12 Mar 2026, 6:00 pmClosed
Office of Executive Engineer
Work of UGPL to empty the tank located near survey no. 424/P of village Malod at Ch.7810 m of Botad Branch Canal. (2nd attempt)
278972
32/2025-26
Open
Miscellaneous Works
Works
Botad
6 documents required · 6 mandatory
₹2,832
Yes
The Executive Engineer, S.B.C. Division No. 3/1, 103, First Floor, Raghuvanshi Complex, Paliyad Road, Botad.
₹52,000
Yes
20 Feb 2026
20 Feb 2026
20 Feb 2026
12 Mar 2026
20 Feb 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Canal Work, Road and Bridge works. For building works
specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor
of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
SARDAR SAROVAR NARMADA NIGAM LIMITED
Saurashtra Branch Canal Division NO.3/1, Botad
SAURASHTRA BRANCH CANAL SUB DIVISION NO.-3/2-A, SURENDRANAGAR
Name of Work:- Work of UGPL to empty the tank located near survey no. 424/P of village
Malod at ch. 7810 m of Botad Branch Canal.
Sr.No Item Description Unit
Quantity Rate Amount
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soil, soft & hard
murrum etc. including depositing the excavated
stuff in uniform layers in banks or as and where
directed etc. complete for lead upto 1 km and all
lift. (By Machinary) (a) Above water table
Excavation for foundation in soft rock including
depositing the excavated stuff as and where
directed etc. complete for lead upto 1 km and all Cum 1988.00 123.00
lift. and all lift. (By Machinary) (a) Above water
Back filling the foundation trenches around the
structures etc with selected excavated stuff
including watering, ramming, compacting etc.
Providing & laying plain or reinforced cement
concrete of various grade with cement, sand, and
coarse aggregates including centering, shuttering,
batching, mixing, transporting, placing, vibrating,
smooth finishing, curing etc. complete.
(B)Placement site: - Raft, Bottom slab of barrel,
bottom slab of sump, approach slab and chute
floor slab, etc.(i) M 15 grade. Cement level =300
Kg. (MACHINERY BASED) (INCLUDING
Providing & laying plain or reinforced cement
concrete of various grade with cement, sand, and
coarse aggregates including centering, shuttering,
batching, mixing, transporting, placing, vibrating,
smooth finishing, curing etc. complete.
(B)Placement site: - Raft, Bottom slab of barrel,
bottom slab of sump, approach slab and chute
floor slab, etc.(ii) M 20 grade. Cement level =330
Kg. (MACHINERY BASED) (INCLUDING
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP Malod ch.7810.pdf
BOQ Ch.7810.pdf
M0 02.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .