable) f or supply of water as per
situation & demand.
5. Agency has to pay as per prev elant minimum wages per days to Labour as per labour commisonar Act.
NOTE : 1) The Paym ent of Items shown in Item of Schedule B shall be made according to the actual work done by the
agency during O & M period and m easurements recorded.
Total of Schedule B (Preventiv e Maintenance of Civ il Structures & Prov iding Portable water )----
I/ WE am /are willing to carry out the workJJJJJJJJJJ..abov eJJJJJJJJJJJJJJJ...
belowJJJJJJJJ% age (percentage should be written in f igure and words)the tender rate mentioned abov e
am ount of my / our tender work put as under.
1.Estim ated cost put to tender 1.Estimated cost put to tender
Rs 4459417.00JJJJJ. Rs 4459417.00JJJJJ.
2.Add Rs./-JJJJJJJJJJJJJJJJJJ. 2.Deduct Rs./-JJJJJJJJJJ.
3.Net Rs/-JJJJJJJJJJJJJJJJJJJJJ. 3.Net Rs/-JJJJJJJJJJJJJ
4.In words Rs/-JJJJJJJJJJJJJJJJ 4.In words Rs/-JJJJJJJJJJ
JJJJJJJJJJJJJJJJJJJJJJJJJJJ JJJJJJJJJJJJJJJ.
• Rates to be quoted exclusiv e of GST.
• O & M Bill pay able on m onthly basis.
• Water supply of target quantity of water to all villages on a daily basis. If due to breakdown, agency is not capable
of supply ing water then such quantity should be supplied the next day to cope up with the shortage. Such that the
water supplied on the next day will be 2 tim es the regular per day target.
• Contractor should quote rate in words & f igure both.
• The bidders should strictly note that rate will be f ixed and f irm. No escalation will be given during the m aintenanc e
• The work should be carried out as per the term s and conditions laid down in the tender specif ication.
• The cost of raw water, electricity will be borne by GWSSB.
• Contractor will Transport necessary stock of Chlorine gas at the location of chlorination plant. All other required
material f or O&M work shall be brought by the contractor at his own cost including loading, unloading and carting
and the same material shall get approv al f rom the Engineer-in-charge before use in the work.
• The cost is including all type of taxes (other than GST), octroi, freight, loading, unloading, carting labour charges
payment to labour including insurance, P.F. and all other liabilities f or the staff engaged f or the O&M work.
• All replaced m aterial (provided f rom the department’s store) shall be returned to department store by the contractor
at his own cost.
• Laboure Rate Shall be applicable as per norm s and should be revised every y ear as per labour rate.
Signature of Contractor D.E.E., P.H.S.S.Dn., E.E., P.H.W.Dn.,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.PM-3 B Model DTP Technical Bid.pdf
2. VOL 1B GCC PART-1 OK.pdf
2.PM-3 B Model DTP Price Bid.pdf
Pm3B DTP-F.pdf
PM3B final A1 size colour.pdf
SD EMD GR 25-26.pdf
PM-3B 6 month comprehensive F-R.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .