| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.0 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED BEING LOWEST QUOTED | |
| 2 | L2₹27.3 L+₹91,482.70 (3.46%)Rejected-AOC | L2 | Rejected-AOC NOT ACCEPTED DUE TO HIGHER RATE QUOTED | |
| 3 | L3₹31.8 L+₹5.4 L (20.4%)Rejected-AOC A 3 13 SIMANDHAR ENCLAVE NEAR PAVAPURI BUS STOP GHATLODIYA AHMEDABAD GUJARAT 380061 | AHMADABAD | GUJARAT | 380061 | L3 | Rejected-AOC NOT ACCEPTED DUE TO HIGHER RATE QUOTED | |
| 4 | L4₹33.2 L+₹6.7 L (25.5%)Rejected-AOC 274 210 DAFNALA ROAD SHAHIBAUG AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | L4 | Rejected-AOC NOT ACCEPTED DUE TO HIGHER RATE QUOTED |
| Sl No | Description | Qty | Unit | ALBA AC AND REF SERVICES L4 | OM ELECTRICAL ENERGY L2 | JYOT ENTERPRIES L3 | PARTH CONSULTANCY L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches not exceeding 1.5m wide and not exceeding 1.5 m in depth for foundation of pole,laying of cables etc in Hard and dense soil and getting out complete all as specified and directed. | 460 | CUM | 252 ₹1,15,920 | 280 ₹1,28,800 | 220 ₹1,01,200 | 160 ₹73,600 Lowest |
| 2.00 | Excavating in trenches not exceeding 1.5m wide and exceeding 1.5 m but not exceeding 3.00m in depth for foundation of pole, laying of cables etc in hard/dense soil and getting out complete all as specified and directed. | 0.54 | CUM | 360 ₹194.4 | 280 ₹151.2 | 220 ₹118.8 Lowest | 225 ₹121.5 |
| 3.00 | Returning filling in including spreading, leveling, watering and well ramming in layer not exc 25 cm complete all as specified and directed. | 276 | CUM | 72 ₹19,872 | 100 ₹27,600 | 60 ₹16,560 | 35 ₹9,660 Lowest |
| 4.00 | Removing excavated material not exc 50 mtr and depositing where directed at a level not exc. 1.5 m above the starting point complete all as specified and directed. | 184 | CUM | 90 ₹16,560 | 100 ₹18,400 | 40 ₹7,360 Lowest | 50 ₹9,200 |
| 5.00 | M&L for providing dry river sand as in sand cushioning to UG cable including punning gently all as directed. Note : Depth after punning shall be measured and paid. | 135 | CUM | 1,170 ₹1,57,950 | 590 ₹79,650 Lowest | 800 ₹1,08,000 | 650 ₹87,750 |
| 6.00 | M&L for plain cement concrete 1:4:8 type D-2 using 40mm graded stone aggregate in foundtion of PCC poles/struts all as specified and directed. | 0.54 | CUM | 4,950 ₹2,673 | 5,000 ₹2,700 | 3,200 ₹1,728 Lowest | 6,800 ₹3,672 |
| 7.00 | M&L for plain cement concrete 1:3:6 type C-2 using 40mm graded stone aggregate in foundtion of pole/stay assembly etc including necessary form work, all as specified and directed. | 4.5 | CUM | 5,220 ₹23,490 | 5,000 ₹22,500 | 3,200 ₹14,400 Lowest | 5,500 ₹24,750 |
| 8.00 | M&L for plain cement concrete 1:2:4 type B-1 using 20mm graded stone aggregate for padestal/coping around poles, including necessary form work, finishing even and smooth without using extra cement, all as specified and directed. | 3.5 | CUM | 7,920 ₹27,720 | 5,000 ₹17,500 | 3,200 ₹11,200 Lowest | 6,000 ₹21,000 |
| 9.00 | Taking out sub class burnt bricks from the trenches and stacking at site serviceable /unserviceable bricks for reuse complete all as specified and directed. | 12,350 | EACH | 0.5 ₹6,175 Lowest | 2 ₹24,700 | 2 ₹24,700 | 2 ₹24,700 |
| 10.00 | Supply and laying sub class old 'B' burnt bricks laid as cable protection cover complete all as specified and directed. | 11,900 | EACH | 9.45 ₹1,12,455 | 8.1 ₹96,390 | 8 ₹95,200 | 3 ₹35,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
22 Apr 2026, 6:00 pmClosed
GE ARMY GANDHINAGAR
GE ARMY GANDHINAGAR PO BSF CAMPUS GANDHINAGAR 382045
REPAIR REPLACEMENT AND MAINT OF LT CABLE FEEDER PILLER BOEXS ACSR CONDUCTER POLES EARTHING AND OTHER ALLIED MISC WORK AT OTM ACCN AT MIL STN DHRANGADHRA
2026_MES_758845_1
GE(A)/GNR/TOKEN/16 of 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
MIL STN DHRANGADHRA
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE ARMY GANDHINAGAR
₹60,000
Yes
28 Jul 2026
1 Apr 2026
29 Apr 2026
1 Apr 2026
22 Apr 2026
15 Apr 2026
1 Apr 2026 - 13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavating in trenches not exceeding 1.5m wide and not exceeding 1.5 m in depth for foundation of pole,laying of cables etc in Hard and dense soil and getting out complete all as specified and directed. | - | CUM | - | - |
| - | Excavating in trenches not exceeding 1.5m wide and exceeding 1.5 m but not exceeding 3.00m in depth for foundation of pole, laying of cables etc in hard/dense soil and getting out complete all as specified and directed. | - | CUM | - | - |
| - | Returning filling in including spreading, leveling, watering and well ramming in layer not exc 25 cm complete all as specified and directed. | - | CUM | - | - |
| - | Removing excavated material not exc 50 mtr and depositing where directed at a level not exc. 1.5 m above the starting point complete all as specified and directed. | - | CUM | - | - |
| - | M&L for providing dry river sand as in sand cushioning to UG cable including punning gently all as directed. Note : Depth after punning shall be measured and paid. | - | CUM | - | - |
| - | M&L for plain cement concrete 1:4:8 type D-2 using 40mm graded stone aggregate in foundtion of PCC poles/struts all as specified and directed. | - | CUM | - | - |
| - | M&L for plain cement concrete 1:3:6 type C-2 using 40mm graded stone aggregate in foundtion of pole/stay assembly etc including necessary form work, all as specified and directed. | - | CUM | - | - |
| - | M&L for plain cement concrete 1:2:4 type B-1 using 20mm graded stone aggregate for padestal/coping around poles, including necessary form work, finishing even and smooth without using extra cement, all as specified and directed. | - | CUM | - | - |
| - | Taking out sub class burnt bricks from the trenches and stacking at site serviceable /unserviceable bricks for reuse complete all as specified and directed. | - | EACH | - | - |
| - | Supply and laying sub class old 'B' burnt bricks laid as cable protection cover complete all as specified and directed. | - | EACH | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_849974.xls
BOQ • 0.45 MB
TenderDocuments.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .