Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.2 LAccepted-AOC | 1 | Accepted-AOC Agreement executed by him | |
| 2 | 2₹11.0 L+₹1.7 L (18.8%)Rejected-AOC 19 195 A 1 ATC BUILDING MOOLEPADAM NAGAR ROAD HMT JN KALAMASSERY P O KOCHI 683104 | KOCHI | ERNAKULAM | KERALA | 683104 | 2 | Rejected-AOC second lowest | |
| 3 | 3₹14.6 L+₹5.4 L (58.2%)Rejected-Finance | 3 | Rejected-Finance third lowest |
Tender Value
₹8.5 L
EMD Value
₹21,200
Closing Date
28 Oct 2020, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
SDP- Sabarimala Operation and maintenance of Sewage treatment plant for temple opening days from 12th November 2020 to 19th January 2021 and engaging labours for cleaning the block of drainage lines
2020_TDB_393707_1
SDP/EE/ET-101/20-21
Open Tender
Civil Works - Others
Item Rate
70 days
sabarimala
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,018
online
₹21,200
7 Jan 2022
22 Oct 2020
30 Oct 2020
22 Oct 2020
28 Oct 2020
22 Oct 2020
Amount
Appendix I:- Operation of STP for 66 days Technicians (Chemist) Technicians( Electrical) 2 technicians per day
Operators 66 days 6 operator per day
Appendix II:-Supply of TCA Granules for Chlorination(Qunatity as per actual consumption at site)
Engaging labours for cleaning the block of drainage lines and policing the manholes in sewer network 66 days 6 labours per day
GREEN METHOD ENGINEERING PVT. LTD
sureshkumar
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .