| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | ₹6.3 L Quoted ₹6.9 L | L1 | Accepted-AOC admitted |
| 2 | L2₹7.0 LRejected-AOC | ₹7.0 L | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | Rejith B L1 | ARUN L2 |
|---|---|---|---|---|---|
| 1.00RoW/10131815/143329 - Ayilur Grama Panchayat Deposit Restoration Work 2024-25 | |||||
| 1.00 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 136.2 | cum | 49.78 ₹6,780.04 | 50.28 ₹6,848.14 |
| 1.00 | 3.19.1:Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction. | 136.2 | cum | 68.35 ₹9,309.27 | 69.03 ₹9,401.89 |
| 1.00 | OD42385/2025-2026:Supply and filling with granular material in Pipeline trenches to achieve adequate bearing strength, in the line and level, compacted with a plate vibrator etc | 68.1 | cum | 3,717.45 ₹2,53,158.35 | 3,751.25 ₹2,55,460.13 |
| 1.00 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method | 34.05 | cum | 3,954.19 ₹1,34,640.17 | 3,990.14 ₹1,35,864.27 |
| 1.00 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 34.05 | cum | 4,057.52 ₹1,38,158.56 | 4,094.07 ₹1,39,403.08 |
| 1.01 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 1.2 | cum | 2,778.42 ₹3,334.1 | 2,804.88 ₹3,365.86 |
| 1.01 | 55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 1.2 | cum | 10,272.48 ₹12,326.98 | 10,366.72 ₹12,440.06 |
| 1.01 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 5.13 | cum | 2,865.77 ₹14,701.4 | 2,891.35 ₹14,832.63 |
| 1.01 | 55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 5.13 | cum | 3,349.46 ₹17,182.73 | 3,380.19 ₹17,340.37 |
Tender Value
₹6.3 L
EMD Value
₹15,721
Closing Date
24 Feb 2026, 5:00 pmClosed
Assistant executive Engineer
Assistant executive engineer PWD roads sub division Chittur
DEPOSIT-Deposit work - Restoration of KWA pipe laying works on Karimpara-Gomathi Road (Km 3/450-5/740), Ayloor Grama Panchayat(ROW/10142090/153949)-General- General Civil Work
2026_PWD_836198_1
PWD/RB/TR/2199/2025_5_1_1/1
Open Tender
Civil Works - Roads
90 days
Nenmara
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,390
Yes
₹15,721
Yes
30 Jun 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RoW/10131815/143329 - Ayilur Grama Panchayat Deposit Restoration Work 2024-25 | |||||
| 1.001 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 1 | cum | - | - |
| 1.002 | 3.19.1:Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction. | 1 | cum | - | - |
| 1.003 | OD42385/2025-2026:Supply and filling with granular material in Pipeline trenches to achieve adequate bearing strength, in the line and level, compacted with a plate vibrator etc | 1 | cum | - | - |
| 1.004 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method | 1 | cum | - | - |
| 1.005 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 1 | cum | - | - |
| 1.006 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 1 | cum | - | - |
| 1.007 | 55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 1 | cum | - | - |
| 1.008 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 1 | cum | - | - |
| 1.009 | 55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407439.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1407439.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid