Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-Finance NOT AVAILABLE | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.9 L+₹6,600 (3.62%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹2.0 L+₹13,300 (7.30%)Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 3 | Accepted-Finance Found Eligible |
Tender Value
Refer Docs
Closing Date
5 Jun 2023, 2:00 pmClosed
Executive Engineer, MID Akhnoor Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Repair of 250 KVA transformers LIS Argi Balijaralan and repair of 150 HP ATS starter No 2and3 and complete rewinding of 150 HP induction motor at LIS Thandapani.
2023_IFC_213779_1
MID/AN/15
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
15 days
Rajouri
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer, MID Akhnoor Nowshera
Exempted
Office of Executive Engineer, MID Akhnoor Nowshera
21 Jun 2023
27 May 2023
6 Jun 2023
27 May 2023
5 Jun 2023
30 May 2023
29 May 2023
Repair of 250 KVA Transformer of LIS Argi by way of disconnecting all electric connections and then lifting the top cover with the help of tripod stand and chain pulley after unfastening the nuts and bolts of the cover. Disassembling the transformer and darning old T oil out of the tank, providing and fitting 03 No HV bush rods and 04 Nos LV bush roads. Topping of transformer with 60 ltrs. oil. Assembling the transformer by replacing the top cover and fastening of nuts and bolts and using of oil packing sheet were necessary. Connectioning of LT and HT connections and testing on full load complete job including cost of materials tools and tackles, skilled and semi skilled labours.
Recapitalization 150HP ATS Starter by way of replacement worn out nuts, bolts and washers, becolite strips, fingers, tawiz, moving and fixed contests. Replacement shunt and tripping coils, topping up with defect quantity of T oil, connection power supply, testing and commissioning on full load. Job includes cost of material, labour and other tools and tackles at the site of LIS Thandapani
Complete rewinding of 150 HP induction motor unit No 2 installed at LIS Thandapani. The job involves disconnecting all electrical connection, decupling motor from pump, removing from the base plate. Dismantling the motor, extraction of the restore and bearing. Removing old/burned winding and rewinding with new copper wire. Cleaning of dust/carbon etc from stator. Repairing the end covers at driving and non driving end of the motor. Providing and fitting of 02 No bearing (DE+NDE) providing and fitting of cooling fan of the motor as per size, assembling the motor at site and installation at LIS Thandapani, leveling of motor over the base frame by providing / fitting nuts, bolts, washer etc, making of electric connections, alignment and commissioning of the pump unit. Job includes cost of all materials transportation, charges head load and labour charges for skilled/ semi skilled labour, hire charges for tools and tackles at LIS Thandapani
BEE AAR ENTERPRISES
NATIONAL ELECTRO-MECH COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .