Tender Value
₹4.4 Cr
EMD Value
₹4.4 L
Closing Date
21 Oct 2026, 6:00 pm
The Chief Officer, Dahod Nagarpalika, Dahod
BID DOCUMENT FOR CONSTRUCTION WORK OF C.C. ROAD IN VARIOUS AREA AT DAHOD NAGARPALIKA UNDER 15TH FINANCE SCHEME -UN-TIED GRANT (SECOND INSTALLMENT) YEAR 2024-25.
350164
15TH FINANCE SCHEME -UN-TIED GRANT (SECOND INSTALLMENT) YEAR 2024-25.
Open
Civil Works - Roads
Works
Dahod
14 documents required · 14 mandatory
₹7,080
The Chief Officer, Dahod Municipality, Dahod
₹4.4 L
29 Sept 2026
29 Sept 2026
29 Sept 2026
21 Oct 2026
29 Sept 2026
SBD SECTION-7 BILL OF QUANTITIES-170
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in
figure and in words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
( In words ) _______________________________________________ percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of
Division or as directed.
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects
and hold good for work under.
Note : 3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
Signature of Contractor President Chief Officer
Dahod Nagarpalika Dahod Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-171
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT BHILWADA VISTAR
PHASE -1 , AT DAHOD.
Item Qty. Description Total Unit Amount
1 241.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 482.50 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 321.50 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete. 1066.12 Cmt.
4 321.50 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm
nominal size ) and curing complete excluding cost of
formwork in (A) foundation and plinth.
5 321.50 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1607.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-
SBD SECTION-7 BILL OF QUANTITIES-172
7 48.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 11.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-173
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT ASOPALAV SOCITY AT
Item Qty. Description Total Unit Amount
1 60.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 120.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 80.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete.
4 80.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm
nominal size ) and curing complete excluding cost of
formwork in (A) foundation and plinth.
5 80.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass concrete.
6 400.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas
as per requirement and labour charges on directed by
Engineer-in-charge .
SBD SECTION-7 BILL OF QUANTITIES-174
7 12.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 4.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-175
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT AARADHANA SOCIETY
Item Qty. Description Total Unit Amount
1 107.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 214.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 143.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete.
4 143.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm
nominal size ) and curing complete excluding cost of
formwork in (A) foundation and plinth.
5 143.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 713.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-
SBD SECTION-7 BILL OF QUANTITIES-176
7 21.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 8.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-177
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT BHILWADA VISTAR -
PHASE - 2 , AT DAHOD.
Item Qty. Description Total Unit Amount
1 201.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 402.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 268.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete.
4 268.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 268.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1338.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-178
7 40.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 12.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-179
DAHOD MUNICIPAL, DAHOD.
NAME OF WORK :- DEVELOPEMENT OF RCC RETAINING WALL ANMOL SOCITY GODHRA ROAD SMART CITY
GATE. AT DAHOD. (WOARD 5)
RCC RETAINING WALL
Sr. Qty. Description Total Unit Amount
1 176.00 Excavation for Foundation upto 1.5 m. Depth including sorting
Cmt. out and stacking of useful materials and disposing of excavated
stuff upto 50 Meter lead (A) (loose or soft soil)
2 229.00 Excavation for foundation for depth from 3.0 m to 5.0 m
Cmt. including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead.(A) Loose
3 35.50 Providing and filling rubbles including hand packing and filling
Cmt. interstices with quarry spalls behind abutments and between
returns as directed.
4 18.00 Providing and laying cement concrete (1:4:8) (1 Cement,
Cmt. Coarse sand, 8 Crushed stone agreegate 40 mm nominal) and
curing complete excluding cost of formwork in foundation and
5 Providing & laying controlled cement concrete M 250 and curing
complete excluding the cost of formwork and reinforcement of
reinforced concrete work in.
a 55.50 For R.C.C. Raft 3959.59 Cmt.
b 45.00 For RCC Wall 4511.61 Cmt.
6 13410.00 Providing TMT Bar FE 500D reinforcement for R.C.C. work
Kgs. including bending, binding and placing in position complete upto
floor two level.
SBD SECTION-7 BILL OF QUANTITIES-180
7 28.00 Providing formwork of ordinary timber planking so as to give a
Smt. rough finish including centering shuttering strutting and propping
etc. Height of propping and centering below supporting floor to
ceiling not exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (A)Foundations
Footings Bases of Columns etc. and Mass concrete.
For Raft 294.13 Smt.
8 186.50 Providing formwork of ordinary timber planking so as to give a
Smt. rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to
ceiling not exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (C) Vertical
surface such as walls (any thickness) partitions and the like
including attached buttresses & string course & the like.
9 251.00 Filling available excavated earth (excluding rock) in trenches
Cmt. plinth, sides of foundations etc. in layers not exceeding 20 cm in
depth consolidating each disposited layer by ramming and
10 28.00 Providing & laying weep hole in Aburtments, and returns by
Each using A.C. pipe of 100mm including laying in proper grede and
jointing the completed as per detailed specification.
11 138.00 20mm thick sand faced cement plaster on walls upto height
Smt. metres above ground level consisting of 12mm thick backing
coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing
coat of C.M. 1:1 (1-cement : 1-sand) etc. complete
12 138.00 Finishing wall with weather proof exterior emulsion paint on wall
Smt. surface (two coats) to give an required shape even shade after
thoroughly brushing the surface to remove all dirt, and remains
of loose powdered materials.etc complete
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll Rs.
Add :- 2% of Contingency Charges Rs.
SBD SECTION-7 BILL OF QUANTITIES-181
DAHOD MUNICIPALITY, DAHOD.
ESTIMATE FOR CONSTRUCTION WORK OF LOAD BEARING BRICK WALL FOR ANMOL SOCITY GODHRA ROAD SMART
CITY GATE. AT DAHOD.
LOADBERING BRICK WALL
TOTAL LENGTH- 12.00 M.
Item Qty. Description Total Per
1 10.00 Excavation for foundation upto 1.5 m depth including sorting out and
Cu.m stacking of useful materials and disposing off the excavated stuff upto
Meter lead.(A) Loose or soft soil
2 9.00 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting
Cu.m out and stacking of useful materials and disposing off the excavated stuff
upto 50 Meter lead.(A) Loose or soft soil
3 13.20 Filling available excavated earth (excluding rock) in trenches. plinth, sides of
Cu.m foundations etc. in layers not exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
4 1.80 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6-
Cu.m hand broken stone aggregates 40 mmnominal size) and curing complete
excluding cost of formwork in (A) Foundation and Plinth
5 4.00 Brick work using common burnt building bricks having crushing strngth not
Cu.m less than 35 Kg./cm2 in C.M. (1:6) (1 Cement, 6 fine sand) racking out joints
curring etc. complete directed by Engineer-in-charge.
6 3.60 Providing & laying weep hole in Aburtments, and returns by using A.C. pipe
Each. of 100mm including laying in proper grede and jointing the completed as
per detailed specification.
7 7.30 Brick work using common burnt building bricks having crushing strngth not
Cu.m less than 35 Kg./cm2 in super structure for Ground Floor in C.M. (1:6) (1
Cement, 6 fine sand) racking out joints curring etc. complete directed by
Engineer-in-charge.
SBD SECTION-7 BILL OF QUANTITIES-182
8 7.30 20mm thick sand faced cement plaster on walls upto height 10 metres
Sqm. above ground level consisting of 12mm thick backing coat of C.M. 1:3 (1-
cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1-cement : 1-
sand) etc. complete.
9 7.30 Distempering (Three Coat) with oil bound washable distemper of approved
Sqm. brand and manufacture and of required shade on wall surfaces to give and
even shade over and including a primer coat with alkali resistance primer of
approved brand after throughly brushing the surface to give and even shade
free from foreign matter and also including preparing the surface even and
smooth.. 13.00 Sqm.
10 7.30 Finishing wall with weather proof exterior emulsion paint on wall surface
Sqm. (two coats) to give an required shape even shade after thoroughly brushing
the surface to remove all dirt, and remains of loose powdered materials.etc
complete 122.14 Sqm.
Add 1 % Quality Control
Add 2 % Contengencies charges
SBD SECTION-7 BILL OF QUANTITIES-183
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD FROM KAILASH MILL ROAD TO
KRISHNA PARK SOCIETY. (WARD -1) , AT DAHOD.
Item Qty. Description Total Unit Amount
1 31.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 63.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 42.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 42.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 42.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 210.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-184
7 6.30 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 4.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-185
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD BEHIND JULELAL
SOCIETY,NEAR MADHUBEN'S HOUSE. (WARD -2) , AT DAHOD.
Item Qty. Description Total Unit Amount
1 43.90 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 87.80 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 58.50 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 58.50 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 58.50 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 292.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-186
7 8.78 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 4.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-187
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT BHILWADA VISTAR -
PHASE - 3 , AT DAHOD.
Item Qty. Description Total Unit Amount
1 293.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 586.50 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 391.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 391.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 391.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1954.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-188
7 59.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 13.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-189
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT ANMOL SOCITY GODHRA
ROAD SMART CITY GEAT. AT DAHOD. (WARD-5)
Item Qty. Description Total Unit Amount
1 46.50 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i) R.C.C.
work 1108.12 Cmt.
2 93.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the excavated
stuff and depositing on the road side slope as directed upto
3 62.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 62.00 Providing and laying cement concrete (1:3:6) (1 Cement, 3 Coarse
Cmt sand, 6 Hand broken Stone agreegate 40 mm nominal size ) and
curing complete excluding cost of formwork in (A) foundation and
5 62.00 Providing and laying controlled cement concrete M.250 and curing
Cmt complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concrete.
6 310.00 Labour charges for concreting with vacume dewatering Technique
Smt (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge .
SBD SECTION-7 BILL OF QUANTITIES-190
7 9.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 3.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-191
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C ROAD WORK IN THE PANKAJ
SOCIETY NI SAMAJ NI WADI SAME NI GALI (WARD-4),AT DAHOD.
Item Qty. Description Total Unit Amount
1 96.40 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 192.80 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 128.50 Providing and laying compacted 150 mm thick B.T.
Cmt Metalling (45 to 63 mm size) using Stone screening
mm of 0.16 Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone
Dust including spreading in uniform layer, watering and
consolidation by vibratory roller achived the desired
density, as per clause.404 of M.O.R.T. & H. specification
4 128.50 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm
nominal size ) and curing complete excluding cost of
formwork in (A) foundation and plinth.
5 128.50 Providing and laying controlled cement concrete M.250
Cmt and curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
6 642.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C"
channelas as per requirement and labour charges on
directed by Engineer-in-charge .
SBD SECTION-7 BILL OF QUANTITIES-192
7 19.30 Supplying promoulded bituminous joint filler. (I) 12mm
Cmt thick 553.79 Cmt
8 7.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-193
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD IN THE LAST LANE FROM
AMBIKANAGAR TO SUDAMAWALI. (WARD -1) , AT DAHOD.
Item Qty. Description Total Unit Amount
1 270.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 540.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 360.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete. 1200.45 Cmt.
4 360.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 360.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1800.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-194
7 54.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 15.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-195
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD FORM PANDYA FARM TO
KARTIKAY SOCIETY. (WARD -2) , AT DAHOD.
Item Qty. Description Total Unit Amount
1 99.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i) R.C.C.
work 1108.12 Cmt.
2 198.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the excavated
stuff and depositing on the road side slope as directed upto
3 132.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 132.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 132.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 660.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-196
7 19.80 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 6.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-197
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROADAND DRAINAGE WORK IN
RAMNAGAR GALI NO.2,NEAR AMBEDKAR BHAVAN. (WARD -4) , AT DAHOD.
Item Qty. Description Total Unit Amount
1 195.00 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i) R.C.C.
work 1108.12 Cmt.
2 390.00 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the excavated
stuff and depositing on the road side slope as directed upto
3 260.00 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 260.00 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 260.00 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1300.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-198
7 39.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 11.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-199
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT RAGHUNANDAN, 2. (WARD -9)
Item Qty. Description Total Unit Amount
1 194.70 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 389.40 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 260.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404
of M.O.R.T. & H. specification etc. complete.
4 259.60 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm
nominal size ) and curing complete excluding cost of
formwork in (A) foundation and plinth.
5 259.60 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1298.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-
SBD SECTION-7 BILL OF QUANTITIES-200
7 39.00 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 11.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-201
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT SUBHAI BAG. (WARD -5) , AT
DAHOD. (PHASE-1)
Item Qty. Description Total Unit Amount
1 245.40 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 490.70 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 327.50 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete. 1200.45 Cmt.
4 327.10 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 327.10 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 1635.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-202
7 39.40 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 10.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-203
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD NEAR NETAJI
BAZAR,KAMLIYAWAD. (WARD -9) , AT DAHOD.
Item Qty. Description Total Unit Amount
1 68.70 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i) R.C.C.
work 1108.12 Cmt.
2 137.30 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the excavated
stuff and depositing on the road side slope as directed upto
3 91.50 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
4 91.50 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 91.50 Providing and laying controlled cement concrete M.250 and curing
Cmt complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concrete.
6 457.50 Labour charges for concreting with vacume dewatering Technique
Smt (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge .
SBD SECTION-7 BILL OF QUANTITIES-204
7 13.80 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 5.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-205
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD IN NANU SINGLE FADIYA
BEHIND JULELAL SOCIETY. (WARD -2) , AT DAHOD.
Item Qty. Description Total Unit Amount
1 47.90 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work 1108.12 Cmt.
2 95.70 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
3 64.00 Providing and laying compacted 150 mm thick B.T. Metalling
Cmt (45 to 63 mm size) using Stone screening 13.2 mm of
Cmt./10 Smt. and 0.08 Cmt./10 Smt., Stone Dust including
spreading in uniform layer, watering and consolidation by
vibratory roller achived the desired density, as per clause.404 of
M.O.R.T. & H. specification etc. complete.
4 63.80 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 63.80 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 319.00 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-206
7 9.60 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 5.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-207
DAHOD MUNICIPALITY, DAHOD
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD FROM ANIL AGRAWAL TO
STATION ROAD IN THAKKAR FADIYA MAIN ROAD. (WARD -3) , AT DAHOD.
Item Qty. Description Total Unit Amount
1 337.20 Demolition including stacking of service able materilas and
Cmt. disposal of unserviceable materials with all lead and lift. (i) R.C.C.
work 1108.12 Cmt.
2 674.30 Box cutting the road surface to proper slope and camber
Cmt. formaking a base for road work including removing the excavated
stuff and depositing on the road side slope as directed upto
3 449.50 Providing and laying compacted 150 mm thick B.T. Metalling (45
Cmt to 63 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete. 1200.45 Cmt.
4 449.50 Providing and laying cement concrete (1:3:6) (1 Cement,
Cmt Coarse sand, 6 Hand broken Stone agreegate 40 mm nominal
size ) and curing complete excluding cost of formwork in (A)
foundation and plinth.
5 449.50 Providing and laying controlled cement concrete M.250 and
Cmt curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete. 4247.21 Cmt.
6 2247.50 Labour charges for concreting with vacume dewatering
Smt Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
SBD SECTION-7 BILL OF QUANTITIES-208
7 67.50 Supplying promoulded bituminous joint filler. (I) 12mm thick
8 8.00 Up Gradation of Chamber in Road Level.
Nos. 1332.19 Nos.
Add :- 18% GST Rs.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-209
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Notes.pdf
Other Important-1.pdf
Other Important-2.pdf
Other Important-3.pdf
Other Important-4.pdf
Other Important-5.pdf
Other Important-6.pdf
SBD.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .