| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹37.6 LAccepted-Finance | ₹37.6 L | L-1 | Accepted-Finance Accepted |
| 2 | L-2₹41.8 L+₹4.3 L (11.4%)Accepted-Finance | ₹41.8 L+₹4.3 L (11.4%) | L-2 | Accepted-Finance Accepted |
| 3 | L-3₹43.4 L+₹5.8 L (15.5%)Accepted-Finance | ₹43.4 L+₹5.8 L (15.5%) | L-3 | Accepted-Finance Accepted |
| 4 | L-4₹44.1 L+₹6.5 L (17.4%)Accepted-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹44.1 L+₹6.5 L (17.4%) | L-4 | Accepted-Finance Accepted |
| 5 | L-5₹44.4 L+₹6.8 L (18.2%)Accepted-Finance | ₹44.4 L+₹6.8 L (18.2%) | L-5 | Accepted-Finance Accepted |
Tender Value
₹72.3 L
EMD Value
₹1.4 L
Closing Date
20 Jul 2026, 3:00 pmClosed
Executive Engineer, PWD, SER-1, New Delhi
O/o Executive Engineer, PWD, SER-1, New Delhi-110065
A/R and M/O to various road under PWD division South East Road-1 during 2026-27. (SH -Providing manholes and bellmouths at various roads under South East Road 14).
2026_PWD_295291_1
57/EE/SER-1/PWD/2026-27
Open Tender
Civil Works
Percentage
30 days
Assistant Engineer, SER-14
As per NIT
11 documents required · 11 mandatory
₹0
₹1.4 L
31 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 129 | cum. | 260.3 | ₹33,578.7 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 23 | cum. | 7,294.7 | ₹1,67,778.1 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 91 | cum. | 9,045.75 | ₹8,23,163.25 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 7,280 | Kg. | 107.85 | ₹7,85,148 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand) | 90 | cum. | 7,132.25 | ₹6,41,902.5 |
| 6 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 23 | cum. | 2,434.25 | ₹55,987.75 |
| 7 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 128 | cum. | 3,551.25 | ₹4,54,560 |
| 8 | Making bell mouth opening/ entrance of size 100x50x50 cm for drainage pipe under footpath, including providing cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) for shape of bell mouth, including plastering providing and fixing precast R.C.C./ S.F.R.C. slab including plastering with cement mortar 1:3 (1 cement : 3 fine sand) of 6 mm thickness on exposed surface of the slab & bell mouth including centring, shuttering & neat cement punning inside the bell mouth etc. all complete. | 434 | Each | 3,050.4 | ₹13,23,873.6 |
| 9 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 434 | mtr. | 39.35 | ₹17,077.9 |
| 10 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 1,356 | sqm. | 131.75 | ₹1,78,653 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.35 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.94 MB
BOQ_392907.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .