| 1 | L1₹92.2 LAccepted-AOC BYE PASS ROAD JEYPORE KORAPUT | KORAPUT | ODISHA | 763001 | L1 | Accepted-AOC L1, Awarded value excluding GST | |
| 2 | L2₹1.1 Cr+₹21.4 L (23.2%)Rejected-Finance AT PO NAKEIPASI DANARA TALCHER ANGUL PIN 759103 | ANUGUL | ODISHA | 759103 | L2 | Rejected-Finance Quoted amount excluding GST | |
| 3 | L3₹1.3 Cr+₹38.9 L (42.2%)Rejected-Finance BARAMYNDA BHUBANESWAR | BHADRAK | ODISHA | 755007 | L3 | Rejected-Finance Quoted amount excluding GST |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
17 Mar 2023, 5:00 pmClosed
General Manager (M), E and M
Office of the G.M (Mech.), E and M,Central Workshop Rasulgargh, BBSR-10
Erection, commissiong, testing and paintaing of 06 sets of barrage bay and 02 sets of under sluice vertical gates with 2nd stage embedded parts, 14T hoist and its supporting structure and 2nd stage concreting of Saptamatruka Barrage Project
2023_OCCL_86644_1
E-Procurement Notice No59/OCCL/2022-23 (on-line)
Open Tender
Mechanical Works
Item Rate
150 days
Jajpur Town
Please refer tender documents
3 documents required · 3 mandatory
₹11,800
₹1.3 L
Office of G.M (Mech.), E and M, Rasulgargh, BBSR
2 May 2023
3 Mar 2023
18 Mar 2023
3 Mar 2023
17 Mar 2023
3 Mar 2023
3 Mar 2023 - 9 Mar 2023
10 Mar 2023
Amount
BARRAGE BAY GATES
Erection of 1 st stage & 2nd Stage Embedded Parts for 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm
Erection, Commissioning, Testing of 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm
Erection, Commissioning, Testing of 06(six) sets of 14 T rope drum hoist for 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm
Erection, Commissioning, Testing of Trestles & hoist supporting Structures for 06(six) sets of 14 T rope drum hoist
2nd stage concreting of embedded parts of 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm including hoist supporting structures & trestles by M25 grade concrete using 20mm and down grade agregates.
Painting of 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of 06(six) sets of 14 T rope drum Hoists for 06(six) sets Barrage Bay Gates of size 8000mm x 2800mm after blast cleaning process performed with as per requirements & class 'B' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint confirming to IS 2932 : 1974 to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of Hoist supporting structure & Trestles for 06(six) sets of 14 T rope drum Hoists for 06(six) sets Barrage Bay Gates of size 8000mm x 2800mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
UNDER SLUCE GATE
Erection of 1 st stage & 2nd Stage Embedded Parts for 02(two) sets of Under Sluice Gates of size 8000mm x 3300mm
Erection, Commissioning, Testing of 02(two) sets of Under Sluice Gates of size 8000mm x 3300mm
Erection, Commissioning, Testing of 02(two) sets of 14 T rope drum hoist for 02(two) sets of Under Sluice Gates of size 8000mm x 3300mm
Erection, Commissioning, Testing of Trestles & hoist supporting Structures for 02(two) sets of 14 T rope drum hoist
2nd stage concreting of embedded parts of 02(two) sets of Under Sluice Gates of size 8000mm x 3300mm including hoist supporting structures & trestles by M25 grade concrete using 20mm and down grade agregates.
Painting 02(two) sets of Under Sluice Gates of size 8000mm x 3300mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of 02(two) sets of 14 T rope drum Hoists for 02(two) sets Under Sluice Gates of size 8000mm x 3300mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of Hoist supporting structure & Trestles for 02(two) sets of 14 T rope drum Hoists for 02(two) sets of Under Sluice Gates of size 8000mm x 3300mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting..
STOPLOGS & LATCH ARRANGEMENTS
Erection of 1 st stage & 2nd Stage Embedded Parts for 08(eight) Nos. of stoplog grooves of size 8000mm x 1150mm for Barrage Bay & Under Sluice
Erection of 03(three) sets of stoplog leaf segments of size 8000mm x 1150mm for Barrage Bay & Under Sluice
Erection of latch arrangements for 06(six) Nos. of Barrage Bay & 02(two) Nos. of Under Sluice Bay
2nd stage concreting of embedded parts for 08(eight) Nos. of stoplog grooves of size 8000mm x 1150mm for Barrage Bay & Under Sluice by M25 grade concrete using 20mm and down grade agregates.
Painting 03(three) sets of Stoplog segments of size 8000mm x 1150mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc rich on dry film) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 02 coats of solventless coal tar epoxy paints. These should be applied at an interval of 24 hours. Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Painting of 08(eight) sets of latch arrangements for 08(eight) Nos. of bay after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
LIFTING BEAM, MONORAIL SUPPORTING STRUCTURE AND MONORAIL WALKWAY
Erection of 01(one) set of Lifting Beam for 03 (three) Nos. of stoplog leaf segments of size 8000mm x 1150mm for Barrage Bay & Under Sluice
Painting of 01(one) set of Lifting Beam after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Erection of 10(ten) set of Monorail supporting structures for 08 (eight) Nos. of Bay
Painting of 10(ten) set of Monorail supporting structures after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns.The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
Erection of 08(eight) set of Monorail walkway for 08 (eight) Nos. of Bay
Painting of 08(eight) set of Monorail walkway after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of sand blasting. Fnishing coat should consist of 01 coat of alkyed based micaceous iron oxide paint at dry film thickness of 65 ± 5 followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat of synthetic enamel paint. Total dry film thickness of all coats including primer coat should not be less than 175 microns. The rate should include compressor, paints, thinner, painting equiments, labour, other machinery, scaffolding etc. required for painting.
2nd stage concreting of Monorail supporting structures & Monorail walkway for Barrage Bay & Under Sluice by M25 grade concrete using 20mm and down grade agregates.
DILLIP KUMAR DAS
Trinath Engineers
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .