Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹2.3 LAccepted-AOC HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | ₹2.3 L Quoted ₹2.4 L | H3 | Accepted-AOC Lowest One |
| 2 | H1₹2.7 LRejected-AOC | ₹2.7 L | H1 | Rejected-AOC Not Lowest One |
| 3 | H2₹2.5 LRejected-AOC | ₹2.5 L | H2 | Rejected-AOC Not Lowest One |
| Sl No | Description | Qty | Unit | Mahesh Kumar Gupta H1 | Yogesh Chauhan H2 | Satish Kumar H3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in all kinds of soil such as pick work , jumper work blasting work in soft or hard rook of by cum chiselling soft/ hard rock where blasting is prchibited in all leads and lifts including trimming and dewatering where ever required dressing of sides and bed stacking the excavated soil clear from the edge of excavation and then returning the excavated soil after completion of work in 15cm layers when required into plinths, side of foundation etc. Consolidating each deposited layers by remming and watering and then disposing of all surplus excavated soil complete in all respect as per direction and to the entire satisfaction of the Engineer-in- charge in all leads and liifts. | 7.2 | Cum | 380 ₹2,736 | 370 ₹2,664 | 350 ₹2,520 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1 cement:4 sand: 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the costof form work in foundation and plinth. | 3.2 | Cum | 10,200 ₹32,640 | 10,000 ₹32,000 | 9,900 ₹31,680 |
| 3.00Providing form work with steel plate 3.15 mm thick welded with angle iron 30x30x5 mm so as give a fair fininsh including centering shutering propping etc. height of peropping and centering below supporting floor to ceoling not exceeding 4 meters and. | ||||||
| 3.01 | i) Vertical surface such as walls (any thickness) partitions and the like including attached pillasters butteresses plinth and string course and the like. | 61.2 | Sqmt | 480 ₹29,376 | 450 ₹27,540 | 430 ₹26,316 |
| 4.00Providing and laying cement concerete 1:2:4 (1 Cement:2 sand: 4 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work and reinforcement in:- | ||||||
| 4.01 | In foundation ftooning and base of coloumn etc. | 11.48 | Cum | 10,900 ₹1.3 L | 10,800 ₹1.2 L | 10,600 ₹1.2 L |
| 5.00 | Providing tor steel reinforcement for RCC work including bending binding and placing in position complete up to floor two level. | 516.38 | Kg | 150 ₹77,457 | 130 ₹67,129.40 | 110 ₹56,801.80 |
Tender Value
Refer Docs
EMD Value
₹4,975
Closing Date
18 Oct 2025, 5:00 pmClosed
Executive Engineer JS Division Sarkaghat
Executive Engineer JS Division Sarkaghat
C O Anchor Block Thrust Block for gravity main 200 mm dia at various RD s
2025_HPIPH_117308_1
5409-60 dt. 09.10.2025
Open Tender
Civil Works
60 days
Sarkaghat
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer JS Division Sarkaghat
₹4,975
25 Apr 2026
9 Oct 2025
21 Oct 2025
9 Oct 2025
18 Oct 2025
9 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
form6.pdf
Tender Documents • 0.54 MB
form8.pdf
Tender Documents • 1.52 MB
conditions.pdf
Tender Documents • 0.29 MB
BOQ_171464.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid