Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance | ₹1.0 Cr | L1 | Accepted-Finance ok |
| 2 | L2₹1.1 CrRejected-Finance | ₹1.1 Cr | L2 | Rejected-Finance ok |
| 3 | L3₹1.2 CrRejected-Finance | ₹1.2 Cr | L3 | Rejected-Finance ok |
| 4 | L4₹1.2 CrRejected-Finance | ₹1.2 Cr | L4 | Rejected-Finance ok |
| 5 | L5₹1.5 CrRejected-Finance | ₹1.5 Cr | L5 | Rejected-Finance ok |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
26 May 2026, 6:00 pmClosed
Executive Engineer Water Resources Div Jodhpur
Executive Engineer Water Resources Div Jodhpur Kishore baagh mandore Jodhpur
Construction of Anicut and Channel in the Catchment area of Subhadra Mata Hill at Village Rajor GP Luni District Jodhpur
2026_WRDAS_559294_1
WRD2627A0048
Open Tender
Civil Works
Percentage
365 days
Jodhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Engineer Water Resources Div Jodhpur
₹2.8 L
Yes
16 Jun 2026
15 May 2026
27 May 2026
15 May 2026
26 May 2026
15 May 2026
15 May 2026 - 26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. (a) thick | 1,02,000 | SQM | 2.5 | ₹2,55,000 |
| 2 | Dag belling( Over 10 cm to 15 cm deep) | 1,440 | RM | 1.61 | ₹2,318.4 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. soft /disintegrated rock | 659.01 | Cum | 161 | ₹1,06,100.61 |
| 4 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. With lead beyond 2750 m and up to 3250 m (for avg lead 3 km) | 487.97 | Cum | 181.25 | ₹88,444.56 |
| 5 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (a) With initial lead of 250 m | 8,028 | Cum | 128 | ₹10,27,584 |
| 6 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor required as per site condition to obtain dry density of. (i) at least 98% of Standard Proctor's density | 8,571.77 | Cum | 42 | ₹3,60,014.34 |
| 7 | Watering of earth including cost of carriage of water when source of water is up to 1 Km. | 8,028 | Cum | 12.6 | ₹1,01,152.8 |
| 8 | Watering of earth including cost of carriage of water when source of water is up to 3 Km. | 543.77 | Cum | 22.6 | ₹12,289.2 |
| 9 | providing andlaying in position of cecent concrete nominal mix (1:3:6) including leads ofall construction materials,curing,compaction and finishing with rendering in cement sand mortar 1:3 and making good the joints excluding the cost of centering,shuttering and reinforcement. wellgraded crusher broken stone aggregate of maximum size upto 40 mm | 206.18 | Cum | 4,770 | ₹9,83,478.6 |
| 10 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 MM | 59.39 | Cum | 5,400 | ₹3,20,706 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
NIBsubhdramata.pdf
Tender Documents • 1.88 MB
BOQ_995733.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].