Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹8.3 L (7.07%)Admitted-Finance 21A DAKSHINI APARTMENT RUPCHAND MUKHERJEE LANE BHOWANIPORE KOLKATA WEST BENGAL 700025 | KOLKATA | WEST BENGAL | 700025 | ₹1.3 Cr+₹8.3 L (7.07%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹13.0 L (11.1%)Admitted-Finance NORTH STREET COOLING TOWERS P LTD C 14 MEERUT ROAD IND AREA SEC 22 GHAZIABAD UTTAR PRADESH 201003 | GHAZIABAD | UTTAR PRADESH | 201003 | ₹1.3 Cr+₹13.0 L (11.1%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹17.7 L (15.2%)Admitted-Finance | ₹1.3 Cr+₹17.7 L (15.2%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
| Sl No | Description | Qty | Unit | North Street Cooling Towers Pvt. Ltd. L3 | KOOLAQUA TOWERS PRIVATE LIMITED L2 | ENCON INDIA L1 | Paharpu Cooling Towers Limited L4 |
|---|---|---|---|---|---|---|---|
| 1.00Revamping of Wooden Cooling Tower-J Cell (Paharpur Model No. 69-4-668) | |||||||
| 1.10 | Part–I:
Supply of 100% structural components made from Pultruted FRP Profiles, PVC V Bar, GRP/SS 304 wire grid, PVC drift eliminator, HDG connectors, SS 304 screw shank nails, Rubber Washer, Shear plate, shear Rings, Splash box assembly, Splash Box Cover assembly, PVC Bench tie, nylon cable tie, HDG Nut, bolts and washers, PP louver hanger bars and Pin, FRP Fan Cylinder with SS 304 Hardware for Cylinder, FRP corrugated sheet for louvers and end wall casing, Torque Tube, H Beam and supports for One Cell of Cooling Tower | 1 | CELL | 98,50,000 ₹1,16,23,000 | 99,00,000 ₹1,16,82,000 | 84,60,000 ₹99,82,800 Lowest | 99,00,000 ₹1,16,82,000 |
| 1.20 | Part–II:
Labour and Supervision Charges for dismantling of existing components and erection of the new materials for Cooling Tower. | 1 | CELL | 11,50,000 ₹13,57,000 | 7,00,000 ₹8,26,000 Lowest | 14,40,000 ₹16,99,200 | 15,00,000 ₹17,70,000 |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
29 Aug 2023, 4:00 pmClosed
DGM - MAINTENANCE
MFL MANALI CHENNAI
REVAMPING OF WOODEN COOLING TOWER J CELL
2023_MFL_764397_1
ESER/MAINT/CT J-CELL/290823/023 DATED 31/07/2023
Open Tender
Miscellaneous Services
Works
60 days
MFL, MANALI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.6 L
Yes
6 Nov 2023
31 Jul 2023
30 Aug 2023
31 Jul 2023
29 Aug 2023
31 Jul 2023
Revamping of Wooden Cooling Tower-J Cell (Paharpur Model No. 69-4-668)
Part–I: Supply of 100% structural components made from Pultruted FRP Profiles, PVC V Bar, GRP/SS 304 wire grid, PVC drift eliminator, HDG connectors, SS 304 screw shank nails, Rubber Washer, Shear plate, shear Rings, Splash box assembly, Splash Box Cover assembly, PVC Bench tie, nylon cable tie, HDG Nut, bolts and washers, PP louver hanger bars and Pin, FRP Fan Cylinder with SS 304 Hardware for Cylinder, FRP corrugated sheet for louvers and end wall casing, Torque Tube, H Beam and supports for One Cell of Cooling Tower
Part–II: Labour and Supervision Charges for dismantling of existing components and erection of the new materials for Cooling Tower.
KOOLAQUA TOWERS PRIVATE LIMITED
North Street Cooling Towers Pvt. Ltd.
Paharpu Cooling Towers Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .