| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | ₹3.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.4 LRejected-AOC | ₹3.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹3.4 LRejected-Finance | ₹3.4 L | L3 | Rejected-Finance L3 |
| 4 | L4₹3.4 LRejected-Finance | ₹3.4 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | BABU M JOSEPH L2 | RAJESH A L3 | M CHANDRAN L1 | TEENA BABU L4 |
|---|---|---|---|---|---|---|---|
| 1.00Bavakkapally Mundathod Road Retaring | |||||||
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 105 | sqm | 11 ₹1,155 | 15.06 ₹1,581.30 | 14.46 ₹1,518.30 | 11 ₹1,155 |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 10.5 | cum | 2,000 ₹21,000 | 2,338.05 ₹24,549.53 | 2,244.53 ₹23,567.57 | 2,050 ₹21,525 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 15.75 | cum | 3,400 ₹53,550 | 3,531.94 ₹55,628.06 | 3,390.66 ₹53,402.90 | 3,410 ₹53,707.50 |
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65) | 74.98 | sqm | 380 ₹28,492.40 | 388.57 ₹29,134.98 | 373.03 ₹27,969.79 | 380 ₹28,492.40 |
| 1.00 | 5.1.1a:Prime Coat :- Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 105 | sqm | 80 ₹8,400 | 75.94 ₹7,973.70 | 72.9 ₹7,654.50 | 82 ₹8,610 |
| 1.01 | 5.2.3a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 105 | sqm | 16 ₹1,680 | 16.44 ₹1,726.20 | 15.78 ₹1,656.90 | 16 ₹1,680 |
| 1.01 | 5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 615 | sqm | 14 ₹8,610 | 13.77 ₹8,468.55 | 13.22 ₹8,130.30 | 15 ₹9,225 |
| 1.01 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65) | 720 | sqm | 287 ₹2.1 L | 278.96 ₹2.0 L | 267.8 ₹1.9 L | 289 ₹2.1 L |
| 1.01 | 3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 14.4 | cum | 400 ₹5,760 | 614.4 ₹8,847.36 | 589.82 ₹8,493.41 | 450 ₹6,480 |
Tender Value
₹3.4 L
EMD Value
₹8,469
Closing Date
22 Sept 2025, 6:00 pmClosed
AE
AE,LID AND EW KANHANGAD MUNICIPALITY
Annual Plan-KMC PRO NO-16-26-Bavakkapally Mundathod Road Retaring
2025_LSGD_795722_12
03/2025/TN/AE/LIDEW/KMC
Open Tender
Civil Works - Roads
180 days
KANHANGAD
Please refer Tender documents.
9 documents required · 9 mandatory
₹750
₹8,469
3 Mar 2026
15 Sept 2025
23 Sept 2025
15 Sept 2025
22 Sept 2025
15 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1318874.pdf
boq_comp_chart.xlsx