Tender Value
₹9.2 Cr
EMD Value
₹9.8 L
Closing Date
16 Apr 2026, 6:00 pmClosed
Additional City Engineer
Supply, Installation, Testing and Commissioning of CCMS based Smart Street Light Feeder Pillar Panels for Replacement of Existing Street Light Feeder Pillars in Various Zones of Surat Municipal Corporation.
293322
ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Open
Supply,erection and Commissioning
Surat
3 documents required · 3 mandatory
₹14,160
Commissioner, Surat Municipal Corporation
₹9.8 L
2 Apr 2026
2 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
NAME OF WORK : Supply, Installation, Testing and Commissioning of CCMS
based Smart Street Light Feeder Pillar Panels for Replacement
of Existing Street Light Feeder Pillars in Various Zones of Surat
Municipal Corporation
TENDER DOCUMENTS
Publishing Authority: Surat Municipal Corporation
Inviting Authority: Additional City Engineer (Electrical / Mechanical)
Head of the Department: Executive Engineer
Light & Energy Efficiency Cell, Room # 117, 3RD Floor, Main Office
Concerned Office:
Building, Muglisara, Surat- 395
E-mail: [email protected]
Bid Type: E-tender
Website: https://smctender.nprocure.com
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Abbreviation used in this document:
ACE : Additional City Engineer
EEC : Energy Efficiency Cell
Ele : Electrical
Mech : Mechanical
SMC : Surat Municipal Corporation
EMD : Earnest Money Deposit
SD : Security Deposit
RMD : Retention Money deposit
LED : Light Emitting Diode
BRTS : Bus Rapid Transport System
O&M : Operation and Maintenance
pdf : Portable Document Format
I/C. : In-Charge
DD : Demand Draft
RPAD : Registered Post with Acknowledge Due
P.F. : Provident Fund
GST : Goods And Service Tax
TP : Town Planning
MR : Market Rate
CMS : Complaint Management System
CCMS : Centralised Control and Monitoring System
G.I. : Galvanised Iron
MCB : Miniature Circuit Breaker
RCCB : Residual Current Circuit Breaker
SP : Single pole
DP : Double Pole
TP : Triple Pole
TPN : Three Pole with Neutral
DIN : Deutsche InstitutfürNormung, which translates into English as 'German Institute of
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
GIS : Geographical Information System
MIS : Management Information System
EESL : Energy Efficiency Services Limited
ERDA : Electrical Research and Development Association
DWC : Double Wall Corrugated
N.B. : Nominal Bore
SFU : Switch Fuse Unit
XLPE : Cross linked polyethylene
PVC : Polyvinyl Chloride
ID : Internal Diameter
OD : Outer Diameter
sqmm : Square Millimetre
F.L. : Flood Light
RGB : Red Green Blue
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
SR. NO. DESCRIPTION
(1) DETAILED TENDER NOTICE PUBLISHED ON NEWS PAPER/ SMC’S WEBSITE
VOLUME– I (06-31)
(2) QUALIFICATION CRITERIA 08-09
(3) BRIEF DETAILS REGARDING THE WORK 10-11
(4) CONTRACTOR’S / BIDDER’S AFFIDAVIT CUM UNDERTAKING / CERTIFICATE 12-16
(5) SPECIAL TERMS AND CONDITIONS
(6) ANNEXURE –I TO IV 18-21
(7) TECHNICAL / SERVICE PROFILE PERTAINING TO TENDERER 22-24
(8) THE MODE OF DOCUMENT SUBMISSION CUM CHECK LIST 25-27
(9) IMPORTANT DATE
THE VITAL COMMON INFORMATION REGARDING THE TENDER
VOLUME– II (32-80)
(11) BRIEFDETAILS ABOUT THE CONTRACT / WORK : 33-35
(12) ABOUT THE TENDERING PROCESS 36-42
(13) GENERAL TERMS & CONDITIONS OF THE CONTRACT 43-65
(14) CONDITIONS ABOUT THE EXECUTION OF WORK 66-73
(15) SPECIFICATION TESTING & INSPECTION
CONDITIONS REGARDING GUARANTEE/ WARRANTY, SECURITY DEPOSIT/
PERFORMANCE GUARANTEE
(17) PAYMENT & PENALTY TERMS & CONDITIONS 76-79
VOLUME– III (80-88)
(18) DETAILED TECHNICAL SPECIFICATIONS 81-86
(19) GENERAL SPECIFICATION FOR ELECTRICAL INSTALLATION
Total Nos. of Pages:
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
SURAT MUNICIPAL CORPORATION
_Light and Energy Efficiency Cell
Online Tender Notice No. ACE (Ele/Mech)/Light & EEC/13/2025-26
Tender(s) are invited for the following work(s) through online process on
https://smctender.nprocure.comfrom experienced suppliers/ contractors/ Consultants: -
Sr. Name of Work [1] Downloading of bid documents.
No. [2] Pre-Bid Meeting/ E-mail query only.
[4] On line bid submission (Last date)
[5] Submission of bid fee, EMD & other documents in hard
[6] Bid Fee in Rs.
[8] Registration class/ Category
[1] Supply, Installation, Testing and [1] 16/03/2026 to 16/04/2026 up to 18:00 Hrs.
Commissioning of CCMS based [2] 09/04/2026 at 17:00 Hrs. (Email query Only)
Smart Street Light Feeder Pillar
Panels for Replacement of
Existing Street Light Feeder [4] 16/04/2026 up to 18:00 Hrs.
Pillars in Various Zones of Surat [5] From 17/04/2026 to 24/04/2026 up to 17:00 Hrs.
Municipal Corporation [6]
[8] OEM/Authorized Dealer
Bid documents are available on https://smctender.nprocure.com.
Bidders have to submit their bid in electronic format only on https://smctender.nprocure.com
website till the last date & time for submission. Offers in physical form shall not be accepted
Submission of Bid fee, EMD &other documents etc. in hard copy to Chief Accountant, Surat
Municipal Corporation, Shri Tapi Bhavan- Surat Mahanagar Seva Sandan, Tapipura, Surat-
395003 by R.P.A.D. / Speed Post only during the date and time mentioned as above. Surat
Municipal Corporation shall not be responsible for any postal delay.
The SMC reserves the right to accept or reject any or all the bids to be received without
assigning any reason(s) thereof.
In case bidder needs any clarification or if training required for participating in online tender, they
can contact the following office: -
"(n) Code solutions – A division GNFC Ltd." 403, GNFC Info tower, Bodakdev, Ahmedabad –
Tel: +91 26857316/17/18 E-mail:[email protected] Web-site:www.nprocure.com
For further particulars contact above office/ or visit on following websites: www.nprocure.com/
https://smctender.nprocure.com.
Additional City Engineer (Ele./ Mech.),
Surat Municipal Corporation.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
QUALIFICATION BID
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Attention Please
BIDDERS ARE REQUESTED TO PROVIDE ALL INFORMATION/DETAILS/EMD ETC AS ASKED IN THE
TENDER. ANY DEVIATION WHETHER IN TECHNICAL OR COMMERCIAL SHALL NOT BE ENTERTAINED,
AND NO CHANCE SHALL BE GIVEN FOR ANY TECHNICAL OR COMMERCIAL CLARIFICATIONS.TENDERS
SHALL BE OUT RIGHTLY REJECTED IN SUCH CASES.
THEREFORE, BIDDERS ARE REQUESTED TO BE VIGIL WHILE PARTICIPATING
ELECTRONICALLY/UPLOADING TENDER. NO DISPUTE SHALL BE ENTERTAINED ON LATER DATE.
I / WE AFFIRM THAT ALL REQUIRED DOCUMENTS, CERTIFICATES, DATA / INFORMATION, EMD ETC. AS
ASKED IN THE TENDER HAVE BEEN FURNISHED AND / OR ELECTRONICALLY UPLOADED / ATTACHED. I /
WE UNDERSTAND THAT MY / OUR TENDER SHALL BE OUT RIGHTLY REJECTED, IF THOSE CONDITIONS
AREN’T FULFILLED.
ALL THE TECHNICAL SPECIFICATIONS, TERMS, CONDITIONS INCLUDING ADDENDA CORRIGENDUM IS
THOROUGHLY GONE THROUGH BY ME / US. I / WE CONFIRM THAT BID(S) SUBMITTED ARE EXACTLY IN
LINE WITH THE SPECIFICATIONS, TERMS & CONDITIONS STIPULATED IN THE TECHNICAL BID ALONG
WITH THE ADDENDA CORRIGENDUM.
I / WE UNDERSTAND THAT ANY DEVIATION, IF MENTIONED BY ME / US IN SPITE OF ABOVE WILL CAUSE
REJECTION OF MY / OUR TENDER ALTOGETHER AND, AS SUCH PRICE BID WILL NOT BE OPENED.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
QUALIFICATION CRITERIA
The qualification process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule. The following criteria along with other conditions/
criteria shall be applicable to Bidder.
[01] Bidder must possess valid electrical contractor's licensed issued by concerned
department of state government of Gujarat
MOU with Electrical Contractor having validelectrical contractor's licensed issued by
concerned department ofgovernment of Gujarat and having an experience of installation
pf min.25% of total quantity of CCMS estimated in the tender.
[02] Bidders must be OEM of CCMS panel.
[03] Average annual financial turnover of bidder during the last 3 years, ending 31st March of
the previous financial year should be at least 30% of total estimated cost. C.A.'s
certificate must be furnished for the same.
[04] Experience of having successfully completed “similar works”(defined below) during
last 7 years ending last day of month before the one in which tenders are invited
should be either of the followings:
Work Completion Certificate(s) [Containing the details like (i) name of Min. Nos. of
work, sanctioning/ work order/ agreement details, sanctioning WCC
amount, work done amount, work completion date, certificate issue [Work(s)
details (reference no. of issuing department/ authority, date etc.) will Completed
Similar completed works costing not less than the amount equal to
80% of Total Estimated Costin this tender
Similar completed works costing not less than the amount equal to
50% of Total Estimated Cost in this tender
Similar completed works costing not less than the amount equal to
40% of Total Estimated Costin this tender
The word “similar work” signifies Supply of CCMS Feeder Pillar for street light
systemfor government / semi-government organisations / urban local authorities
/PSUs / govt. companies /Limited companies only.(The work completion within last
In case if work is combined with other work(s), documents should prove that amount
of items / work completed for CCMS only and amount must be as per the min.
requirement(s) mentioned in the technical-bid. All necessary documents, including
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
work completion certificate, work order, relevant price-bid, technical-bid
documentsetc. from the authority who has placed the work order.In absence of all
required documents, such works aren’t considered for technical-bid evaluation.
Experience of the work completed for government / semi-government organisations /
urban local authorities, PSUs / govt. companies /Limited companies only. Appropriate
evidence(s) like work completion certificates must be provided).
[05] Following enhancement factors will be used for the cost of works executed and financial
figures to common base for the value of the works completed in India: -
Year Multiplying Factor
One 2024-25 1.10 The year ONE will be considered as the year ending 31st
March of the previous financial year for which tender is
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Work Completion Certificates / Documents:
Bidder has to fill up following tables consciously and, duly sealed and signed, submit in hard copy
within stipulated time mentioned elsewhere in bid.
I / We are providing following information in order to my/our eligibility for the tender under
consideration (Tender ID No._____________.
BIDDERS ARE ADVISED TO SUBMIT ONLY RELEVANT INFORMATION AND ITS SUPPORTIVE
DOCUMENT(S)-COPY OF 3-A FORMS (WORK COMPLETION CERTIFICATES).
For ONE work according to 80.00% of estimated cost in this tendor or 80% of the total nos. of CCMS
in this tender :
Sr. Name of work Actual date of Total Amount of Effective/Consi
Sr. Name of work Actual date of Total Amount of Effective/Consi
No. work Completion Work Done, Rs. derable
For TWO work(s) according to 50.00% of estimated cost in this tender or 50% of the total nos. of
CCMS in this tender :
Sr. Name of work Actual date of Total Amount of Effective/Consider
Sr. Name of work Actual date of Total Amount of Effective/Consider
No. work Completion Work Done, Rs. able Amount, Rs.
For THREE work(s) according to 40.00% of estimated cost in this tender or 40% of the total nos. of
CCMS in this tender :
Sr. Name of work Actual date of Total Amount of Effective/Consider
Sr. Name of work Actual date of Total Amount of Effective/Consider
No. work Completion Work Done, Rs. able Amount, Rs.
Note: PLEASE CLEARLY NOTE THATfilling of above details is must (along with submission of
required certificates / documents) otherwise, offer of such bidder shall be rejected and
price-bid will not be opened.
SEAL & SIGNATURE OF THE TENDERER:
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
BRIEF DETAILS REGARDING THE WORK: -
Work is to be carried out for installation of CCMS for existing street lighting on various roads
with in Surat Municipal Area. It includes installation of 5-6 kW (Single Phase) and 10-12 kW
(Three Phase) capacity CCMS Feeder Pillar and other allied components / accessories for CCMS
Feeder Pillar of streetlight system.
This Specification are provided for the Supply, Installation, Testing and Commissioning of CCMS
based Smart Street Light Feeder Pillar Panels as well as Dismantling of existing feeder pillar.
[B] BRIEF- IMPORTANT TECHNICAL DETAILS OF THE WORK:-
Sr. Item Description(s)
(1) 1 ø CCMS Feeder Pillar 5-6 kW (Single Phase) capacity
(2) 3 ø CCMS Feeder Pillar 10-12 kW (Three Phase) capacity
(3) Earthing for CCMS As per requirement of CCMS mentioned in tender
(4) All Necessary arrangement for installation of New CCMS feeder pillar (Including dismantling of
existing feeder pillar) must be done by the contractor. The entire work should be done without
disturbing streetlights working from concern feeder pillar.
(5) Bidder shall to be note that old dismantled feeder pillar to be deposited in concern Zone of
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
AFFIDAVIT CUM UNDERTAKING CUM DECLARATION BY THE BIDDER REGARDING THE WORK
OF TENDER ID NUMBER: ____________.
(To be furnished on Non-judicial stamp paper (Rs.300.00) duly signed by authorized notary)
Name of Work: - (to be mentioned by the bidder as per detailed tender notice).
[01] I / We, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
[02] The undersigned also hereby certifies that neither our firm
__________________________________________ nor any of its constituent partners have
abandoned any work in India nor any contract awarded to us for such works have been
rescinded, during last five years prior to the date of this application.
[03] The undersigned hereby authorize(s) and request(s) any bank, person, firm or corporation
to furnish pertinent information deemed necessary and requested by the Department to
verify this statement or regarding my (our) competence and general reputation.
[04] The undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the department.
[05] I / We, ______________________________________ solemnly affirm and state on oath
that ____________________________________ (Name of Tenderer) has not been black
listed by any Government / Semi Government / Public Sector Undertaking / Public limited
and not have been banned / suspended business dealings with the said firm. The
information given above is true to the best of my knowledge.
I / We agree that if this information found to be false / wrongful at any stage then, my / our
bid / tender / Contract shall be liable to be rejected / terminated.
[06] Further, at present I / We am / are the partners of this firm, hereby give an undertaking
that, we are jointly and severally responsible to meet all the liabilities over and above the
business of this firm and make good the above financial loss sustained by the Surat
Municipal Corporation as a result of our abandoning the works entrusted to us i.e. this firm:
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
[07] For this tender, I / We will supply ________________ make CCMS and, for that I / We have
submitted authorization letter and service back up after installation.
[08] In order of token of bid submission, I / We am / are submitting tender fees of Rs.________
(in words, Rs._________________________________________, drawn on (bank name)
No._____________, issued on ___________ and, tender guarantee (E.M.D.) of
Rs.________(in words, Rs.________________________, drawn on (bank name)
I / we hereby declare that I / We have gone through the technical bid document, have
examined closely all the specifications / terms & conditions described in the bid document
& addenda corrigendum(s) [if any].
I / We hereby agree to be bound by and, comply with all such specifications / terms,
conditions etc.
I / We also confirm that my / our offer is strictly in line with the tender specifications,
stipulations, terms and conditions etc. and understand that in the event of any deviations,
technical or commercial, my / our price bid will not be opened.
I / We have clearly understood the tender specification(s) / term(s) / condition(s) / all
content of tender and particularly, intent behind the content and bind my / ourselves for
larger intent of the tender & content as well.
If any items / conditions / specifications / scope of work is mentioned differently at more
than one place(s) by chance, most appropriate as decided by the department (Surat
municipal Corporation) will apply & binding to me/us.
I / We clearly understand that all documents/ details/ certificates as asked/ requested along
with the bid must be submitted in soft copy/ hard copy as mentioned in the tender &
submission of such documents etc. after expiry of technical-bid submission date shall not be
accepted and, offer of all such bidders shall be rejected out-rightly.
I / We also clearly understand that dispute(s) created at later date wouldn’t be entertained
&Surat Municipal Corporation can treat them as fraudulent practice(s) and action(s) as
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
deemed fit can be initiated against me / us and I / We have quoted my / our offer and
submitted documents / certificates accordingly.
I / We have gone through the fact(s) as above and, have clear understanding regarding the
Detail Technical Specification as described.
I / We also confirm that I / We have quoted my / our offer (tender) after close examination
of all certificate(s) / document(s) to be submitted either in hard copy or online and
submitted accordingly. I / We are clearly aware that in event of fraudulent practice(s) found
in any of such certificate / document, action(s) to be taken against me as per tender terms
& conditions for such fraudulent practice(s) will be binding & acceptable to me / us.
Signed by an Authorized Officer of the Firm
Title of Officer
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
AFFIDAVIT CUM UNDERTAKING CUM DECLARATION BY CCMS MANUFACTURER
REGARDING THE WORK OF TENDER ID NUMBER: ____________.
(To be furnished onNon-judicial stamp paper (Rs. 300.00) duly signed by authorized notary)
Name of Work: - (to be mentioned by the bidder as per detailed tender notice).
I, the undersigned, do hereby certify that all the statements made in the required attachments are true
I/ We understand that I/ We have offered the CCMS for longer time of use.
I/ We confirm that in case of discontinuation of product of CCMS for the period of seven years, we
will provide spares and service backup after installation.
Seal and Signed by the authorised signatory of the
Title of the office
Name of the firm
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
(To be furnished on letter pad of Chartered Accountant of the bidder.)
It is to certify that,
1. …………………………………………………………….....................…….……(Name of the firm) is a partnership/
proprietary firm/ limited company (strike out, which isn’t applicable) having registered office
number...…………………………………, GST registration number …..................…………………….....
2. The legal name of the firm mentioned in GST registration certificate is
…………………………................................ and trade name of the firm mentioned in GST registration
certificate is....................................……………… and the name of the firm mentioned in PAN
(i) The legal name of the firm mentioned on GST registration certificate has been/ has not been
(strike out, which isn't applicable) prefixed with ..................... (e.g. M/s.. shri, jay etc).
(ii) The trade name of the firm mentioned on GST registration certificate has been/ has not been
(strike out, which isn't applicable) prefixed with ..................... (e.g. M/s.. shri, jay etc).
(iii) The legal name and trade name as mentioned in GST registration certificate is of the same
(iv) The PAN no. & GST registration no. as mentioned above is of the same entity.
(v) This Certificate is valid for One year or till date of any change in above details.
Above certificate is issued based on specific request by .............................................................for
submission to Surat Municipal Corporation.
Signature of the C.A.
Title of the office
Name of the firm
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
SPECIAL TERMS AND CONDITIONS: -
THE FOLLOWINGS MUST BE CONSIDERED: -
1. Each tender must accompany with latest passport size photograph along with specimen
signature of the contractor(s).
2. In the event of the tender being submitted by a partnership firm, signature of all partners must
be done along with their latest photographs duly signed thereof. The partnership deed must
also be attached with the tender. Power of attorney of to sign the all other documents/
certificates must be furnished failing which offer of such bidder shall not be considered.
3. For contractor(s) paying royalties to the Government, the receipt of the same must be
4. The successful contractor(s) shall be required to submit photographs, address and specimen
signatures in duplicate at the time of executing the agreement. The agreement shall be
executed by partner/ person who have signed the tender/ quotation.
5. Affix passport size photograph in table below: -
Note :- Give specimen signature/photo of all partners / Any partner/s who is given power
by agency / firm, in case of partnership agency/ firm: -
1. Submission of registered
agreement is compulsory
2. in case of partnership
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
NOTE: -PLEASE CLEARLY NOTE THAT “SPECIAL TERMS AND CONDITIONS” MUST BE RETURNED DULY
SEALED & SIGNED ALONG WITH THE TECHNICAL-BID.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
BIDDERS ARE ADVISED TO FURNISH EVERY DETAIL(S) IN RESPECTIVE COLUMN OF ALL
ANNEXURE(S).I.E., NO FIELD SHALL BE KEPT BLANK IN ANY ANNEXTURE.
(1) No. of years of experience:
a) as a Prime Contractor (contractor shouldering
major responsibility)
i) in own country
ii) other countries (specify country)
(2) For how many years has your organization been in
business of similar works under its present name?
What were your fields when your organization was
established?Whether any new fields were added in
your organization?And if so, when?
(3) Give details of your similar type of experience in
implementing turnkey projects of electrical work
(4) Give details of similar type of ongoing works
(5) Amount of Solvency Certificates issued by Bankers
(Attach attested copy of latest Solvency
(2) Date of issue
SEAL & SIGNATURE OF THE TENDERER:
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Information Regarding Current Litigation, Debarring/ Expelling of Bidder or Abandonment of Work
1 a) Has the Applicant / tenderer or its constituent partner consistent history of Yes / No
litigation / police case / FIR awarded against him. OR, does any government /
semi government or Local authority has entered any litigation / FIR / Police
case for forgery against him? (If Yes, give details).
b) If yes, give details. (Attach separate sheet if required).
2 a) Has the applicant or any of its constituent partners been debarred / expelled Yes / No
by any Agency in India, during the last 5 years as on the date of application,
except on account of reasons other than non-performance, such as
rescinding of joint venture due to most experienced partner of joint venture
pulling out, court directions leading to breaking up of a joint venture before
b) If yes, give details. (Attach separate sheet if required).
3 a) Has the Applicant or any of its constituent partners abandoned any contract Yes / No
work in India during the last 5 years.
b) If yes, give details. (Attach separate sheet if required).
4 a) Has the Applicant or any of its constituent partners been declared bankrupt Yes / No
during the last 5 years.
b) If yes, give details, including present status. (Attach separate sheet if
5 Has the applicant or any of its constituent partners been debarred by any Yes / No
State R & B Dept. for as on the date of last date of hard copy submission.
Note: If any information in this schedule is found to be incorrect or concealed, pre-qualification
application will be summarily rejected.
SEAL & SIGNATURE OF THE TENDERER
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
"Bill of Quantity with estimated cost for Supply, Installation, Testing and Commissioning of
CCMS based Smart Street Light Feeder Pillar Panels for Replacement of Existing Street Light
Feeder Pillars in Various Zones of Surat Municipal Corporation"
Sr. No. Item Description Qty.
1 Single Phase 5-6 kW, CCMS
2 Three Phase 10kW, CCMS
*** Estimate Amount Rs.
1. All works is to be carried out in the Surat city. Actual payment will be made based on the
actual work completed at site.
the various roads in various Zone within Surat Municipal area.
3. Above work includes dismantling of existing feeder pillar from each site and Complete SITC
of New CCMS feeder pillar system like, CCMS, feeder pillar Enclosure with foundation,
necessary stand and earthing station etc.as per detail specifications mentioned in technical
LINE FORM ONLY. RATE MENTIONED IN ANY HARD COPY (i.e Physical hard copy as well in
form of scan copy attachment) WILL NOT BE CONSIDERED AND TENDER OF SUCH BIDDER
WILL BE OUT RIGHTLY REJECTED.
5. Estimated cost to be quoted separately as % age above / below of the cost estimated as
6. The competent authority of Surat Municipal Corporation reserves the right to reduce the
scope of work without assigning any reason even after award of contract.
7. Contractor is bound to work as per the instruction of Engineer incharge.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Technical confirmation sheet for CCMS feeder Pillar
Bidders must study specifications carefully & confirm that his offered CCMS feeder pillar is
complying all the technical specifications, specified in the detailed specification. Bidders has to
confirm followings: (strikethrough, whichever is not confirmed by the bidder): -
(1) Codes & Standards Yes/ No
(2) Environmental Conditions` Yes/ No
(3) Constructional Features Yes/ No
(4) Data Sheet: Fixed & Performance Parameters Yes/ No
(5) General Data Sheet Yes/ No
(6) Penalty(ies) Yes/ No
(7) Details to Be Submitted by The Bidder Yes/ No
If, my / our confirmation found fake / wrong during verification at any stage or at any stage of
contract, or after contract execution or even after defect liability period; I / We are agreed to
whatever action(s) taken by the competent authority of corporation in the aforesaid
circumstances including forfeiture of security deposit, recovery of penalty amount from any
pending due(s) with SMC, debarring from participation in future tenders for the period / years as
decided by the corporation and informing the same to all other state/ central level Government /
semi-government organizations.
SEAL & SIGNATURE OF THE TENDERER: - SEAL & SIGNATURE OF THE OEM AUTHORITY: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
TECHNICAL/ SERVICE PROFILE PERTAINING TO BIDDERS: -
Sr. Description :- To be filled by Contractor
1 Name of Bidders / Contractor :-
2 The Applicant is :-
a) an individual
b) a proprietary firm
c)a firm in partnership
d)a Limited Company or Corporation
3 Name of contact person :-
E-mail address, if any. :-
Address of Head Office. :-
Address Main office in Gujarat. :-
Office in Surat or nearest to Surat. :-
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
4 Give details about your service network :-
5 Minimum period for attending the call/ :-
breakdown from the time of intimation.
6 Do you agree to all terms and conditions :- Yes
specified in the tender if no, please specify
where and how you differ (attach separate
sheet if necessary)
7 How maintenance/ services will be offered. :-
Specify clearly (i.e. from Surat office or any
8 If order is split or scope of work is reduced, will :- No
it affect your any of terms/ conditions,
guarantee period, servicing, maintenance?
Mention clearly.
9 Testing will be carried out at manufacturer’s :- Yes
works prior to dispatch of equipment as
specified earlier.
10 Rates are inclusive of all taxes (excludingGST), :- Yes
duties, levies, overheads, insurance,
transportation, freight, construction cess etc.
whatsoever is applicable.
11 Portion or percentage of the work the bidder :-
proposes to sub-contract (if any) in case
contract is awarded.
12 For how many years has the organization been :-
in business under its present name & style?
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
In which field of electrical Engineering do you
claim specialization?
14 Details of your latest project completed.
(i) Attach separate sheet/ sheets if where ever required.
(ii) The Corporation will not issue any declaration form.
Signature of Authorized person :-
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
THE MODE OF DOCUMENT SUBMISSION CUM CHECK LIST:
The bidder has to submit following documents as indicated and, duly filled, sealed and signed in order to
consider his bid.
In hard Submission Checked and
Sr. Document(s) In soft copy
copy stage furnished
[01] Tender fee Readable Original
[02] EMD Readable Original during tendering
[03] Bidder's Forwarding letter Readable Original
[04] OEM selected for CCMS Readable Original
[05] Works to be considered for Readable -----
qualification [As per technical Scanned
bid, page No. 10]
[06] Notarised Affidavit [As per Readable Original Submission in
technical bid, page No.12-14] Scanned
hard copy during
[07] Notarised Affidavit [As per Readable Original tendering as a
technical bid, page No.15] Scanned part of
[08] CA's certificate [As per technical Readable Original
Scanned offer submission
bid, page No.16]
[09] Page of Special Terms and Readable Original
Condition [As per technical bid, Scanned
[010] The mode of document Readable Original
submission cum check list [As Scanned
per technical bid, page No.25-
[011] Addenda corrigendum(s).If Readable ----- Online
applicable. Scanned submission
during tendering
[012] Technical/Service Profile Readable -----
Pertaining to Bidders Scanned
offer submission
[013] Valid Electrical Contractor’s Readable -----
License Scanned
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
In hard Submission Checked and
Sr. Document(s) In soft copy
copy stage furnished
Power of attorney if Partnership Scanned
Readable Online
[015] PAN CARD -----
Scanned submission
GST registration certificate Readable during tendering
(must be self attested). Scanned as a part of
Annual Turnover Certificate Readable technical-bid/
offer submission
issued by C.A. Scanned
[018] P.F. Registration (Optional) -----
Professional tax registration Readable
certificate. Scanned
Bank Solvency Certificate.
Readable Online
[020] (Certificate should be 20% of -----
Scanned submission
the estimated amount).
during tendering
[021] ANNEXURE: I, II, III ----- as a part of
technical-bid /
[022] ANNEXURE: IV,V ----- Original offer submission
One sample of each CCMS In Physical to
[023] submission with test certificate ----- ----- Light & EEC
Sealed and signed copy of
[024] ----- Original sanctioning of
IT'S SOLELY BIDDER'S RESPONSIBILITY TO SUBMIT MOST APPROPRIATE DOCUMENT(S)
DURING THE TENDER SUBMISSION. IF, BIDDER FAILS TO DO SO, THE BID SHALL BE REJECTED
AND PRICE-BID OF SUCH BIDDER WILL NOT BE OPENED.
ALL THE DOCUMENTS REQUIRED AS PER THE ABOVE TABLE MUST BE SEALED & SIGNED / SELF
ATTESTED / NOTARISED BY THE AUTHORISED SIGNATORY OF THE BIDDER. SOFT COPY (FILE)
SHALL BE IN PDF/ JPG FORMAT ONLY,
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Head of the Department,
Surat Municipal Corporation.
I / We have gone through the bid document(s) and fact(s). I / We Have clear understanding
regarding the scope as described and, I am / We are consciously submitting my / our bid.
SEAL & SIGNATURE OF THE TENDERER
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
IMPORTANT DATES:
Sr. Description
[01] Downloading of tender : From 16/03/2026 to 16/04/2026 up to 18:00 Hrs.
[02] Pre-bid query, if any : Up to 09/04/2026, 17:00 Hrs, Only through email
[03] On line Tender submission : 16/04/2026 up to 18:00 Hrs.
[04] Submission of Tender fees, : From 17/04/2026 to 24/04/2026 up to 17:00 Hrs.
EMD & other documents etc.
[05] Validity of the bid. : 120 calendar days from submission of Hard Copy of
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
THE VITAL COMMON INFORMATION REGARDING THE TENDER MEMORANDUM:
Sr. Description
[01] Tender Notice No. : ACE(Ele/Mech)/Light& EEC/13/2025-2026
[02] Name of Work : Supply, Installation, Testing and Commissioning of
CCMS based Smart Street Light Feeder Pillar Panels
for Replacement of Existing Street Light Feeder
Pillars in Various Zones of Surat Municipal
[03] Tender Fees : Rs.14,160.00 (including GST)
[04] Earnest Money Deposit : Rs.9,82,000.00
[05] All banking instrument(s) : Must be payable at Surat and in the name of
“Municipal Commissioner, Surat Municipal
corporation” and of any of Banks permitted by the
Govt. of Gujarat vide GR No. FD/MSM/e-
file/4/2024/2859/D.M.O.
[06] Bid Type : E-tender
web site: https://smctender.nprocure.com
[07] Tender (Hard Copy) to be submitted : The Chief Accountant,
to. Accounts Department,
2nd Floor, Shri Tapi Bhavan,
Surat Mahanagar Seva Sandan,
Tapipura, Surat-
[08] Security deposit & retention money: : As mentioned elsewhere in the tender.
[09] Water charge on civil works. : 3%
[010] Defect Liability Period. : (1) 12 month from the date of commissioning.
(2) 18 months from the date of supply.
[011] Time limit for completion of the : 9 Months
[012] Penalties. (1) For late submission of Security Deposit
0.065% on amount of Security Deposit per day.
(2) For work delay 0.2% (Zero-point Two Percent)
of the tender value of unexecuted work per day
of delay subject to maximum 10% of
unexecuted work amount.
[013] Scanned copies. All scanned copies of the document(s)
certificate(s) should be readable and look like an
original. Non readable/improper scanned shall
not be considered.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
[014] Mandatory for bidder. : [01] On completion of the entire work, the
contractor must have to submit "AS BUILT
DRAWING" of the project with marking of
various route of CCMS prior the final bill.
[02] GIS Mapping should be done covering all
switching points and the details of each
switch point, shall be viewable in the web
application software through a Google-map
interface or web based digital map.
Contractor should take GIS Coordinates of
feeder pillar and submit to department. The
department will proceed for GIS mapping.
[015] Stamp Paper(s). : FOR ALL LEGAL DOCUMENT(S), NON JUDICIAL
STAMP PAPER(S) TO BE USED, MUST BE PURCHASED
FROM GUJARAT ONLY.
[016] Signature and page Numbering. : IN THE EVERY DOCUMENT(S) SUBMITTED BY THE
BIDDER, HE HAS TO SIGNED EVERY PAPER ON RIGHT
BOTTOM CORNER AND, MUST MENTIONED PAGE
NUMBER ON RIGHT TOP CORNER ONLY.
Security deposit & retention money:
[A] For Works up to and below Rs.2.0 Cr.
1. Initial security deposit, 2.0% of order To be released after payment of final bill
value. and, completion of defect liability period, if
2. Retention money deposit, 2.0% from Looking to the pros and cons of the work, to
each running bill. be released during payment of final bill.
3. Retention money deposit, 5.0% from Looking to the pros and cons of the work, to
each running bill. be released during payment of final bill.
2.0% initial security deposit to be submitted in form of cash/DD/Pay Order.
[B] For Works above Rs.2.0 Cr.
If, 2.0% initial security deposit is submitted in If, 2.0% initial security deposit is submitted
form of Bank Guarantee. in form of cash/D.D./F.D.R./Pay Order.
1. Initial security deposit, 2.0% of order Initial security deposit, 2.0% of order value.
value. To be released after payment of final bill
Looking to the pros and cons of the and, completion of defect liability period, if
work, to be released during payment of any.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
2. Retention money deposit, 2.0% from Retention money deposit, 2.0% from each
each running bill. running bill.
To be released after payment of final Looking to the pros and cons of the work,
bill and, completion of defect liability to be released during payment of final bill.
3. Retention money deposit, 5.0% from Retention money deposit, 5.0% from each
each running bill. running bill.
Looking to the pros and cons of the Looking to the pros and cons of the work,
work, to be released during payment of to be released during payment of final bill.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Brief details about the contract / work :
RIGHT OF INTERPRETATION OF TENDER SPECIFICATIONS, TERMS & CONDITIONS: -
The right of interpretation of each statement mentioned in this tender document, which also
includes all the terms, conditions, specifications etc. rest with the corporation.
The Surat Municipal Corporation, hereinafter, referred to as the “Corporation” hereby invites
tenders for the work as mentioned elsewhere in this tender document, as per the
specification(s). The Contract documents may be secured in accordance with the notice
Inviting Tender for the said work.
The site is located in Surat city, is very important commercial, textile and diamond city of
Gujarat State located in south Gujarat region. The city is well connected to rest of India by both
Rail and Road. The City locate on bank of river Tapti and enjoy moderate climate having
minimum average temperature as 25°C and extreme ranging from 45°C in summer and 15°C in
winter. The actual average rainfall is approximately 80 cm distributing over three months from
mid-June to mid of September.
The intending bidders shall be deemed to have visited site(s) and familiarized themselves
thoroughly with the site conditions before submitting the tender. Non-familiarity with the site
conditions will not be considered a reason either for extra claims or for not carrying out the
work in strict conformity with the specifications, terms & conditions.
For site visit, the intending bidders may contact Concern Department/Authority, as mentioned,
of Surat Municipal Corporation.
Service roads are laid up to the site of the work. These will be available to the contractor
subject to any limitations imposed by SMC. However, the bidders shall visit the site and
acquaint him of the approaches to the sites before tendering.
Non availability of access roads or railway siding or permits for entry of vehicles and
equipment at any specific area shall in no case be the cause to condone any delay in the
execution of the works or be the cause for any claims or extra compensations.
SCOPE OF WORK:
The scope of the work includes Dismantling of existing feeder pillars& deposit them to
concerned zone of SMC, and all supply, erection, testing, commissioning, including supply of
materials, labour and workmanship, complete, on turnkey basis as detailed in, specifications,
terms & conditions, etc. The Contractor shall make his own arrangement(s) for everything(s),
required for completion of the work.
After satisfactory installation, commissioning, testing and completion with all respect of
CCMS feeder Pillar it will be handed over to Concern zones of SMC.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Scope of work not mentioned specifically in tender document, but required for the completion
of the job shall be considered as part of the tender and shall be executed free of cost. Any site-
specific work, incidental or accidental, shall be considered & included in the scope of work. Any
charges / cost to be incurred towards such work(s) shall be considered and included in the
The entire work covered by this document viz. said work. Bidders shall quote for this
accordingly. The quoted price shall include all taxes (excluding GST), duties, levies,
overheads, insurance, transportation, freight, construction cess etc. whatsoever is applicable
and the price shall remain firm till the completion of the project in all respect.
INCLUSION OF WORK:
Any item of equipment equipment’s/machineries or materials not shown in the
specifications, drawings of as specified elsewhere, but is clearly essential to make the system
operational, shall be supplied and installed by the Contractor even if it has not been shown
or specified therein.
However, to the above requirement, item/ work that is not included in the Contract
Documents shall not be performed except when approved in writing by the Engineer-in-
EXCLUSION OF WORK:
Exclusion of work and addition/ variation in the tender terms & conditions etc. must be
considered while quoting the tender as mentioned in the variable section of the technical bid
BIDDERS TO CONSIDER:
1. The bidder shall produce latest solvency certificate (valid, not more than one year old from
the last date of the submission of hard copy of technical bid) of minimum 20% amount of the
total estimated tender value. (If solvency expires during validity period, it shall be
renewed/fresh solvency shall be submitted to department immediately.)
2. The Supervisor/ wireman permit (issued by Govt. of Gujarat) holder persons must be
employed for the job. The corporation will not be responsible for any accident or injury to the
workman/ staff of the contractor. No compensation of any kind shall be paid by the
corporation. The contractor shall observe latest Government rules regarding labours etc.
3. The firm/bidder should possess adequately qualified electrical personnel required for the
proposed work. Presently, if party is not in possession, the clear confirmation to arrange such
staff/ facilities in the event of award of contract must be furnished.
4. The bidder should have full flagged office with technical personals at Surat. He should clearly
state the arrangement of staff available with them in separate sheet. Relevant sheet must be
clearly filled in.
5. All-important certificate(s) / document(s) / evidence(s) as specified in the technical-
bidshould be duly notarised. All work details should be provided with self-attested copies of
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Execution of Work after Award of Work Order: -
Followings must be ensured on award of work:
(1) Technical data sheet of all item(s) to be tested should be submitted for approval. Proof must
be provided by the manufacturer of CCMS. For the authenticity of the same, it must be
certified by manufacturer only, duly sealed and signed.
(2) Quality assurance plan [QAP] for testing at manufacturer’s works along with drawing of item(s)
to be tested CCMS (with all relevant/ important technical details) should be submitted for
After receiving all aforesaid details / documents, approval will be given for go ahead to
manufacture/supply. Supply of material(s) will not be allowed before aforesaid approval(s).
(3) Third party inspection of all CCMS shall be done by agency appointed/ authorised by SMC, if
(4) If at any time, SMC express intention to test the CCMS at any government recognised
laboratory like ERDA / UL / ERTL / third party NABL approved laboratory; the same shall be
arranged by the bidder. In such case, only testing charges shall be paid by SMC, if the testing
results are found satisfactory otherwise the same shall be borne by the Bidder. Cost towards
all arrangement(s) of such testing shall be borne by the contractor including lodging / boarding
of the representative appointed by SMC.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
ABOUT THE TENDERING PROCESS:
[01] NO DEVIATION IN TECHNICAL SPECIFICATION OR COMMERCIAL TERMS LIKE TERMS OF
PAYMENT, COMPLETION PERIOD ETC. SHALL BE ALLOWED. SUCH DEVIATION (S), IF OFFERED
WILL CAUSE THE REJECTION OF TENDER(S) OUTRIGHTLY.
[02] EMD & tender fee shall also be submitted in electronic format through online (scanned
colour copies) while uploading the technical bid. This submission shall mean that EMD &
tender fee is received for the purpose of opening the bid. Accordingly, offer of those shall be
opened whose EMD & tender fee is received electronically. However, for the purpose of
realization of DD / Pay order, bidder must submit the DD / PO in original through RPAD /
Speed Post so as to reach to the office of the Chief Accountant within the time limits
specified in the tender. In case of Non submission / receiving of Valid D.D./B.Gin Original to
Account Department (Main Office) by bidder shall be initiated and necessary Punitiveaction
shall be taken forabeyance of registration and cancellation of E-tendering code for as
At first instance following amount is to be paid to SMC
Sr. No. Tender Amount (Rs.) Penalty Amount (Rs.)
1 Up to Rs. 1.00 crore 10,000/-
2 More than Rs. 1.00 crore and up to Rs.10.00 crore 20,000/-
3 More than Rs. 10.00 crore and up to Rs.50.00 crore 30,000/-
4 More than Rs. 50.00 crore and up to Rs.100.00 crore 70,000/-
5 More than Rs. 100.00 crore 1,00,000/-
If bidder fails to submit the said amount within 10 days for the First instance OR in case of
second instance of this similar of mistake i.e. non submission of Valid original Demand
Draft (D.D.)/B.G. to the Accounts Department (Main Office) within the specified time
limit, punitiveaction of abeyance/cancellation of E-tendering code for 6 months shall be
taken i.e. such bidder(s) wouldn't be allowed to participate any tenders of Surat
Municipal Corporation for 06 (six) months.
[03] BIDDERS TO READ AND NOTE CAREFULLY:
[A] At his own expenses and prior to submitting his tender, each bidders shall (a) examine
the Contract Documents (b) visit the sites and determine local conditions which may
affect the work including the prevailing wages and other pertinent cost factors (c)
familiarize himself with all central, State and local laws, ordinance, rules, regulations
and codes affecting the material supply including the cost of permits and licenses
required for the work and (d) correlate his observations, investigations, and
determinations with the requirement of the tender documents.
[B] The documents / appendices / annexure / statements should be completed legibly in
ink, checked in responsible manner, signed, stamped and returned together with the
tender security Bond by the bidders.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
[C] All the pages in which entries are required to be made by the bidders are contained in
the tender documents and the bidders shall not take out or add to or amend the text
of any of the documents or else the tender shall be rejected forfeiting the EMD.
[04] EARNEST MONEY DEPOSIT:
[A] Each tender must be accompanied by a receipt of deposit as tender guarantee (Earnest
money deposit) of the amount mentioned in memorandum, in the form of crossed
Demand Draft / Pay Order of Nationalized / Scheduled Bank acceptable to Corporation
drawn in favour of the "Municipal Commissioner, Surat Municipal Corporation"
payable at Surat. The tender bond shall be valid for a period of not less than 180 days
from the date of the tenders are opened and shall comply with the requirements for
Bond as stipulated in the general conditions of contract. The Corporation as a
guarantee will hold the tender guarantee bond that the bidders if awarded the
contract, will enter in to the contract agreement in good faith and furnish the required
bonds. Any tender not accompanied by a tender Guarantee in the form of earnest
money deposit in the form of Bank Draft for the sum stipulated in the tender
document will be summarily rejected.
[B] The earnest money deposit will be refunded to the unsuccessful bidders(s) after the
award of work has been finalized.
The earnest money deposit (tender guarantee) will be forfeited in the event, the
successful bidders fails to accept the contract and fails to submit the performance
guarantee bond to the corporation as stipulated in the tender documents within ten
days after receipt of notice of award of contract. In such case corporation, may
disqualify the bidders from tendering for further works, under the jurisdiction of the
corporation (SMC).
[C] The earnest money deposit of the successful bidders shall be returned after the
performance guarantee bond, as required, is furnished by the bidder.
[D] No interest shall be paid by the corporation on any tender guarantee / performance
[E] Bank guarantee or cheque or FDR shall not be accepted for EMD / tender guarantee.
[05] GST REGISTRATION CERTIFICATES:
Latest GST registration certificates (along with all annexure) should accompany the tender
without which, the tender is liable to be summarily rejected. The GST registration number
must be clearly specified.
[06] DOWNLOADING OF TENDER DOCUMENT:
The tender document for this work is available only in Electronic format, which can be
downloaded free of cost by the bidder. Tender documents consist of two parts (i) technical bid
with qualifying requirements (ii) Price bid.
[07] INFORMATION FOR ON LINE PARTICIPATION:
[A] Internet site address for e-tender activities will be https:// smc.nprocure.com.
[B] Interested bidders can view detailed tender notice and download tender document
from the above-mentioned website.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
[C] Bidders who wish to participate in online tender have to register with the website
through the “New User Registration” link provided on the home page. Bidder will
create login id & password on their own in registration process.
[D] Tenders by partnership firm must be signed by all partners. The full name and
addresses of all the partners shall be furnished. The tenders by Corporation /
Companies must be signed with the legal name of the Corporation / Company by the
president / or by the secretary or other person or persons legally authorised to bind
the Corporation / Company in the matter.
PRICE BID IS NOT TO BE SUBMITTED IN PHYSICAL FORM. PLEASE NOTE THAT NON-
SUBMISSION OF PRICE BID DOES NOT ABSOLVE THE BIDDERS FROM ANY LIABILITY
CREATED FROM THE BID CONDITIONS AND BIDDING PROCESS. ENTIRE TECHNICAL-
BID NEED NOT BE SUBMITTED; HOWEVER, UNDERTAKING AS PER CHECK LIST MUST
BE SUBMITTED DULY SEALED & SIGNED AS A TOKEN/ ACKNLOWLEDGEMENT OF
STUDYING & UNDERSTANDING THE ENTIRE TECHNICAL BID CAREFULLY & INTENDED
PURPOSE OF THE WORK.
[08] PREPARATION OF TENDER DOCUMENTS:
Bidders(s) are requested to note the following while preparing the tender documents:
[A] The document, which is issued by the respective government office in whichever
language, shall be acceptable. In case of language other than Gujarati & Hindi, proper
& authentic interpretation / translation should be furnished, if required. All tender
items and statements shall be properly filled in. Numbers shall be stated both in words
and in figures were so indicated.
[B] Each tender shall be accompanied by the prescribed tender security bond and other
required documents and drawings. All witnesses and sureties shall be persons of status
and proximity and their full names, occupations and addresses shall be stated below
their signatures. All signatures in the tender documents shall be dated.
[C] Delivery of tenders shall comply with notice inviting tenders as to place, date and time.
[09] SUBMISSION OF TENDER DOCUMENT:
Bidders wishing to participate in this e-tender shall be required to procure Digital Certificate as
per Information Technology Act-2000. By using this certificate, the bidder can digitally sign his
electronic bid. Bidders can procure the Digital Certificate from any of the CCA approved
certifying agency or can contact M/ s (n) Code Solution at the below mentioned address who
will assist in procuring the same. Bidders who already have a valid Digital Certificate need not
procure it again. In case bidders need any clarification regarding online participation they can
M/ s (n) Code Solution, 301, GNFC Info Tower, Near Grant Bhagwati Hotel, Ahmedabad–380
URL: https:// smctender.nprocure.com
Bidders who are willing to participate in e-tender need to fill data in pre-defined forms of
Tender fee, EMD (Bid Security), Qualifying Criteria & Technical Bid and Price Bid only.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Bidders should upload scan copies of reference documents in support of their eligibility of the
bid. Technical-bid (except specific documents/ pages) needs not be submitted in hard-copy
instead pdf file of the tech-bid/ documents must be uploaded on respective web-page in pdf
format only. After filling the data in pre-defined forms, bidders need to click on final
submission link to submit their encrusted bid.
BIDS SHALL BE SUBMITTED AS BELOW:
[1] EMD & Tender Fee along with proof of Qualifying Criteria in pre-defined forms, tender
papers & certificates (except specific pages, which must be furnished in hard-copy) in
electronic mode.
[2] Price Bid must be submitted online only.
[I] Price bid in physical form (in hard copy) will not be accepted.
[II] The direct or indirect mention regarding cost in technical-bid shall not be allowed.
THE DOCUMENTS SHALL BE SUBMITTED IN ONE SET IN THE FOLLOWING MANNER:
(a) Set of documents shall be put in a separate sealed cover. Name of the Work, Tender
Notice No. and full name and address of the bidder shall be written clearly on the sealed
(b) The Bank Draft for EMD shall be put in a separate envelope subscribed as “EMD” on top of
the cover. Tender fee amount (DD) shall be put in the same cover.
(c) The documents along with the envelope containing EMD shall be put inside one large
envelope, sealed and clearly super scribed on top of the packet name of the work &
tender notice no. Name and full address of the bidder shall be written on the bottom left
corner of each envelope. Due date of Receiving the tender shall also be mentioned on the
envelope. This cover must be super scribed as “Technical Bid Cover”.
(d) The hard copy as above should be sent to the Chief Accountant,Surat Municipal
Corporation, Muglisara, Surat 395 003 by RPAD & Speed Post only as per the dates
mentioned in the tender notice. SMC shall not be responsible for any postal delay.
(e) Tender documents are not transferable.
(f) Corporation will not defray expenses incurred by bidders in tendering.
[010] TENDER VALIDITY PERIOD:
The validity period of the tender submitted for this work shall be as mentioned elsewhere in
this document and, that the bidders shall not be allowed to withdraw or modify the tender
offer on his own during the validity period. The bidders will not be allowed to withdraw the
tender or make any modifications or additions in the terms and conditions of his tender. If this
is done then the corporation shall, without prejudice to any right or remedy, be at liberty to
reject the tender and forfeit the earnest money deposit in full.
[011] GENERAL PERFORMANCE DATA:
Bidders(s) shall submit all the information, which is sought for in the tender documents in the
form of various schedules. Tenders may not be considered if left blank or the schedules are not
properly filled in before submissions of the tender.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
[012] SIGNING OF TENDER DOCUMENTS:
[ A ] Documents clarifying type of business (as applicable), e.g. Self-declaration in case of
proprietary firm, Partnership deed in case of Partnership firm, Power of attorney and
deed of “karta” in case of HUF, Certificate of incorporation issued by registrar of
companies in case of private/public limited companies etc.
[ B ] All witnesses and sureties shall be persons of status and proximity and their full names,
occupations and addresses shall be stated below their signatures.
[013] TAXES AND DUTIES:
Prices quoted must be inclusive of all taxes (excluding GST), levies, work contract tax, packing/
forwarding, transportation, freight, watch & ward, insurance Construction cess etc.
The Municipal Corporation will not issue “C” or “D” form.
GST (GOODS & SERVICE TAX) has come in to existence from 1st July 2017. Contractor/
Successful Bidder are bound to pay the amount of GST prescribed by the Govt. of India as per
the Terms of Contract agreed upon during the course of execution of this Contract.
[014] WITHDRAWAL OF TENDERS:
If, during the tender validity period, the bidder withdraws his tender, the tender security
(earnest money) shall be forfeited and the bidders may be disqualified from tendering for
further works under the jurisdictions of the SURAT MUNICIPAL CORPORATION.
[015] OPENING OF TENDER DOCUMENTS
1. The Technical Bid will be opened in the office of the competent authority, Surat Municipal
Corporation, Surat, if possible, on next working day of last date of receipt at 16:00 Hours.
Bidders or their representative who wish to participate in tender opening should remain
present at Concern department / authority-Surat Municipal Corporation. Only one
representative of each firm will be allowed to remain present.
2. Technical bid cover containing Technical Bid papers/ documents & EMD will be opened first
and relevant details will be read out.
3. The bidders, who fulfil the requirements of the qualifying criteria & technical-bid, price-bid
of such bidders will be opened.
4. The price bid, which is quoted online on web site https://www.nprocure.com or
https://smc.nprocure.com will remain unopened till the technical bid of all bidders are as
per technically at par.
[016] EVALUATION OF TENDER
Conditional tenders shall not be accepted.
After opening of the technical bid, department will examine the technical bid thoroughly.
The bidder must fulfil all eligibility criteria.
However, tender will be opened for the bidder who qualifies for all terms / conditions. If
bidder is disqualified on any ground, tender for the same will not be opened. For eligibility
of opening of price-bid, all criteria should be fulfilled.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
The bidder is required to furnish all details, literature, certificates etc. as per specifications,
terms & conditions, which is must.
The competent authority of Surat Municipal Corporation reserves the right to reduce the
scope of work without assigning any reason even after award of contract.
Price variation clause of any form shall not be accepted. Price shall remain firm till
execution of work in all respects till the release of security deposit.
[017] CORRUPT AND FRAUDULENT PRACTICES: -
(a) The Employer (SMC) requires that bidders/ contractors under this contract observe the
highest standard of ethics during the procurement and execution of this contract. In
pursuance of this policy, the Authority; Defines, for the purpose of these provisions, the
terms set forth below as follows:
[I] Corrupt practice: means the offering, giving, receiving or soliciting of anything of
value to influence the action of a public official in the procurement process or in
contract execution; and
[II] Fraudulent practice means a misrepresentation of facts in order to influence a
procurement process or the execution of a contract to the detriment of the
Employer, and includes collusive practice among Bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive levels and to
deprive the Employer of the benefits of free and open competition.
[III] Will reject a proposal for award of work if Employer determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing
for the contract in question.
[IV] Will declare a Bidder ineligible, either indefinitely or for a stated period of time, to be
awarded a SMC contract/contracts if he at any time determines that the Bidder has
engaged in corrupt or fraudulent practices in competing for, or in executing, the
(b) The Employer will reject a proposal for award if he determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing for
the contract in question. The Employer will declare the firm ineligible, either indefinitely
or for a stated period of time, to be awarded a contract by Surat Municipal Corporation if
it at any time determines that the firm has engaged in corrupt or fraudulent practices in
competing for the contract, or during execution.
(c) In case of any misunderstanding due to interpretation of any terms, conditions or
specifications the decision of Municipal Commissioner, Surat Municipal Corporation, Surat
shall be final and binding on the part of contractor. In unnecessary queries raised verbally/
and/ or in writing shall be treated as “Fraudulent Practice(s)” and action(s) deemed shall
be taken against such bidder(s) will be taken after taking due permission of Municipal
[018] OPENING OF PRICE-BID:
The bidders whose technical-bid is found as per terms and conditions and achieving the
performance parameters as per tender terms & conditions may be allowed to remain present
during the opening of the price-bid. The Successful bidders of technical bid, who choose to
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
remain present may attend price bid opening and price break-up will be readout at that time.
The competent authority of SMC reserves the right to open/ seal/ accept/ reject any tender
without assigning any reasons thereof.
Price Bid(s) of Bidders, who do not meet the technical requirements of the tender, will not be
Acceptance of tender will rest with the competent authority of the corporation. It does not
bind SMC to accept the lowest bidders and reserves the right to reject any or all tenders
and no reasons will be given for acceptance or rejection thereof. The bidders whose tender
is accepted should enter into a regular contract agreement and to abide by all rules and
regulations embodied in the tender.
[019] AWARD OF CONTRACT/WORK:
On receipt and, scrutiny of bidder's document(s); soft copies as well as hard copy, if bidder
fulfil the tender term(s), the price bid of such bidders will be opened and, proposal for
work sanction and allotment to overall lowest bidder will be sent to the competent
The TENDER GUARANTEE / EMD paid against this tender shall be retained till submission of
performance guarantee by lowest bidder on award of contract. The earnest money deposit
will be forfeited in the event; the successful contractor denies to accept the contract and
fails to submit the performance guarantee bond to the corporation as stipulated in the
tender documents within ten days after receipt of notice of award of contract.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
GENERAL TERMS & CONDITIONS OF THE CONTRACT: -
(1) The contract shall be constituted according to and, subject to law(s) in India and State of
Gujarat and under the jurisdiction of courts of Gujarat at Surat only.
(2) The correctness of each detail given in the tender documents is not guaranteed. The
contractor shall independently obtain all necessary information for quoting/ offering the
tender. The contractor shall be deemed to have examined the contract documents, to have
generally obtained his own information in all matters that might affect the tendered rates.
(3) Any Error in description does not relieve the contractor from executing the work according to
the specifications, terms & conditions. Tender documents must be viewed in totality. If there is
contradiction in any form in this bid document, appropriate as decided by the department/
municipal commissioner will be final & binding to contractor/ bidder(s).
(4) No officer, Employee of Municipal Corporation is admitted to any share or part of this contract
to any benefit that may rise there from.
(5) STORES SUPPLIED BY SMC
If the specification or estimate of the work provides for the use of any special description of
materials to be supplied from the Municipal Store or if it is required that the contractor shall
use certain stores to be provided by the Engineer-in-charge. Such materials and stores and the
prices to be charged thereof as hereinafter mentioned being so far as practicable for the
convenience of the contractor but not so as in any way to control meaning or effect of the
contract specified in the schedule or memorandum hereto annexed) the contractor shall be
supplied with such materials and stores as may be required from time to time to be used by
him for the purpose of the contract only and the value of the full quantity of materials and
stores so supplied shall be set off deducted from any sums then due, or thereafter to become
due to the contractor under the contract, or otherwise or from the security deposit, or the
proceeds of sale thereof shall be deposit is held in Government securities the same or a
sufficient portion thereof shall in that case be sold for the purpose. All material supplied to the
contractor shall remain the absolute property of Municipal Corporation and shall on no
account be removed from the site of the work, andshall at all times be opened to inspection by
the Engineer-in-charge. Any such materials unused and in perfectly good condition at the time
of completion or determination of the contract shall be returned to the Municipal Corporation
store, if the Engineer-in-charge so requires by a notice in writing given under his hand, but the
contractor shall not be entitled to return any such materials except with such consent and he
shall have no claim for compensation on account of any such materials supplied to him as
aforesaid but remaining unused by him or for any wastage in or damage thereto.
(6) ALTERATION IN SPECIFICATIONS
The Engineer-in-charge shall have right of alternation power to take any alteration in, or
addition to specifications the original specifications, drawings, designs and design not
instruction that may appear to him to be necessary to invalidate or advisable during the
progress of the work, and contractors. the contractor shall be bound to carry out the work in
accordance with any instructions in this connection which may be given to him in writing
signed by the Engineer- in-charge and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner above specified as
part of the work shall be carried out by the contractor on the same conditions in all respect on
which he agreed to do the main work and at the same rates as are specified in the tender for
the main work. And if the additional and altered work includes any class of work for which no
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
rates are specified in this contract than such class of work shall be carried out at the rates
entered in the schedule of rates of Municipal Corporation or at the rates mutually agreed upon
between the Engineer-in-charge and the contractor whichever are lower if the additional or
altered work for which no rate is entered in the schedule Rates for works of Rates of Municipal
Corporation is ordered to be not entered in carried out before the rates are agreed upon then
estimate or the contractor shall, within seven days of the schedule of date of receipt by him of
the order to carry out rates of the work, inform the Engineer-in-charge of the Municipal rate
which it is his intention to charge for such Corporation. class of work and if the Engineer-in-
charge does not agree to this rate he shall by notice in writing be at liberty to cancel his order
to carry out such class of work, and arrange to carry it out in such manner as he may consider
advisable provided always that if the contractor shall commence the work or incur any
expenditure in regards thereto before the rates shall have been determined as lastly herein
before mentioned, then in such case he shall only be entitled to be paid in such case he shall
only be entitled to be paid in respect of the work carried out or expenditure incurred by him
prior to the date of the determination of the rate as aforesaid according to such rate or rates
as shall be fixed by the Engineer-in-charge. In the event of a dispute, the decision of the
Commissioner will be final.
Where, however, the work shall have to be executed according to the designs; drawings and
specifications recommended by the contractor and accepted by the competent authority the
alteration above referred to shall within the scope of such designs drawings and specification
appended to the tender.
The time limit for the completion of work shall be extended in the proportion that the increase
in its cost occasioned by alterations or addition consequence of the cost of the original
contract work, and the certificate of the Engineer-in-charge as to such proportion shall be
(7) NO COMPENSATION FOR ALTERATION OR RESTRICTION OF WORKS TO BE CARRIED OUT
If at any time after the execution of the contract documents the Engineer-in-charge shall for
any reason whatsoever, require the whole or any part of the work as specified in the tender to
be stopped for any period or shall not require the whole or part of the work to be carried out
at all or to be carried out by the contractor, he shall give notice in writing of the fact to the
contractor who shall thereupon suspend or stop, the work totally or partially, as the case may
be. In any such case, except as provided hereunder, the contractor shall have no claim to any
payment or compensation whatsoever on account of any profit or advantage which he might
have derived from the execution of the work in full but which he did not so derive in
consequence of the full amount of the work nor having been carried out, or on account of any
loss that he may be put to on account of materials purchased or agreed to be purchased, or for
unemployment of labour recruited by him. He shall not also have any claim for compensation
by reason of any alteration having been made in the original specifications, drawings, designs
and instructions may involve any curtailment of the work as originals contemplated. Where
which however, materials have already been purchased or agreed to be purchased by the
contractor, before receipt by him of the said notice, the contractor shall be paid for such
materials at the rate determined by the Engineer-in-charge, provided they are not in excess of
requirements and are of approved quality and/ or shall be compensated for the loss, if any that
he may be put to in respect of materials agreed to be purchased by him, the amount of such
compensation to be determined by the Engineer-in-charge, whose decision shall be final. If the
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
contractor suffers any loss on account of his having to pay labour charges during the period
during which to stoppage of work has been ordered under this clause the contractor shall on
application be entitled to such compensation on account of labour charges as the Engineer-in-
charge, whose decision shall be final, may consider reasonable, provided that the contractor
shall not be entitled to any compensation on account of labour charges if, in the opinion of the
Engineer-in-charge, the labour could have been employed by the contractor elsewhere for the
whole or part of the period during which the stoppage of the work has been ordered as
The Contractor is required to cover up and protect the works from the weather, and is
required to suspend all `wet' operations during weather which, in the Executive Engineer's
opinion, will be detrimental to the work.
(8) WORK TO BE OPEN TO INSPECTION
All works under in course of execution or executed in pursuance of the contract shall at all-
time be open to the inspection and supervision of the Engineer-in-charge and his subordinates,
and the contractor shall at all times during the usual working hours, and at all other times at
which reasonable notice of the intention of the Engineer-in-charge or his subordinate to visit
the work shall have been given to the contractor, either himself be present to receive orders
and instructions, or have a responsible agent duly accredited in writing present for that
purpose. Orders given to the contractor's duly authorised agent shall be considered to have
the same force and effect as if they had been given to the contractor himself.
(9) NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days’ notice in writing to the Engineer-in- charge or
his subordinate in charge of the work before covering up or otherwise placing beyond the
reach of measurement any work in order that the same may be measured; and correct
dimensions thereof taken before the same is so covered up or placed beyond the reach of
measurement any work without the consent in writing of the Engineer- in- charge or his
subordinate in charge of the work, and if any work shall be covered up or placed beyond the
reach of measurement without such notice having been given or consent obtained, the same
shall be uncovered at the contractor's expense, and in default thereof no payment or
allowance shall be made for such work or for the materials with which the same was executed.
(10) CONTRACTOR LIABLE FOR DAMAGE DONE
If the contractor or his workmen; or servants shall break, deface injure or destroy any part of a
building in which they may be working, or any building, road, fence enclosure or grass land or
cultivated ground continuous to the premises on which the work of any part thereof is being
executed; or if any damage shall be done to the work for any cause whatever while it is in
progress or if any imperfection become apparent in it within the Defect liability period
mentioned above by Engineer-in-charge the contractor shall make good the same at his own
expense, or in default the Engineer in charge may cause the same to be made good by other
workmen and deduct the expenses (of which certificate of Engineer-in- charge shall be final)
from any sum that may be due or thereafter became due to the contractor or from his security
deposit or the proceed of sale thereof or of a sufficient portion thereof.
(11) MATERIAL/TOOL/EQUIPMENTS/DRINKING WATER ETC. REQUIRED FOR COMPLETION OF JOB
The contractor shall supply at his own cost all materials (except such special materials, if any,
as may be supplied from the SMC Stores in accordance with the contract).plant tools,
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
appliances implements, ladders, cordage, scaffolding and any temporary works which may be
required for the proper execution of the work, in the original; altered or substituted from, and
whether included in these specification or, other documents forming part of the contract or
referred to in these conditions or not and which may be necessary for the purpose of satisfying
or complying with the requirements of the Engineer-in-charge as to any matter on which under
these conditions he is entitle to be satisfied, or which he is entitled to require together with
carriage thereof To and from the work. The contractor shall also supply without charge the
requisite number of persons with the means and materials necessary for the purpose of setting
out works and counting, weighing and assisting in the measurement or examination at any
time and from time to time of the work or materials, Failing this the same may be provided by
the Engineer-in-charge at the expense of the contractor and the expense may be deducted
from any money due to the contractor under the contract, or from his security deposit or the
proceeds of sale thereof or of a sufficient portion thereof.
The contractor shall provide all necessary fencing and lights required to protect the public from
accident; and shall also be bound to bear the expenses of every suit. Action or other legal
proceedings, at law, that may be brought by any person for Injury sustained owing to
negligence of the above precautions, and to pay damages and costs which may be awarded in
any such suit action or proceedings, to any such person, or which may with the consent of the
contractor be paid in compromising any claim by any such person. The contractor shall make
his own arrangement for drinking water for the labour employed by him.
(12) LIABILITY OF CONTRACTOR FOR ANY DAMAGE DONE IN OR OUTSIDE WORK AREA
Compensation for all damage done intentionally or unintentionally or by contractor's labourers
whether in or beyond the limits of municipal property shall be estimated by the Engineer-in-
charge or such other office as he may appoint & estimates of Engineer-in-charge subject to the
decision of the Commissioner on appeal be final & the contractor shall be bound to pay the
amount of the assessed compensation of demand failing which the same will be recovered
from the contractor as damage from the security deposit or deducted by the Engineer-in-
charge from any sum that may be due or become due from Municipal Corporation to the
contractor under this contract or otherwise. The contractor shall bear the expenses of
defending any action or other legal proceedings that may be brought by any person from injury
sustained by him owing to negligence of precautions to prevent the spread of fire & he shall
also pay any damages and cost that may be awarded by the court in consequence.
All sums payable by a contractor by way of compensation under any of these conditions shall
be considered as a reasonable compensation to be applied to the use of Municipal Corporation
without reference to the actual loss or damage sustained and whether any damage has or has
not been sustained actual loss.
(13) CHANGES IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In the case of a tender by partners any change in the constitution of a firm shall be forthwith
notified by the contractor to the Engineer-in-charge for his information.
(14) DECISION OF COMMISSIONER TO BE FINAL- REGARDING INTERPRETATION OF TENDER
Except where otherwise specified in the contract decision of the Commissioner shall be final
conclusive and binding on all parties to the contract upon all questions relating to the meaning
of the specification designs, drawings and instructions here in before mentioned and as to the
quality of workmanship, or materials used on the work, or as to any other question, claim,
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
right, matter, or thing whatsoever in any way arising or relating to the contract, designs,
drawings, specifications, estimates, instructions, orders or these conditions, or otherwise
concerning the works or the execution or failure to execute the same, whether arising, during
the progress of the work or after the completion or abandonment thereof.
(15) COMPENSATION UNDER WORKMAN'S COMPENSATION ACT
The contractor shall be responsible for and shall pay any compensation to his workmen
payable under the workmen's Compensation Act 1923 (VIII of 1923) or any statutory
modification thereof for injuries caused to workmen.
(16) CLAIM FOR COMPENSATION FOR DELAY IN STARTING THE WORK
No compensation shall be allowed for any delay caused in the starting of the work on account
of any acquisition of land and in the case of clearance work, for any delay in accordance to
(17) CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
No compensation shall be allowed for any delay in execution of the work on account of water
standing in borrow-pits or compartments. The rates are inclusive for hard or cracked soil,
excavation in mud, soil water or water standing in borrow-pits, and no claim for an extra rate
shall be entertained, unless otherwise expressly specified.
(18) TERMINATION FOR UNSATISFACTORY PERFORMANCE
In any case, under any Clause/s of this tender, the contractor has rendered itself liable to pay
compensation if a breach of any of the terms, conditions, specifications, etc. The SMC shall
To terminate the contract of which a notice in writing to the Contractor by the SMC shall be
conclusive and binding in which case the security deposit of the contractor shall stand
forfeited, at the absolute disposal of the SMC.
To take such part of the work as shall be unexecuted and to give it to another/other contractor
to complete, in which case the expenses incurred, if any, in excess of the sum which would
have been paid to the original contractor, if the whole work had been executed by him (the
certificate of SMC for the excess amount shall be final and conclusive) shall be borne and paid
by the original contractor and may be deducted from any money due to him by the SMC under
the contract or otherwise or from theSecurity deposit or the proceeds of sale thereof, or a
sufficient part thereof.
In any case in which under any clause of or clauses of this contract, the contractor shall have
tendered himself liable to pay compensation amounting to the whole of this security deposit
(Whether paid in one sum or deducted by instalments) or in the case of abandonment of the
work owing to serious illness or death of the contractor or any other cause, the Commissioner
on behalf of the Corporation shall have power to adopt any of the following courses, as he may
deem best suited to the interest of the Municipal Corporation.
To rescind the contract (of which rescission notice in writing to the Contractor under the hand
of the Commissioner shall be conclusive evidence) and in that case that security deposit of the
Contractor shall stand forfeited and be absolutely at the disposal of the Municipal Corporation.
a. To employ labour paid by the Department and to supply material to carry out the works, or
any part of the work debiting the Contractor with correctness of which cost and price, the
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
certificate of the Executive Engineer shall be final and conclusive against the Contractor
and crediting him with the value of the work done, in all respects in the same manner and
at the same rates as if it had been carried out by the contractor under the terms of his
contract, and in that case the certificate of Executive Engineer as to the value of the work
done shall be final and conclusive against the Contractor.
b. To order that the work of the contractor be in measured up and to take such part thereof
as shall be executed out of his hands and to give it to another contractor to complete, in
which case any expenses which may be incurred in excess of the sum which would have
been paid to the original contractor, If the whole work had been executed by him (as to
the amount of which excess expenses the certificate in writing of the Executive Engineer
shall be final and conclusive) be borne and paid by the original contractor and shall be
deducted from any money due to him by the Municipal Corporations under the Contract of
otherwise from security deposit or the proceeds of sale thereof, or a sufficient part
In the event of any of the above courses be adopted by the Commissioner the Contractor
shall have no claim to compensation for any loss sustained by him by reason of his having
purchases or procured any materials or entered into any engagements, or made any
advances on account of or with a view to the execution of the work or the performance of
the contract and in case the contract shall be rescinded under provision aforesaid, the
contractor shall not be entitled to recover, or be paid any sum for any work thereto
actually performed by him under this contract unless and until the Executive Engineer
certifies in writing the performance of such work and the amount payable to him in
respect thereof, and he shall only be entitled to be paid the amount so certified.
In any case in which any of the powers conferred upon the Commissioner shall have
become exercisable and the same shall not have been exercised the non-exercise thereof
shall not constitute a waiver of any of the conditions hereof such powers shall not
withstanding be exercisable in any future case default by the Contractor for which by any
clauses hereof he is declared liable to pay compensation amounting to the whole of his
security deposit and the liability of the contractor for past and future compensation shall
remain unaffected.
In the event of the Commissioner taking, action under any of the clause mentioned as
above, he may, be he so desires to take possession of all or any tools; plant materials and
stores in or upon the works, or the site thereof or belonging to the Contractor, or procured
by him and intended to be used for the execution of the work of any part thereof, paying
or allowing for the same in account at the contract rates, or in the case of contract rates
not being applicable at current market rates, to be certified by the Executive Engineer
whose certificate thereof shall be final. In the alternative the Commissioner may, by notice
in writing to the Contractor or his clerk of the works, foremen or other authorized agent
require him to remove such tools, plant, materials or stores from the premises within a
time to be specified in such notice and in the event of the Contractor failing to comply
with, any such requisition, the commissioner may remove them at the Contractor's
expense or sell them by auction or private sale at the risk and account of the Contractor in
all respects and certificate of the Executive Engineer as to the expense of any such removal
and the amount of the proceeds and expense of any sale shall be final and conclusive
against the contractor.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
The Contract shall not be assigned or subject without the written approval of the Engineer-
in-Charge, and if the Contractor shall assign or subject his contract or attempt to do so, or
become insolvent or commence any proceedings to be adjudicated any insolvent or make
any composition with his creditors, or attempts or attempt to do the Engineer-in-Charge
may, by notice in writing rescind the contract. Also if any bribe, gratuity gift, load,
perquisite, reward or advantage, pecuniary or otherwise, shall either directly or indirectly
be given, promised, or offered by the contractor, or any of his servants or agents to any
public officer or person in the employ of the Municipal Corporation in any way relating to
his office or employment, or if any such officer or person shall become in any way directly
or indirectly interested in the contract the Commissioner may by notice in writing rescind
the contract. In the event of contract being rescinded, the security deposit of the
contractor shall thereupon stand forfeited and be absolutely at the deposit of the
Municipal Corporation and the same consequences shall ensure as if the contract had been
rescinded as per above clauses here of and in addition the contractor shall not be entitled
to recover or be paid or be paid for any work thereto for, actually performed under the
(19) RIGHTS, REMEDIES AND POWERS
TERMINATION OF CONTRACT DUE TO CONTRACTOR’S DEFAULT
If the Contractor
Abandons the work;
At any time, defaults in proceeding with the works with due diligence and continue to do
so after a notice in writing of 7 days from the SMC; or
Commits default in complying with any of the terms and conditions of the Contract and
does not remedy it or take effective steps to remedy it within 7 days after a notice in
writing is given to him to that effect by the SMC; or
Persistently disregards the instructions of the SMC and / or Engineer-in-Charge or
contravenes any provision of the Contract; or
Fails to remove material from the Site or to pull down and replace Work after receiving
from the Engineer-in-Charge notice to the effect that the said materials or works have
been rejected or
Fails to complete the works or items of work on or before the stipulated date(s) of
completion and do not complete them within the period specified in a notice given in
writing to that effect by the SMC; or
Offers or gives or agrees to give to any person in the SMC’s service or to any other
person on this behalf, any gift or consideration of any kind as an inducement or reward
for doing or forbearing to do or for having done or forborne to do any act in relation to
the obtaining or execution of this or
Shall enter into a contract with the SMC in connection with which commission has been
paid or agreed to be paid by him or to his knowledge, unless the particulars of any such
commission and the terms of payment thereof have previously been disclosed in writing
Shall obtain a Contract with the SMC as a result of non- tendering or other non-bonafide
methods of competitive tendering; or
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Assigns, transfers, sub-lets (engagement of labour on a piece-work basis or of labour with
materials not to be incorporated in the work, shall not be deemed to be sub-letting) or
attempts to assign, transfer or sub-let the entire works or any portion thereof without
the prior written approval of the SMC:
The SMC may, without prejudice to any other right or remedy which shall have accrued
or shall accrue thereafter to the SMC by written notice determine the contract either as
a whole or in part.
or otherwise specified elsewhere in contract.
(20) LIABILITY FOR COMPENSATION EVEN IF CONTRACT IS NOT TERMINATED
In case any of the powers conferred upon the SMC by the above Clause become exercisable
and have not been exercised by the SMC, the non-exercise thereof shall not constitute a
waiver of any of the conditions hereof and such powers shall not withstanding anything
contained above, be exercisable in the event of any default by the Contractor for any clause or
clauses hereof and be liable to pay compensation as per the terms of these presents. In the
event of SMC putting in force either of the powers vested in it under the mentioned above, it
may, if it so desires, take possession of all or any of the tools, plant, materials and stores, in or
upon the works or the site thereof or belonging to or procured by the Contractor for the
execution of the work or any part thereof, paying or allowing the same for the adjustment in
account at the contract rates, or in case of these not being applicable, at current market rates
as the case may be and certified by the SMC, whose certificate to that effect shall be final.
Otherwise the SMC may, by notice in writing, ask the contractor, to remove such tools, plant,
materials, or stores from the premises within a 10 days and in the event the contractor fails for
such compliance, the SMC may issue suitable instructions to remove or sell them by auction or
private sale on account of and at the cost and risk of the contractor and the certificate of the
SMC, as to that effect, shall be final and conclusive for the contractor.
(21) TIME EXTENSION
Provided nevertheless if in the opinion of SMC, the contractor is entitled to any extension of
time on account of the works being altered, varied or added or delay by the reason of any
inclement weather or due to the reasons not under the control of the Contractor, the SMC is
empowered to order in writing for the extension of the aforesaid period for final completion,
by such period(s) as it deems reasonable and the Contractor shall complete the works within
such extended period(s). However, the Contractor shall not be entitled to any extension of the
period unless requested in writing for such extension for event, which the Contractor considers
to entitle for requesting for any extension, to Engineer-in-Charge, SMC. The SMC may in its
absolute discretion, dispense with such notice and allow an extension of time. Nevertheless, in
case of any extension of time, the aforesaid provisions for damages and compensation shall
apply in case of non-completion of the works within the extended time. Such time extension
shall not become any base for compensation for contractor under any circumstances what so
(22) MONTHLY ASSESSMENT OF WORKS
All work shall be measured net by standard measure and according to the rules and custom of
the Department of SURAT MUNICIPAL CORPORATION without reference to any local custom.
No proposals to adopt alternative methods for measurement of work will be accepted.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
The Commissioner’s decision as to what is the “Usual method in use in the Department will be
Under no circumstance shall any contractor be entitled to claim enhanced rates for any items
in this Contract.
A bill may be submitted by the Contractor once in each month on or before the date fixed by
the Engineer-in-Charge for all works executed in the previous months and the Engineer-in-
Charge shall take or cause to be taken the requisite measurement for the purpose of having
the same verified, and the claim, so far as it is admissible shall be adjusted if possible within
(thirty) days from the presentation of the bill. If the contractor does not submit the bill within
the time fixed as aforesaid, the Engineer-in-Charge may depute a subordinate to measure up
the said work in the presence of the Contractor or his duly authorized agent whose counter
signature to the measurement list shall be sufficient warrant, and the Engineer-in-Charge may
prepare a bill from such list which shall be binding on the Contractor in all respects. The
payment shall be made as per the decision of engineer in charge. No payment shall be made
for any work, estimated to cost less than Rupees one thousand.
The Contractor shall submit all bills on the printed forms to be hand on application at the office
of the Engineer-in-Charge. The Charges to be made in the bills shall always be entered at the
rates specified in the tender or in the case of any extra work ordered in pursuance of these
conditions, and not mentioned or provided for in the tender at the rates hereinafter provided
for in the tender at the rates hereinafter provided for such work.
The rates for several items of the work agreed to within shall be valid only when the item
concerned is accepted as having been completed fully in accordance with the sanctioned
specifications. In cases where the items of works are not accepted and not completed, the
Engineer-in-Charge may make payment on account of such items at such reduced rates as he
may consider reasonable in the preparation of final or on account bills.
Payment against bills for the work done, subject to the required deductions, shall be made to
the contractor based on detailed measurements and certifications of bills by the Engineer-in-
Charge and on the recommendations of SMC as per the terms of payment mentioned
elsewhere in tender document.
All such intermediate payments shall be regarded as payments by way or advance against the
final payments only and not as payments for work actually done and completed and shall not
preclude the Engineer-in-Charge from requiring bad, unsound imperfect of unskilful work to be
removed and taken away and reconstructed, or re-erected, nor shall any such payments be
considered as an admission of the due performance of the contract or any part thereof in such
respect of the accruing of and claim nor shall it conclude, determine or affect in any the
powers of the Engineer-in-Charge as to the final settlement and adjustment of the accounts or
otherwise, or in any other way vary or affect the contract. The final bill shall be submitted by
the contractor within one month of the date fixed from the completion of the work, otherwise
the Engineer-in-Charge's certificate to the measurement and of the total amount payable for
the Engineer-in-Charge's certificate to the measurement and of the total amount payable for
the work shall be final and binding to contractor.
The final bill for the work will be assessed on the modified Tender, wherever applicable, to give
effect to the omissions, additions or variations from the prescribed drawings, specifications,
and instruments and the detailed assessment of such omissions or variations.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Provided always that no final or other certificate is to cover or relieve the Contractor from its
liability under the provisions of the following clause
Whether or not the same may be notified by SMC at the time or subsequent to the granting of
the certificate.
All material supplied and work done by the Contractor shall remain the absolute property of
the MunicipalCorporation, and shall on no account be removed from the site of the work, and
shall at all times be opened to inspection by the Engineer-in-Charge.
When the estimate on which a tender is made includes lump-sums in respect of parts of the
work the contractor shall be entitled to payment in respect of the items of work involved or
the part of the work in question at the same rates as are payable under contact or such items
or if the part of the work in question is not the opinion of the Engineer-in-Charge capable of
measurement the Engineer-in-Charge may at his discretion pay the lump sum amount entered
in the estimate, and the certificate in writing of the Engineer-in-Charge shall be final and
conclusive under the provisions of the clause.
Under any circumstance any interest on any account what so ever due to incident of the
contract shall not be payable to contractor.
All such intermediate payments shall be regarded as payments by way or advance against the
final payments only and not as payments for work actually done and completed and shall not
preclude the Engineer-in-charge from requiring bad, unsound imperfect of unskilful work to be
removed and taken away and reconstructed, or re- erected, nor shall any such payments be
considered as an admission of the due performance of the contractor any part thereof in such
respect of the accruing of and claim; nor shall it conclude, determine or affect in any way the
Powers of the Engineer-in-charge as to the final settlement and adjustment of the accounts or
otherwise, or in any other way vary or affect the contract. The final bill shall be submitted by
the Contractor within one month of the date fixed for the completion of the work, otherwise
the Engineer-in-charge's certificate to the measurement and of the total amount payable for
the Engineer-in-charge's certificate to the measurement and of the total amount payable for
the work shall be final and binding on all parties.
If at any time before the security deposit is refunded to the Contractor, it shall appear to the
Engineer-in-charge of the work that any work has been executed with unsound imperfect ,or
unskilful workmanship or with materials of inferior quality; or that any materials or articles
provided by him for the execution of the work are unsound, or of a quality inferior to that
contracted for, or otherwise not in accordance with the contract, it shall be lawful for the
Engineer-in-charge to intimate this fact in writing to the Contractor and then notwithstanding
the fact that the work, materials or articles complained of may have been in advertently
passed, certified and paid for,the Contractor shall be bound forth with to rectify, or remove
and reconstruct the works so specified in whole or in part as the case may require, or if so
required, shall remove the materials or articles so specified and provide other proper and
suitable materials or articles at his own charge and cost; and in the event of his failing to do so
within a period to be specified by the Engineer-in-charge in the written intimation a foresaid,
the Contractor shall be liable to pay compensation at the rate of one percent on the amount of
the estimate for every day not exceeding ten days, during which the failure so continues and in
the event of any such failure as a foresaid the Engineer-in-charge may rectify or remove and
re-execute the work or remove and replace the materials or articles complained or as the case
maybe at the risk and expense in all respects of the contractor, should the Engineer-in-charge
consider that any such inferior work or Materials as described above may be accepted or made
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
use of it; shall be within his discretion to accept the same at such reduced rates along with the
appropriate penalty as the Commissioner may deem fit. The period to be counted from that
date of final completion and handing over of the work to the Municipal Corporation during
which the Contractor is so liable for any defects in the work shall be the Defects Liability Period
shown in the attached Memorandum.
(23) COMPLETION CERTIFICATE
The Work shall be deemed to have been completed in all respects on the day SMC certifies
that the Works have been completed in accordance with the Contract and issues a Certificate
to that effect.
The stage of work completion shall mean, the work completed by contractor with all respect
and according to terms, conditions and specifications. This stage will be considered after
completion of trial run.
(24) WORK TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS, DRAWINGS AND ORDERS
The Contractor shall execute the entire work in the most productive, professional and prudent
manner both as regards usage of materials and time in every respect in strict accordance with
the approved design, specifications, drawings, etc.
The Contractor shall comply with the provisions of the contract and with due care and
diligence execute and maintain the works and provide all labour and materials, tools and
plants including for assessment and supervision of all works, structural plans and other things
of temporary or permanent nature, required for such execution and maintenance in so far as
the necessity for such provision is specified or reasonably inferred from the contract. The
contractor shall take full responsibility for adequacy, suitability and safety of all the works and
methods of erection / installation.
All works under the contract shall be executed under the directions and subject to the
approval in all respects of the SMC which shall for time to time direct at what point(s) and in
what manner the works to commence, and carried on.
The contractor shall execute the whole and every part of the work in the most substantial and
workman like manner, and both as regards materials and in every other respect in strict
accordance with the specifications. The contractor shall also conform exactly, fully and
faithfully to designs, drawings and instructions in writing relating to the work signed by the
Engineer-in-charge and lodged in his office and to which the contractor shall be entitled to
have access for the purpose of inspection at such office, or on the site of the work during office
hours, and the contractor shall, if he so requires, be entitled at his own expense to make or
cause to be made copies of the specifications and of all such designs, drawings and instruction
(25) ACTION IN CASE WORK NOT DONE AS PER SPECIFICATIONS
All works in the course of execution or executed in pursuance of the contract shall, at all times,
be open and accessible to the inspection and supervision of the SMC or its authorized
representative and the contractor shall, at all times, during the usual working hours and at all
other times at which reasonable notice of the visit of such representatives has been given to
the contractor, either himself be present to receive orders and instructions or has a
responsible agent duly accredited in writing, present for that purpose. Orders given to such
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
agent shall be considered to have the same force as if they had been given to the Contractor
If at any time, it appears to the SMC or its authorized representative that any work has been
executed with unsound, imperfect, or unskilful manner, or with inferior or grade of materials
or articles or otherwise not in accordance with the contract for the execution of the work, the
contractor shall, on demand in writing, which shall be made within the Project Completion
Period from the SMC specifying such work, materials or articles, notwithstanding that the
same may have been passed, certified and paid for forthwith rectify, or remove and
reconstruct the work so specified in whole or in part, as the case maybe, and remove the
materials or articles so specified and provide materials or articles as per the terms and in
accordance with the spirit of the contract, at its own expense and cost. In the event of the
Contractor failing to do so within a period specified by the SMC in its demand as aforesaid, the
Contractor shall be liable to pay compensation at the same rate as for non-completion of the
work in time for the default on its past.
In such case the SMC may at its sole discretion, accept the item of work at reduced rates as
applicable under the contract during the preparation of on account bills or final bill. Further, if
the item is so acceptable, without detriment to the safety and utility of the item and the
structure the SMC may
Reject the work outright without any payment and/or get it other connected and incidental
items rectified, or removed and re-executed at the risk and cost of the contractor. The decision
of SMC to be conveyed in writing in respect of the same will be final and binding on the
(26) INTERPRETATION OF CONTRACT DOCUMENTS / DISCREPANCIES BETWEEN INSTRUCTIONS
Should any discrepancy occur between the various instructions furnished to the contractor his
agents or staff, or any doubt arises as to the meaning of any such instruction or, should there
be an misunderstanding between the contractor's staff and the Engineer-in-charge's staff ,the
Contractor shall immediately report the matter in writing to the Engineer-in-charge whose
decision there on shall be final and conclusive and no claim for losses alleged to have been
caused by such discrepancies between instructions, doubts or misunderstanding shall in any
event be admissible.
(27) STATUTORY AND OTHER OBLIGATIONS REGARDING WORKMEN
The Contractor shall comply with all Central, State and Local Regulations, enactment and laws
pertaining to workmen labour compensation or otherwise and the Engineer-in-Charge shall
have the right to inquire into and decide all complaints in such matters.
The contractor shall work only during the daylight hours as approved by the SMC / Engineer-in-
Charge unless he obtains the prior written approval to do otherwise. Even if such approval is
given, no liability in respect of any excess cost arising there from shall be borne by the
The Contractor shall be solely liable for all the pecuniary and other consequences arising on
account of violation or default on its parts of any of the provisions of the laws, Acts, Rules and
Regulations or any other statutory obligations which may be in force, from time to time,
regarding the conditions of employment of workmen. In addition, any such failure or violation
or default on part of the Contractor will constitute a breach of the conditions of the contract
and liable for suitable actions in terms of the relevant clauses thereof.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
The contractor shall be liable to pay the wages directly to the workmen/workers employed by
him on the works without the intervention of any intermediaries and shall ensure that no
amount by way of commission or otherwise is deducted or recovered by such intermediaries
from the wages of workmen/ workers.
(28) FORCE CLOSURE OF CONTRACT OR ABANDONMENT DUE TO REDUCTION IN THE SCOPE OF
If, at any time after the commencement of work, the SMC, for any reason whatsoever, does
not require the whole work as specified in the tender to be carried out, the SMC or its
authorized representative shall give a notice in writing, to that effect to the Contractor and the
Contractor shall have no claim to any payment or compensation what so ever on account of
any profit or advantage which he might have derived from the execution of the works in full
but could not derive in consequence of such decision of the SMC. He shall have no claim for
the compensation by reason of any alteration having been made in the original specifications,
drawings and instructions which may involve any curtailment, variation or increase of the work
as originally contemplated.
(29) TEMPORARY SUSPENSION OF WORKS
If the work should be suspended by the reason of rain, strike, lock outs, or other causes, the
Contractor shall take all necessary precautions for the protection of the Works and shall at his
own cost and expense make good any damage arising from any of these causes. No claim in
this regard shall be entertained.
(30) AMBIGUITIES OR DISCREPANCIES IN DRAWINGS AND SPECIFICATIONS
The Contractor shall from time to time check all Drawings and Specifications and shall
promptly notify the Engineer-in-Charge of any omission or discrepancies therein. In case of
ambiguities or discrepancies in Drawings, Specifications or Schedule of Quantities and
Rates/Prices or any of them, the same shall be referred to the SMC in writing, and the decision
of SMC shall be final and binding on the Contractor.
(31) GUARANTEE OF WORKS AND LIABILITY FOR DAMAGES, DEFECTS ETC
The defect liability period in respect of the works shall be fulfilled and adhered to after
completion of the work. The Contractor shall guarantee that the Material/equipment or parts
thereof provided under the contract are new and free from defects in design, material and
workmanship. The contractor shall also give guarantee for the satisfactory performance of the
material/equipment or parts thereof provided under the contract and for the workmanship of
the works executed as per the contract. This guarantee shall be valid for the duration of the
defect liability period. Any defects, that may appear in the work within the defect liability
period, which in the opinion of SMC or the Engineer-in-Charge is due to defective or improper
material/equipment or bad workmanship or the work not being in accordance with the
drawings, specifications or instructions under the contract shall be made good and/or repairs
by the Contractor at his own cost and expense.
If it is found that the performance of the Material/equipment or parts thereof are not
satisfactory and that any defect in design, material and/or workmanship is found within the
defect liability period, the Engineer-in-Charge shall intimate to the Contractor to that defect in
writing. The Contractor shall immediately but not later than 7 days of the receipt of such
intimation investigate the causes of such defects. The Contractor shall arrange to provide
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
within a reasonable period all the necessary Engineering designs, materials for the
rectification/replacement of the defective Material/equipment or parts thereof at site at his
own cost and expense. If the Contractor fails to take proper corrective action to repair the
defects or otherwise to replace the Material/equipment or parts thereof to the satisfaction of
the Engineer-in-Charge within a reasonable period, the SMC may at its option after giving
days’ notice in writing, take suitable action for such rectification or replacement, as it deems
necessary, at the risk and cost of the Contractor.
In the event of an emergency in the opinion of the Engineer-in-Charge, where the delay would
cause serious loss or damage or in the cases of minor defects found in the designs, materials
and/or workmanship, within the defect liability period, the SMC shall however, have a sole
right to take up immediately, notwithstanding Clause 2.20.2. Above, suitable corrective action
for repair or rectification or replacement as deemed necessary, through a third party chosen
by the SMC without any advance intimation to the Contractor. In such cases, the Contractor
shall be intimated and shall assist and cooperate in making the repairs/rectification.
In case the defects are of such nature that the Material/equipment or parts thereof requires to
be taken to the workshop of the Contractor for rectification, the same shall be taken by the
Contractor at his cost and expense. In case the Contractor so desires the same shall be so
dispatched at the risk and cost of the Contractor. However in both cases, the Contractor shall
furnish necessary Hypothecation Deed to the Engineer-in-Charge in respect of such
Material/equipment or part thereof, and shall provide additional bank guarantee (Nationalized
bank only) of amount equal to the cost of Material/equipment, as required by the Engineer-in-
Charge before the Material/equipment, or parts thereof are removed from the site. After the
necessary rectification or replacement, the Contractor shall deliver and duly install the
Material/equipment or parts thereof at site at his own expense to the satisfaction of the
Engineer-in-Charge. All risks in transit to and from the site shall be borne by the Contractor.
If the repairs, replacement or modifications as referred above are of such nature as may affect
the efficiency of the Material/equipment or parts thereof, the SMC shall have the right to give
to the Contractor a notice in writing within one month of such repair, replacement, renewal to
carry out the tests, as may be required, for the acceptance of the equipment by the Engineer–
When the defective Material/equipment or parts thereof are not repairable at site and sent to
the workshop of the Contractor for necessary repairs or replacement but are essential for the
operation of the facility, the Contractor shall take all the necessary steps to the satisfaction of
the Engineer-in-Charge to minimize interruptions in the operation of the facility till such time
the repaired equipment or parts thereof are returned back satisfactorily.
Material/Equipment or parts there of so repaired or replaced shall have further defect liability
period of 36 months from the date of acceptance, of such repair or replacement, by the
Engineer-in-Charge and the contractor shall immediately arrange to extend the validity of the
respective Bank Guarantee to adequately cover the extended period. Failing to supply the
repaired Material/equipment with the mutually agreed time period, the bank guarantee shall
be forfeited to SMC and the Material/equipment will be replaced by SMC at risk and cost of
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
(32) EQUIPMENT NEEDED FOR THE WORKS
The Contractor shall, at his own cost and expense, provide all the Material/equipment,
machineries, tools, etc. required for the works.
All Material/equipment to be provided by the Contractor shall be in conformity with the
specifications laid down or referred to in the Contract and the Contractor shall on the request
of the Engineer-in-Charge, furnish proof, to the satisfaction of the Engineer-in-Charge, that the
Material/equipment so comply.
The Engineer-in-Charge shall be entitled to have tests carried out as specified or referred to in
the contract for any Material/equipment provided by the Contractor at the cost and expense
of the Contractor and the Contractor shall provide at its cost and expense all facilities which
the Engineer-in-Charge may require for such purpose. In case of the tests not being specified in
the Contract, but are considered necessary by the Engineer-in-Charge, the Contractor shall
provide all facilities and assistance required for the purpose and the charges for such tests
shall be borne by the Contractor.
All Material/equipment and parts thereof shall be of such design as properly and satisfactorily
function under all operating conditions. All the components or Material/equipments shall have
proper factor of safety, maximum efficiency minimum wear and tear and ability to withstand in
the respective environmental conditions encountered at the specific location, whether
specifically mentioned in the specifications or not. Equipment shall be new, free from defects
and of best quality. All the equipment shall conform to the latest revised relevant Indian /
International Standards. Equipment which do not conform to either Indian Standards or the
International Standards accepted in India, shall require approval of the SMC or Engineer-in-
Charge by the Contractor furnishing a sample with the test certificate and performance
certificates from a duly recognized test house in India.
(33) REMOVAL OF SITE STAFF ON THE DIRECTION OF THE ENGINEER-IN-CHARGE
The Engineer-in-Charge may require the Contractor to dismiss or remove from the site of the
work any person or persons in the contractors' employment who may be found to be
incompetent or misconduct(s) and the Contractor shall forthwith comply with such
The Contractor shall provide and employ on the site only such efficient and competent
engineers, supervisors and skilled, semi-skilled and unskilled workers as are necessary for the
proper supervision and timely execution of the Works. Orders / instructions given to the
Contractor’s Engineers/ Supervisors shall be considered to have the same force as if it had
been given to the Contractor himself. The contractor is bound to remove any of its employees
from the works/ site if the said employee is not acceptable to the Engineer-in-Charge.
(34) CHANGES IN FIRM'S CONSTITUTION
Where the Contractor is a partnership firm/ private/public organization, a prior approval in
writing from the SMC shall be obtained for any change in the constitution of the firm. Where
the Contractor is an individual or a Hindu undivided family, such approval as aforesaid, shall
likewise be obtained before the contractor enters into any partnership agreement where
under the partnership firm would acquire the right to carry out the business of the Contractor.
If such prior approval is not obtained, the contract shall be deemed to have been assigned in
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
contravention of clause mentioned elsewhere in the tender, for the work hereof and the same
action may be taken, and the same consequences shall ensure as provided in the said Clause.
(35) DECISIONS BY THE SMC AND ENGINEER-IN-CHARGE
It shall be accepted, like as an inseparable part of the Contract, that in matters quality of
materials, workmanship, removal of improper work, interpretation of Contract, drawings and
specifications, mode or procedure of carrying out the work, the decision of the SMC shall be
final and binding on the Contractor and for any technical question which may arise touching
the Contract, the SMC or Engineer-in-Charge decision shall be final and conclusive.
(36) PATENTS, RIGHTS AND ROYALTIES
The Contractor shall fully indemnify the SMC and their all agents, servants and employees of
the SMC against any action, claim or proceedings relating to infringement or use of any patent
or design or any alleged patent or design rights and shall pay the royalties or other charges
which may be payable in respect of any article or part thereof included in the Contract. In the
event of any claim being made or action being brought against the SMC or any agent, servant
or employee in respect of any of the matters aforesaid, the Contractor shall be notified thereof
for taking necessary action at its cost and expense.
(37) RIGHT OF SURAT MUNICIPAL CORPORATION TO CAUSE AUDIT OF THE ACCOUNT OF
CONTRACTOR AND TECHNICAL EXAMINATION OF THE WORK
The SMC shall have the right to cause an audit and technical examination of the works and the
final bills of the contractor including all supporting vouchers, abstract, etc., to be made after
payment of the final bill and if as a result of such audit and technical examination any sum is
found to have been overpaid in respect of any work done by the Contractor under the Contract
or found not to have been executed, the Contractor shall be liable to refund the amount of
over-payment and it shall be lawful for the SMC to recover the same from the Contractor in
the manner prescribed or in any other manner legally permissible; and if it is found that the
Contractor was paid less than what was due to it under the Contract in respect of any work
duly executed by the Contractor, the amount of such under payment shall be duly paid by the
SMC to the Contractor, without any interest thereon whatsoever.
(38) SUPERINTENDENCE OF WORK BY THE CONTRACTOR, SUPERVISION, TECHNICAL STAFF,
The Contractor shall provide all the necessary superintendence during the execution of the
work and subsequently as long as may be necessary for proper fulfilling of the obligations of
the Contractor under the contract.
The Contractor shall, immediately after receiving letter of acceptance of the tender and before
commencement of the work, intimate in writing to the SMC, the name, qualification,
experience, age, address and other particulars along with certificates, of the principal technical
representative/ Project Engineer to be in charge of the work. Such qualifications and
experience shall be in the relevant field. The SMC shall, within 15 days of the receipt of such
communication, intimate in writing its approval or otherwise of such representative of the
Contractor. Any such approval may, at any time, be withdrawn and in case of such withdrawal
under this clause, the decision of the SMC shall be final and binding on the Contractor. Such a
principal technical representative/Project Engineer shall be appointed by the Contractor soon
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
after the receipt of the approval from the SMC and shall be available at site within fifteen days
of the start of the work.
In case where the Contractor is a sole proprietorship or partnership firm and the sole
proprietor or partner himself / herself has such qualification, it shall not be necessary for the
said Contractor to appoint such a principal technical representative but in such case the
Contractor shall designate and appoint a responsible agent to represent him / her who will be
present at the works whenever the Contractor is not in a position to be so present. All the
provisions applicable to the principal technical representative under the Contract shall be
applicable, in such a case, to the Contractor or its designated representative, in charge of the
work in writing or in person or otherwise, present himself / herself to the Engineer-in-Charge
and/or at the site of work, as required, to take instructions. All instructions given to the
principal technical representative or the responsible agent shall be deemed to have the same
force as if they have been given to the Contractor. The principal technical representative
and/or the Contractor or its responsible authorized agent shall be actually available at site at
least three working days in every week, as determined by the Engineer-in-Charge in
consultation with the Contractor, by a written notice, and shall also note down instructions
conveyed by the Engineer-in-Charge in the site order book and shall affix its/his/her signatures
in token of noting down the instructions and acceptance of the same. There shall be no
objection if these details are disclosed to the Engineer-in-Charge and he shall be satisfied that
the provisions and the purpose of this clause are fulfilled satisfactorily.
If the Engineer-in-Charge, whose decision in this respect is final and binding on the Contractor,
is convinced that no such technical representative or agent is effectively appointed or is
effectively attending or fulfilling the provision of this clause, a recovery shall be effected from
the Contractor as per the relevant Clause(s) and the decision of the Engineer-in-Charge, as
recorded in the site order book and assessment recorded in assessment Book, shall be final
and binding on the Contractor. Further if the Contractor fails to appoint a suitable technical
representative or responsible agent and if such appointed person is not effectively present or
does not discharge his/her responsibilities satisfactorily, the Engineer-in-Charge shall have full
powers to suspend the execution of the work until such date a suitable person is so appointed
and the Contractor shall be held solely responsible for the delay so caused in the matter.
The Contractor shall provide and employ skilled, semiskilled and unskilled labour as is
necessary for the proper and timely execution of the work.
The Engineer-in-Charge shall be at a liberty to object and require the Contractor to remove
from the works any person who in his opinion misconducts himself or is incompetent or
negligent in the performance of his/her duties or whose employment is otherwise considered
by the Engineer-in-Charge to be undesirable. Such person shall not be employed again at
works without the written permission of the Engineer-in-Charge and the Contractor shall
suitably replace the person so removed, as soon as possible.
All works under in cause of execution or executed in pursuance of the contract shall at all-time
be open to the inspection and supervision of the Engineer-in-Charge and his subordinates, and
the contractor shall at all times during the usual working hours, and at all other times at which
reasonable notice of the intention of the Engineer-in-Charge or his subordinate to visit the
work shall have been given to the contractor, either himself be present to receive orders and
instructions, or have a responsible agent duly accredited in writing present for that purpose,
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
orders given to the contractor's duly authorized agent shall be considered to have the same
force and effect as if they had been given to the contractor himself.
The contractor shall give not less than five days’ notice in writing to the Engineer-in-Charge or
his subordinate in charge of the work before covering up or otherwise placing beyond the
reach or measurement any work in order that the same may be measured; and correct
dimensions thereof taken before the same is so covered up or placed beyond the reach of
measurement any work without the consent in writing of the Engineer-in-Charge or his
subordinate in charge of the work, and if any work shall be covered up or placed beyond the
reach of measurement such notice having been given or consent obtained, the same shall be
uncovered at the contractor's expense, and in default thereof no payment or allowance shall
be made for such work or for the materials with which the same was executed.
(39) TAXES, AND DUTIES TO BE PAID BY THE CONTRACTOR, OBTAINING OF PERMIT ETC.
RESPONSIBILITY OF THE CONTRACTOR
Any other taxes, customs, works contract tax, Construction cess, stamp or any other statutory
duties or dues of Central or state government(s) or Authorities on the equipments and/or
components in respect of the contract, including applicable works contract tax, income tax and
construction cess shall be payable by the contractor and shall be deemed to have been
included in the amount quoted by the contractor for executing the works under the contract.
The SMC shall not entertain and shall not be liable for any claim whatsoever in this respect and
shall not issue any kind of certificate to the Contractor for obtaining exemption / concession
from the respective concerned authorities.
If pursuant to or under any law, notification or order, any fee, cess or the like becomes payable
by the Contractor to the Central or State Government(s) or any local authority in respect of any
material used by the contractor in the works, the SMC shall have a right to recover the amount
paid in the circumstances by SMC, towards the said levies, from the dues of the Contractor.
(40) EXCEPTED RISKS (FORCE MAJEURE)
If, at any time, the execution of the Contract is affected by War, (declared or not), hostilities,
invasion, acts of foreign enemies, civil war, rebellion, revolution insurrection, riots and civil
commotion (other than solely restricted to the employees/workers of Contractor), Acts of
State, Acts of God such as earthquake, massive floods and other notified epidemic which an
experienced Contractor could not have reasonably foreseen or reasonably made provision for
these or insured against, then the Contractor shall, within seven days of such occurrence, apply
to the SMC together with the adequate evidence for obtaining such extension of time as may
be warranted by the circumstances. After a careful examination of the circumstances, the SMC
may grant such extension of time as deemed necessary, without insisting on changing
liquidated damages from the Contractor for such period.
Any extension of time granted by the SMC shall neither entitle the Contractor to claim for any
increase in prices nor shall it release him from any of the obligations under the Contract. If the
execution of the Contract as a whole is delayed by the reason of force majeure conditions
persisting for a continuous period exceeding six months, the SMC and the Contractor shall
discuss the matter and decide either to terminate the Contract without obligations on each
side or to continue its execution on such terms as may be agreed upon.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
(41) APPRENTICES ACT PROVISIONS TO BE COMPLIED WITH
The Contractor shall remain liable for the payments of all wages or other money to its
employees or workers under the Minimum Wages Acts, Payment of Wages Act, Employees
Liability Act, Workmen’s Compensation Act, ESI Act or any other laws, enactments and rules in
force or made applicable from time to time by the Central or State Government(s). The
Contractor shall also comply with the provisions of the Apprentice Act, Contract Labour
(Regulations and Abolition) Act and the Rules and Orders issued there under from time to
time. In case the SMC pays or becomes liable to pay any wages or dues to the labour or to any
Government Agency under any of the provisions of the said acts or rules or other regulations,
due to the omission or default on the part of the Contractor, the SMC may, at its sole option,
make such payments and recover the same from the bills of the Contractor.
(42) INSPECTION OF SITE
The Contractor shall be deemed to have quoted after fully understand the nature of work to
be done under this contract and the Contractor shall also be deemed to have inspected the
Site of the Works and surroundings, the means of access thereto and to have generally
obtained its own information on all matters and things which can in any way influence its
tender. The Contractor shall also make itself familiar with the working conditions, accessibility
to site of works, availability of Labour and equipment and such other relevant conditions which
may affect the execution and completion of the work. No claim for any extra work or
otherwise will be allowed in consequence of any misunderstanding, error or incorrect
information on the above mentioned points or of any other inaccuracies in the reference
thereto which may appear on the drawings or in the specifications or other records nor shall
the contract be nullified in consequence of any such misunderstandings, incorrect information
or inaccuracies.
(43) CONTRACTOR’S SITE OFFICE & AMENITIES
The responsibility for providing any accommodation, feeding and sanitary necessities for the
workers employed by the Contractor shall be exclusively of the Contractor; SMC shall not
provide any site for that.
(44) IDENTIFICATION BADGES/PASSES
The Contractor shall provide to each of its employees, including labour, with the identification
badge at its cost and expense. The employees / labourers shall display the badges on their
person so that the badges are clearly visible for checking at all times by the security as they
enter and work in the premises of the SMC. The badges shall be printed, serially numbered
with an identification number and duly signed by the Contractor.
The Contractor shall immediately notify the SMC if any of the badges is lost and a new one
issued in its place, or when the badges are taken away by the discharged labour. No employee
/ worker of the Contractor without such badge will be permitted to enter and work in the
premises of SMC, except in such cases where special permission in writing, of the Engineer-in-
Charge is obtained.
(45) WATCHING AND LIGHTING
The Contractor shall at its own cost and expense provide watchmen at all the places of the
work wherever deemed necessary or required by the Engineer-in-Charge. The Contractor shall
also keep all open trenches, excavations or other dangerous places properly and sufficiently
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
lighted between sunset and sunrise and shall provide and fix proper fencing, hoardings or
temporary bridges to protect and assist the normal traffic. The Contractor shall also, at its own
cost and expense, erect temporary fences on the sites where required by the Engineer-in-
(46) COMPLIANCE WITH LOCAL LAWS, ETC.
The Contractor shall comply with all Acts, Rules, Bye-laws, Regulations and all other statutory
requirements of local or other Authorities having jurisdiction over the Site and shall be
responsible for the payment of all fees and other charges and giving and receiving of all
necessary notices, and keep the Engineer-in-Charge informed of the said compliance with such
Acts, Rules, Bye-laws, Regulations, statutory requirements, payments made, notices issued and
The Contractor shall be responsible for and shall pay any compensation to his workmen
payable under the workmen's compensation Act 1923 (VIII of 1923) of any statutory
modification thereof for injuries caused to workmen.
The contractor shall also arrange to obtain the license from the competent Authority under the
contractor labour (regulation and abolition) Act
No contractor shall employ any person who is under the age of 18 years. If any contractor
found employing person or persons under the age of 18 years, during execution of work at any
stage, legal actions shall be taken against him as stipulated in child labour (Prohibition &
Regulation) Act 1986 and also, a penalty of Rs. 20,000/- (Rupees Twenty thousand) shall be
imposed which shall be deposited with District Collector in child labour Rehabilitation cum
The contractor shall pay fair and reasonable wages to the workmen employed by him in the
contract undertaken by him in the event of any dispute arising between the contractor and his
workmen on the ground that the wages paid are not fair reasonable, the dispute shall be
referred without delay to the Executive Engineer who shall decide the same.
The decision of the Executive Engineer shall be conclusive and binding on the contractor but
such decisions shall not in any way affect the condition in the contract regarding the payment
to be made by the Municipal Corporation at the sanctioned tender rates.
(47) MATERIALS OBTAINED FROM EXCAVATION/DISMANTLING
All the useful materials, obtained from dismantling or demolition, and all fossils, coins, articles
of value, etc. which may be found, discovered during the execution of the works shall be
handed over to the SMC as directed at no extra cost to the SMC.
(48) INDEMNITY AND INSURANCE
The Contractor shall indemnify and keep indemnified both the SMC and against all losses and
claims for the injuries or damage to any person, or property whatsoever which may incur out
of or in consequence of the construction and maintenance of the Works and against all claims,
demands, proceedings, damages, costs, charges and expenses whatsoever in respect of or in
relation thereto.
The Contractor shall obtain, at its cost and expense, an Insurance Policy in the joint names of
the SMC and the Contractor, covering the following risks and lodge the Policy with the SMC
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Works including temporary / permanent structures, equipment, tools etc. at site against the
damage by fire, burglary, strikes, riots and civil commotion and natural calamities like floods,
earthquake, explosion, etc.
The workmen / workers employed by the Contractor against the Workmen Compensation Act
and other statutory Laws where the compensation is payable by the Contractor;
Damages to the property of third parties including the neighbouring buildings, equipment etc.
Damages to third parties including the staff, visitors, neighbours and other passer-by of the
SMC against any claim that may arise due to accidents, on account of the incidental risks,
which may occur during the execution of Works.
All claims/ amounts against the policy shall be payable to the SMC and not to the Contractor.
The Contractor shall keep the policy renewed from time to time until the Certificate for
Completion of works is issued by the SMC. If at any time the policy so obtained and kept with
the SMC expires, it shall be lawful for the SMC to stop further payments until the duly renewed
policy is lodged with the SMC.
In case of, damage to the property such as equipments, machineries, instruments, buildings,
and other assets etc., the claims once remitted to the SMC by any insurance company, the
same will be disbursed in favour of contractor after rectifying such damage to the satisfaction
of engineer in charge. In case of damage to labours, or any other persons, contractor shall
compensate to the concern labours or any other persons till then SMC will retain the amount
equal to compensation to be made, from the RA bills. After producing the authentic proof of
compensation and clearance from the labour office where ever applicable, the retained
amount of contractor shall compensate to the concern labours or any other persons till then
SMC will retain the amount equal to compensation to be made from the RA bills. After
producing the authentic proof of compensation and clearance from the labour office where
ever applicable, the retained amount shall be released to the contractor.
The contractor shall take “Workman compensation policy” for all workers and labours of
contractor and clients working at site and “Third party insurance policy” to fully cover all third-
party type risk. The insurance policy so taken by the contractor for such purpose shall be in the
joint name of the contractor and the client and the policy shall be deposited with the SMC.
TRANSIT INSURANCE
The Contractor shall arrange at his cost for transit insurance for the dispatch of Material/
equipment or parts thereof.
(49) ACCESS TO THE SITE
During the progress of the Work, the Contractor shall keep the site reasonably free from all
unnecessary obstructions. The existing roads or water courses or pipes, electrical line and
conduits shall not be blocked, cut through, altered, diverted or obstructed in any way by the
Contractor, except with the permission of the Engineer-in-Charge in writing.
All operations necessary for the execution of work and for construction of any temporary work
shall, so far as compliance with the requirements of the Contract permits, be carried on so as
not to interfere unnecessarily or improperly with the convenience of the public or access to
the use and occupation of public or private road, including approach roads from the main road
and footpaths, and of properties whether in the possession of the SMC or any other person /
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
All compensation claimed for any unauthorized closure, cutting through, alteration, diversion
or obstruction to such roads or internal plant piping, etc. against the contractor or his agent or
his staff shall be recoverable from the Contractor by deduction from any sums which may
become due in terms of the Contract or otherwise according to Law.
(50) SETTING-OUT OF WORKS
The Contractor shall be responsible for the perfect setting out of the Works and for
correctness of the positions, levels, dimensions and alignment of all parts of the works. All
measurements shall comply with the dimension noted on the drawings and or as directed. If at
any time during the progress of work, any error appear or arise in the positions, levels,
dimensions or alignments of any part of the Work, the Contractor, on being required to do so
by the Engineer-in-Charge, shall at his own cost and expense rectify such errors to the
satisfaction of the Engineer-in-Charge notwithstanding that he may have been assisted by the
Engineer-in-Charge in setting out the same earlier.
(51) CARE OF WORKS
In the event of any accident or failure occurring or being likely to occur in or on the works
which, in the opinion of the Engineer-in-Charge, required immediate attention either during
the work period or the defect liability period, the Engineer-in-Charge may direct the Contractor
by written notice to take necessary remedial action and if the Contractor fails to take action as
directed by the Engineer-in-Charge within 7 days of such notice, the SMC and / or the
Engineer-in-Charge may, by its own workmen or employing any other agency, make the
necessary repairs or precautionary works and recover the costs from the Contractor.
(52) VARIATIONS IN THE SCOPE OF WORK
The SMC shall have the power to make any alterations/variations/ deletions/additions or
substitutions from drawings, specifications, designs and instructions that may appear in its
opinion, be necessary or advisable during the progress of the Works and the Contractor shall
be bound to carry out the work in accordance with the instructions which may be given to him
by the SMC in writing. Such alterations / deletions / additions or substitutions shall form part
of and be read as incorporated in the Agreement itself.
(53) DISPUTES AND JURISDICTION
Except where otherwise specified in the contact the decision of the commissioner shall be
final, conclusive and binding on all parties to the contact upon all questions relating to the
meaning of the terms, conditions, specifications, drawings, designs and instructions
hereinbefore mentioned and as to the quality of workmanship, or materials used on the work,
or as to any other question, claim, right, matter, or thing whatsoever in any way arising aloof,
or relating to the contract, designs, drawings, specifications, estimates, instructions, orders or
these conditions, or otherwise concerning the works or the execution or failure to execute the
same, whether arising, during the progress of the work or after the completion or
abandonment thereof.
(54) LEGAL COSTS
Legal Costs incurred by the SMC in the event of litigation or other legal proceedings arising
from this Contract agreement shall be borne by the Contractor.
This tender document contains technical bid and price bid, forwarding letter and other
documents like Tender Fees, EMD, Addenda / Corrigendum, Registration copy, Authorization,
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Company Profile, Experience Certificates/List of clients along with Technical data, catalogues,
performance curves, Annexures & Data sheet of Technical Bid, other Technical and General
Specifications should be furnished duly filled in and signed. No pages can be removed from the
conditions of contract, specification of drawings, otherwise it will be considered as an
intentional fault and bidders will be liable for rejection and the amount of earnest money
deposit forfeited.
(55) RESPONSIBILITY OF CONTRACTOR UNDER CONSTRUCTION AND DEMOLITION WASTE (C & D
WASTE) RULES 2016:
1. Contractor shall remove all construction and demolition waste (C & D Waste) and clean the
area every day, or depending upon (1) The type & schedule of work. (2) The quality and type of
waste generated, appropriate storage and collection facility shall be developed at site.
Reasonable timeframe shall be worked out in consultation with engineer in charge of the
project, for storage & usage of C & D Waste.
2. If it’s found that contractor is irregular and showing negligence to management of C & D
Waste, then if deem fit, Engineer in charge would arrange to dispose the said C & D Waste
through an Authorized C & D Waste Contractor/agency of Surat Municipal Corporation and All
expenditure made towards disposal of this C & D Waste shall be recovered from the contractor
as per the prevailing charges.
3. Contractor shall have to bear the expenses towards management of C & D Waste as per the
prevailing norms; no extra payment shall be entertained for the same.
4. Contractor shall keep record of the generation and disposal of Construction and Demolition
waste(C & D Waste) and proof of its disposal as per the provision of C & D Waste rules and he
has to submit along with running bills.
5. If contractor fails to upkeep and maintain records of C & D Waste generation Disposal records
etc. than it shall be calculated as per the provision of the Standing Committee Resolution no
1621/2016, Dt.01/10/2016 and charges shall be recovered from due of contractor with Surat
Municipal Corporation.
6. Contractor shall also ensure use of recycled product made from SMC authorized C & D Waste
agency as far as possible to promote the C & D Waste management project.
(56) ALL CLAUSES ARE OF GENERAL IN NATURE; BIDDER/ CONTRACTOR MUST FOLLOW;
WHICHEVER IS / ARE APPLICABLE FOR WORK UNDER CONSIDERATION.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
CONDITIONS ABOUT THE EXECUTION OF WORK: -
(1) Bidders must make his own arrangement for watch and ward of material supplied till it is
commissioned satisfactorily at site and handed over to the corporation. Corporation will not be
responsible for theft of materials till it is commissioned satisfactorily and handed over to the
corporation even if part payment is released.
(2) All equipment/ materials/ accessories are to be supplied by contractor and to be erected by
contractor. No tools-tackles/ machinery/ manpower will be provided by the Corporation. No
change in units shall be allowed.
(3) Entire CCMS feeder pillar installation with methodology shall have to be got approved before
commencement of actual work on site. Map/ installation drawing needs to be provided with
actual work done/ quantities of materials/ equipment supplied/ installed with table after
(4) The supply shall be done during working days between 8.00 A.M. to 6.00 P.M. only. If the
contractor intends to work on holidays or outside working hours specified, he shall take prior
written permission from Engineer in charge/ Zonal officers.
(5) After completion of job, contractor shall submit the test reports, wiring diagram, complete
installation in as built drawings etc. All these shall be printed and bound in book form.
Payment shall be released only on receipt of this volume.
(6) Any damage to any service or accident in carrying out the works pertaining to this contract
shall be to contractor’s account.
(7) On completion, all work must be cleaned down; rubbish removed and the works and land
cleaned of rubbish; surplus materials and other accumulations, and everything left in a clean
and ordinary condition.
(8) The contractor shall provide, erect and maintain proper sheds and temporary buildings for the
storage and protection of materials and goods and for the execution of work which may be
fabricated or brought on the site.
(9) The contractor shall permit the execution of the work not provided for in the tender by artists;
tradesman, or others engaged by the Municipal Corporation. The contractor shall allow all
reasonable facilities and the use of his scaffolding and water for the execution of such work,
but is not required to provide any special scaffolding for the execution of such work except by
special arrangement with Municipal Corporation.
(10) All works to be executed under the control shall be executed under the directions and subject
to the approval in the respects of the Executive Engineer who shall be entitled to direct at
what point or points and in what manner they are to be commenced, and from time to time
(11) SAFETY REGULATIONS
[I] During the execution of the work, unless otherwise specified, the contractor shall at its
own cost and expense provide the materials for all shoring, timbering and shuttering
work necessary for the stability, safety and construction of all structures, excavations
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
and works and shall ensure that no damage, injury or loss is caused or is likely to be
caused to any person or property.
[II] The Contractor shall be responsible to take all precautions to ensure the safety of the
person or property whether on public or works site during the period of contract and
shall post such look out personnel as may, in the opinion of the Engineer-in-Charge, be
[III] The Contractor shall assure the safety of the work and personnel and contractor shall be
entirely responsible for any damage or injuries to any property or person resulting from
any accident due to any reasons.
[IV] The Contractor must take sufficient care while moving, handling and installing
material/equipment, so as not to cause any injury or damage to the persons or property
of the SMC or the public or other working in or around the works. In case of causing of
any injury or damage, to any person or property as aforesaid, the costs and expense of
such occurrences, including eventual loss of working hours as estimated by the SMC,
shall be borne by the Contractor. The Contractor shall also replace or repair all the
damages caused to buildings or Material/equipments left at the time of the completion
of the work to bring the building or Material/equipment back to the original condition.
[V] The Contractor shall, at its cost and expense, provide all the necessary facilities such as
ladders, tools & tackles, railing, platform, inspection lamps, safety ropes, etc., for
providing the safe working conditions to its or sub-contractor’s workmen/workers and
also for the inspection of the works by the authorized officials under the contract.
[VI] In any case of dismantling or demolition or otherwise the Contractor shall take necessary
care not to damage the existing structure, equipment or materials while executing the
works, and any damage, if caused on account of the same, shall be rectified or repaired
by the contractor at its own cost and expense in restoring the structure or materials to
its original condition.
(12) EXECUTION OF THE WORKS
The whole erection and installation work shall be done in supervision of electrical
supervisor/ engineer-in-charge. No work including erection/ installation shall be between
8.00 to 17.00 hours with 1.00 hour of recess in between or on Sunday or Government
holidays, except with the special sanction of the Engineer in writing previously obtained, and
the withholding of such sanction shall be no ground of complaint on the part of contractors
of cause for compensation to them. The period within which the work has to be carried on
and completed has been fixed in terms of this cause with the provision that the total number
of hours of work permissible shall not exceed 48 hour in a week and in no case more than
hours on any working day the actual times within which the said hour shall be worked being
subject to mutual arrangement with the contractors at the commencement of the work or
from time to time as may be required and provided that for the one hour about mid-day
exclusively of the permissible hours aforesaid for work, all works shall be stopped for raft and
modes though sanction may be accorded to the contractor to work on days and at times
otherwise, normally non-permissible under this contract, the contractors shall be required to
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
bear the cost of such supervision as in the opening of the engineer-may be necessary at these
times It should be distinctly understood that the granting of permission to work extra hours or
to work on Sundays and Holidays will be entirely at the discretion of the Engineer and cannot
be claimed by the contractors as a matter of right and the refusal to grant such permission will
not be set up as a ground or for not completing the work within the contract period.
If on the other hand the Engineer requires that the work shall be proceeded with on days and
at times otherwise normally non-permissible under this contract the contractors shall proceed
with the work but they will not be required in such cases to bear the cost of the Municipal
establishment employed at the time. A six hours work at night will be considered as equal to
day’s work. Such number of days and hours as may be worked under these exceptions will be
takes into account in determining the contract period fixed for completion of the works.
The contractors at all times during the continuance this contract shall in all their dealings with
local labour for the time being employee on the works contemplated by this contract have due
regards to all local festivals and religious or other customs and all disputes, matters and
questions arising between the contractors and any of their Agents on the hand and any local
labour on the other hand with respect of any matter or thing in any way connected with this
contract shall be decided by the Commissioner whose decision shall be final and binding on all
The contractor shall not enter upon or commence any portion of work except with the
authority and instructions of the Engineer-in-Charge or of his subordinate in charge of the
work failing such authority the contractor shall have no claim to ask for measurements of or
payment for work.
THE CORPORATION MAY DO PART OF THE WORK
Upon failure of the Contractor to comply with any instructions given in accordance with the
provisions of this contract, the Corporation has the alternative right, instead of assuming
charge of entire work to place additional labour force, tools, equipments and materials on such
parts of the works, as the Corporation may designate or also engage another Contractor to
carry out the work. In such cases, the Corporation shall deduct from the amount which
otherwise becomes due to the Contractor, the cost of such work and materials with 10%
added to overall departmental charges and should the total amount thereof exceed the
added to overall departmental charges and should the total amount thereof exceed the
amount due to the Contractor, the Contractor shall pay the difference to the Corporation.
Contractor to note that SMC shall appoint Project Management Agency/ Third Party Agency
for the supervision/ inspection of the work and they have to work under them.
(13) WORKMANSHIP
The work to be done under the contract or any part thereof shall be executed in the best and
most skilled workmanship like manner, with best and approved quality of equipment and both
the work and the material/equipment should conform to the particulars contained in or
implied by the specifications and as referred to in the drawings or in such other additional
directions, instructions and documents as may be found necessary and given time to time to
the contractor during the execution of the works and to the entire satisfaction of the SMC and
the Engineer-in-Charge.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
The entire work shall conform to the latest and acceptable engineering practices and shall be
such as to cause minimum transfer of noise and vibration to the building structures.
(14) REMOVAL OF IMPROPER WORK AND MATERIAL/ EQUIPMENT
The SMC shall have power to check and reject at any stage such work / equipment which it
considers to be defective in quality or workmanship and nothing shall prevent from rejecting
the materials brought to the site (i.e. materials made ready for use on works) which has been
previously passed by the SMC or the Engineer-in-charge in an un-worked condition. The
Contractor shall immediately arrange to replace the defective equipment by proper and
suitable equipment with the approval of the Engineer-in-Charge and carry out rework of the
rejected work at his own cost and expense and to the satisfaction of the SMC. In the event of
failure on the part of the Contractor to carry out his obligations under this clause, the SMC
shall have the right to get the work done through other agencies at the risk of the Contractor
and recover the cost in full from the Contractor.
All rejected Material/equipments will at once be removed from the site by the Contractor to
such distances as may be desired, failing which the Engineer-in-Charge after giving three days’
notice in writing may do so and recommend to the SMC for recovering the cost of removal
from the Contractor.
(15) URGENT WORKS
If any urgent work (in respect whereof the decision of the SMC shall be final and binding)
becomes necessary for safety of the work or personnel and the Contractor is unable or
unwilling to carry it out, the Engineer-in-Charge shall have right to employ outside labour. All
expenses incurred on it shall be recoverable from any sum payable to the Contractor.
(16) CLEARANCE OF SITE ON COMPLETION
As part of the work included in this Contract, the Contractor shall completely remove and
satisfactorily dispose “off” all temporary works to the extent directed. He shall demolish and
dispose of all temporary structure, shall remove or grade to the extent directed all
embankments made for erection purposes, shall satisfactorily dispose “off” all rubbish
resulting from the operations under this Contract and shall do all the work necessary to restore
the territory embraced within the site of his operations to at least as good order and
conditions as at the beginning of the work under this Contract.
No final payment in settlement of the accounts for the Works will become due and shall be
made to the Contractor till, in addition to any other conditions necessary for such final
payment, Site clearance has been affected by him. In the event of his failure to comply this
provision within fourteen (14) days after receiving notice to that effect, such clearance may be
made by the Engineer-in-Charge at the cost and expense of the Contractor. In the event, it
become necessary for the Engineer-in-Charge to have the Site cleared at the cost and expense
of the Contractor, the SMC shall not be held liable for any loss or damage to the Contractor’s
property as may be made on the site and due to such removal there from.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
(17) EXTRA WORK
Work that is not included in the tender documents shall not be performed, except when
approved/sanctioned in writing by S.M.C.
Rates for additions or extras
Any additional item of work over and above those schedules in the tender are to be carried out
at the same basic rates as quoted in the tender for the same type of work.
Rate for extra items, as far as possible will be derived from the quoted tender items where it is
not possible to do so, the same shall be arrived at by adding 15 % towards overhead and
profits on the actual cost of labour, material and plant and machinery input as approved by
Engineer-in-Charge.
No claim for any extra or compensation for damage will be entertained on account of such
variation, except where the quantity is increased by more than 30%.
No claim for any extra or compensation for damage will be entertained on account of such
variation where the quantity is decreased to any percentage or where the item is totally
Before payment of final bill on completion of the work, total amount of that work done at
Before payment of final bill on completion of the work, total amount of that work done at
sanctioned rate shall be considered with the total amount of work done, had it been executed
sanctioned rate shall be considered with the total amount of work done, had it been executed
at the rate of second tenderer. While comparing total amount, quantity to be taken into
at the rate of second tenderer. While comparing total amount, quantity to be taken into
consideration will be the quantity executed and not the quantity put to tender and will also
include variation of quantity within the limits of quantity executed as per clause i.e. 30% of the
estimated quantity.
(18) EXTENT OF DEVIATION OR VARIATION
The Contractor is not to vary / deviate from the approved scheme, its drawings and
specifications or instructions or execute any extra work of any kind whatsoever unless upon an
order in writing is given by the SMC in this regard. If compliance with the SMC’s aforesaid
order or approval involves extra work, and/or expense beyond that involved in the execution
of the works as per contract, then unless the same were issued in consequence of some breach
of this contract on the part of the Contractor, the latter shall be paid the price of the said work
(to be valued as hereinafter provided) and/or the expense aforesaid.
(19) MODIFICATIONS TO THE CONTRACT
There are no other understandings between the parties other than this Contract Document.
In the event of any of the provisions of the Contract require modifications after the Contract
Documents have been signed, except those directions and orders given by the SMC under the
Contract for the due execution of the works, the modifications shall be made in writing and
signed by both the parties before giving effect to such modifications.
(20) COMMENCEMENT OF WORKS
The Contractor, having signed the Contract with the SMC, shall commence the work within the
period stipulated in the document.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
The Engineer-in-Charge may direct the Contractor to use so much of the site as may, in the
Engineer-in-Charge’s opinion, be required in order to enable the Contractor to commence and
continue the work and shall from time to time, as the work proceeds, give the Contractor the
use of such further portions of the site as the Engineer-in-Charge may from time to time
consider proper and adequate in that regard. Phased delivery in the manner aforesaid of the
use of site or any other facilities to be afforded to the Contractor shall not entitle the
Contractor to any claims whatsoever.
If the Contractor commits default in commencing the execution of the work as aforesaid, the
SMC shall, without prejudice to any other right or remedy, be at liberty to forfeit the Earnest
Money Deposit absolutely.
WARRANTY FOR MATERIAL/EQUIPMENT
With respect to the Material/equipments provided by the contractor under this contract, the
contractor shall be deemed to have furnished to the SMC.
“The Contractor warrants that the Material/equipments are not subject to any security
interest, lien or other encumbrance”
Against Patent Infringements
“The Contractor shall at his own expenses defend and save the SMC harmless from the
expenses and consequences of any suit or procedure brought against the user so far as the
said suit or procedure is based on a claim that the equipment provided constitute an
infringement of any patent in existence on the date of the contract”.
“In addition, the Contractor shall secure at his own expense a fully paid up license or license
that will permit the user to continue operation of the equipments provided, free of further
claim for infringement”.
“The Contractor warrants that the equipment provided are suitable for the purpose or the
purposes, for which such goods are used, conform to promise or affirmations made by the
contractor and conform to specifications stipulated in the Contract”.
“The Contractor warrants that the equipments provided are suitable for the particular purpose
stipulated in the contract. The SMC affirm that it has relied on the contract’s skills and
judgments to select or provide equipment for a particular purpose”.
“The Contractor warrants that the equipments are new and of best quality and that the
equipment will be free of defects in design, workmanship or materials”.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
BREACH OF WARRANTY
In the event of a breach of warranty, the contractor shall be required to take all necessary
action at his cost and expense to correct the breach in the most expeditious manner dictated
by the existing circumstances.
Upon oral or written notification of defects or malfunctioning of equipment during normal
operation, which requires corrective action, the Contractor shall send the necessary personnel
with the required materials, tools, test equipment and such other items to site to supervise
and assume responsibility for repair. If the Contractor does not expeditiously take steps to
correct the defects, the Engineer-in-Charge may at its option do so. However, such action on
the Engineer-in-Charge’s part, will not release the Contractor of his responsibility and the
Contractor inter-alia shall reimburse all the expenses incurred by the Engineer-in-Charge to
repair or replace malfunctioning or non-conforming equipment.
(22) MAINTENANCE AND DEFECTS
AFTER SALES SERVICE
The Contractor shall ensure that adequate and prompt after sales service in the form of
maintenance personnel and spares as and when required with a view to minimize the
breakdown period. Particular attention shall be given to ensure that all spares are easily
available during the normal life of the equipment.
(23) CONTRACTOR TO MAKE FACILITIES AT SITE
The Contractor shall make temporary arrangements at his own cost and expense for any
approaches/accesses required for the movement of men and materials to his working places
and material yard. If directed by the Engineer-in-Charge, the Contractor shall remove and
make good temporary arrangements after completion of the works.
(24) The contractor shall not enter upon or commence any portion of work except with the written
authority and instructions of the Engineer-in-charge or of his subordinate in charge of the work
failing such authority the contractor shall have no claim to ask for measurements for payment
(25) Disputes if any shall be discussed and mutually settled and in case of disagreement the same
shall be referred to Commissioner/ Standing Committee. After referring to Commissioner/
Standing Committee if the said dispute is not solved, the same shall be referred to the court
subject to Surat Jurisdiction only.
(26) ALL CLAUSES ARE OF GENERAL IN NATURE; BIDDER/ CONTRACTOR MUST FOLLOW;
WHICHEVER IS/ ARE APPLICABLE FOR WORK UNDER CONSIDERATION.
(27) TERMINATION FOR UNSATISFACTORY PERFORMANCE
If the corporation considers that the performance of the contractor is unsatisfactory or not up
to the expected standard, the corporation shall notify the contractor in writing and specify in
detail the cause of dissatisfaction. The corporation shall have the option to handover this work
to other agency(ies) at risk &cost of the contractor and terminate this contract if the
contractor fails to comply with the requisition contained in the said written notice issued by
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
the corporation to the contractor within fifteen days of the receipt thereof. Decision of the
competent authority shall be final regarding deduction of performance guarantee or release
the performance guarantee.
Any other details, if required can be obtained from the office of the Concern
department/authority, on request and prior to submitting the tender. No dispute at a later
date shall be entertained.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
SPECIFICATIONS ,TESTING & INSPECTION: -
Bidder may offer make & model of the CCMS
(1) APPROVAL OF CCMS FOR PRIMARY QUALIFICATION OF USAGE:
a. All details/ documents/ certificates pertaining to CCMS must be furnished.
b. All technical parameters must be matched with the specifications of the tender.
(i) Bidders shall give notice of two weeks to the Engineer-in-charge who may depute
his representatives at his option to witness for inspection.
(ii) All inspection call must be placed on manufacturer’s letter by authorized signatory
duly stamped, clearly indicating qty. offered for inspection and evidence of
readiness of materials. Sales / marketing / irrelevant department’s letter will not
(iii) It shall however, be the bidder's responsibility to supply all materials as per
specifications, standards mentioned herein and inspection by the clients does not
relieve the contractor form his all obligations.
(iv) Bidder has to arrange for air travel ticket (if required), railway ticket, minimum two
tier A.C., transportation, lodging and boarding and any other relevant expense for
the team of Surat Municipal Corporation which may consist maximum 2 personals.
Bidder has to quote appropriately for the same in price bid on per visit (across
(v) If, first testing, on any ground fails and, retesting is required, in such case, entire
expenditure for retesting shall be in bidder’s account.
(2) PACKING, MARKING, PROTECTION AND DISPATCH OF EQUIPMENT
The Contractor shall be held liable for all damages or breakages to the material/equipment
due to the defective or insufficient packing as well as for corrosion due to insufficient
The Contractor shall arrange for dispatch of the Material/equipment by rail/road/ship after
proper packing protection. The consignments shall be dispatched after inspection or
otherwise, if agreed to, on freight paid basis, irrespective of the basis of price.
(3) PERFORMANCE TESTING OF CCMS :
In case of unsatisfactory performance necessary remedial actions must be taken by the
contractor including complete replacement of components/ spares without any extra cost to
All the material/equipment/accessories should be supplied with manufacturer's test
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
CONDITIONS REGARDING GUARANTEE/ WARRANTY, SECURITY DEPOSIT/ PERFORMANCE
(1) The successful contractor shall be required to deposit an amount equal to 2.0% of the total order
value as Security Deposit as mentioned elsewhere in the tender document. If security deposit in
form of FDR, the Bidder shall have to become the contract agreement on non–judicial Gujarat
stamp paper of amount of 4.92% or Prevailing amendment of Government or norms of
government for security deposit amount.
(2) The material / equipment offered by the bidders must carry an un-conditional guarantee of
minimum one year from date of commissioning. The amount of performance guarantee shall be
retained till expiry of satisfactory guarantee period. During the defect liability period, all necessary
spare(s)/ material(s) required will be supplied / arranged by contractor.
(3) During defect liability period, if any spare(s) / material(s) found defective than same should be
repaired or new spare(s) / material(s) is to be replaced. In no case second hand / used material /
equipment wouldn’t be allowed.
(4) Defect liability period will be 12 months from the date of satisfactory commissioning. After
successful commissioning, entire system shall be handed over to O & M Contractor of the
respective Zone / Sub Zone. However, spares / components of streetlight system under the defect
liability period shall be provided by the contractor, who has installed the system. Therefore, the
rates must be quoted accordingly and no dispute will be entertained at later date.
(5) If, contractor fails to supply required spares of any component within five days of intimation then,
following penalty shall be charged and recovered from his pending bills / security deposit or from
any other pending amount / any other works in SMC.
(a) NO penalty shall be levied, If contractor supply spares for any component of system within
(b) If contractor supply on sixth day, penalty for first five days will be Rs.100.00 per day.
(c) For sixth to ten days, penalty will be Rs.200.00 per day.
(d) Above penalty shall be recovered on per complaint basis.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
PAYMENT & PENALTY TERMS & CONDITIONS: -
(1) No payment shall be made in advance. The Corporation shall not under any circumstances
relax the terms of payment and will not consider any alternative terms of payment. Bidders
should therefore in their own interest note this provision to avoid rejection of their tender.
(2) All payments shall be made as per prevailing rules/regulations of SMC.
(3) During the course of execution of Contract, if there is any change in rate of GST (GOODS &
SERVICE TAX) by the Government the same shall be reimbursed/ recovered separately by SMC,
subject to the submission of original Receipt/ Proof for the amount actually remitted by the
successful bidder/ Contractor to the competent Authority along with a certificate from
chartered Accountant of Contractor/ Successful Bidder certifying that the amount of GST paid
to the Government and the same shall be intimated/ submitted/ claimed within 30 (Thirty)
Days from the sole responsibility of the Successful bidder/ Contractor, failing which, SMC may
recover the amount due, from any other payable dues with SMC. Further the non-payment of
the GST to the Government may lead to the termination of contract and forfeiture of Security
Deposit/ Performance Guarantee Amount.
(4) TDS of GST shall be deducted as per the act/rules from the bills of the contractor.
(5) The corporation shall not accept advance payment term. All payments are subject to income
tax, construction cess, GST etc. at source as per prevailing rules. All payments shall be made by
A/C Payee cheque of any schedule bank Surat branch only or as per prevailing rules/
regulations of SMC.
(6) The work must be completed in all respect within stipulated time period as mentioned in
Important instruction to bidder, failing which penalty @ 0.2% of order value of unexecuted
portion per day of delay subject to maximum 10% of order value shall be charged and shall be
deducted from the bill or any outstanding payment. Also, if contractor fails to execute the
work than action against contractor will be taken as per decision of competent authority of
SMC and that should bind to contractor.
(7) The Contractor shall be liable to the payment of all the Central/ State/ Local Body's Levies,
taxes or duties etc. The SMC shall neither bear it nor reimburse at any time but will ensure
deduction of Central/ State/ Local levies and taxes at Source at the rate provided under the
relevant statutes from time to time in force. Further the work contract tax or sale tax shall be
borne by the Contractor as per Rules and Regulations of Government.
(8) Any increase or decrease in taxes/ duties or imposition of any new taxes/ duties shall be on
account to the Corporation and such increase/ decrease shall be paid/ recovered to/ from the
Contractor on producing documentary evidences only. The contractor shall be the sole
responsible for payment of such incidentals to the concerned Government department which
he has collected from the Corporation. This provision is limited for Schedule-B of the tender.
(9) As per government G.R. Building and other construction work welfare cess act-1966 labour and
employment development G.R. No.CWA/ 2004/ 841/ M-3, Dt-30/01/2006 contractor shall
have to pay 1% cess on every bill amount.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
(10) Quantities shown in the tender are approximate and no claim shall be entertained for
quantities of work executed being either more or less than those mentioned in the tender.
(11) Seven percent (2% + 5%) shall be retained from every running bill as retention money and
shall be released in Final Bill, after of satisfactorily completion of SETC work.
(12) Security deposit shall be released after final takeover of the installation after expiry of defect
liability period as well as satisfactory clearance from Audit department.
(13) In case site access is not available within the date of completion of work than 5% of
sanctioned value shall be released against submission of a Bank Guarantee for equivalent
(14) Further, if in another three-month, site access is still not available further 5% of quoted value
shall be released against submission of a Bank Guarantee of equivalent amount.
(15) The contractor shall have to submit bill in duplicate along with documents as mentioned
elsewhere in this tender document for the activities completed. The payment should be made
as per the actual work done and actual measurement of each item done on site.
(16) TERMS OF PAYMENTS:
[ A ] 70% of equipment(s) quoted value after satisfactory delivery/ acceptance of material
and after, submission of invoice.
[ B ] 25% of equipment(s) quoted value after satisfactory commissioning of all the
equipments and after, submission of invoice.
[ C ] Remaining 5% of equipment(s) quoted value after satisfactory completion of whole work
in all respects as a final bill.
Recoveries shall be made from the above payments as per provisions made in various
conditions, clauses, terms etc., in the tender documents and other dues from the Contractor.
Receipt for payments made on account of any work when executed by a firm, should also be
signed by all the partners, except where the contractors are described in their tender as a firm
in which case the receipts shall be signed in the name of the firm by one of the partners, or by
some other person having authority to give effectual receipt for the firm.
(17) SCHEDULE OF QUANTITIES AND RATES/ PRICE
The Contractor shall neither be entitled for any revision of price owing to variations in actual
quantities of work nor be entitled to any loss of consequential profits or for any other damages
arising thereof. The Contractor shall be paid only for the actual quantities of work executed
and according to the price or unit rates agreed to.
The price or unit rates agreed to under this contract shall be for the finished works (except to
the extent specifically excluded) and shall be inclusive of all equipment, accessories, hard
wares, fabrication works, support structures, tools and plant, transport, labour, hoisting,
setting and fixing and including all royalties, taxes and duties, etc. and shall remain firm and
free from any variations arising from the cost of materials, labour, equipment, etc.
The price or unit rates agreed to under this contract shall be deemed to compensate for all
minor details, which are not specifically mentioned, but are fairly and obviously intended
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
andare essential for the full and final completion of the works. Further, the Contractor is not
entitled to make any extra claims for such works, if any.
If the Contractor or his workmen; or servants shall break, deface injure or destroy any part of a
building in which they may be working, or any building, road, fence enclosure or grass land or
cultivated ground continuous to the premises on which the work of any part thereof is being
executed, or if any damage shall be done to the work for any cause whatever while it is in
progress of if any imperfection becomes apparent in it within the Defect liability period
mentioned above by the Engineer-in-Charge the contractor shall make good the same at his
own expense, or in default the Engineer-in-Charge may cause the same to be made good by
other workmen and deduct the expenses (of which certificate of the Engineer-in-Charge shall
be final) from any sum that may be due or thereafter becomes due to the contractor, or from
his security deposit or the proceeds of sale thereof or of a sufficient portion thereof.
Compensation for all damage done intentionally or unintentionally or by the Contractor's
labourers whether in or beyond the limits of the Municipal Property shall be estimated by the
Engineer-in-Charge or such other office as he may appoint and estimates of the Engineer-in-
Charge subject to the decision of the Commissioner on appeal be final and the contractor shall
be bound to pay the amount of the assessed compensation on demand failing which the same
will be recovered from the Contractor as damage from the security deposit or deducted by the
Engineer-in-Charge from any sum that may be due or become due from the Municipal
Corporation to the contractor under this contract of otherwise.
The contractor shall bear the expenses of defending any action or other legal proceedings that
may be brought by any person from injury sustained by him owing to negligence of
precautions to prevent the spread of fire and he shall also pay any damages and cost that may
be awarded by the court in consequence.
(18) PAYMENT AT REDUCED RATE
The rates for several items of the work agreed shall be valid only when the item concerned is
accepted as having been completed fully in accordance with the sanctioned specifications. In
cases, where the items of works are not accepted, the Engineer-in- charge may make payment
on account of such items at such reduced rates as he may consider reasonable in the
preparation of final or on account bills.
(19) FINAL PAYMENT
The final bill shall invariably be preceded by a thorough assessment of the entire work
performed by the Contractor. The Contractor shall submit the final bill for the works within
one (1) month of such final assessment. The bill shall be based only on the works as assessed
and at the accepted tender rates, including rates for any additional or extra work which might
have been sanctioned by the SMC. All the deductions due under the Contract shall be adjusted
accordingly in the final payment.
(20) NO ESCALATION PAYABLE FOR WAGES AND MATERIALS
No payments to the Contractor on account of escalation of rates of equipment, materials,
wages, fluctuation in foreign exchange rate, etc., are admissible. The Contractor is supposed to
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
foresee all statutory /other escalations which may be taken into account while quoting the
rates in the tender. However, the Contractor as notified by the Government shall pay the
minimum wages payable to the labour as per Minimum Wages Act from time to time during
the execution of the project. Any payment made over and above the specified minimum wages
shall be on Contractor‘s account and the SMC shall not be liable to account for the same. In
case of imported equipment any possible increase in custom duties, CVD, etc., shall also be
foreseen and absorbed by the Contractor.
Income Tax on gross amount billed by the Contractor, as per prevailing statutory rules will be
deducted as per Section 194(c) of Income Tax Act.
CONSTRUCTION CESS
Construction Cess on gross amount billed by the Contractor, as per prevailing statutory rules
will be deducted as per Labour & employment development GR No.CWA/2004/841/M-3, Date:
- 30/01/2006 of Gujarat Government.
Applicable GST TDS will be deducted as per prevailing act(s)/ rule(s)/ notification(s).
(22) RELEASE OF SECURITY DEPOSIT ACCORDING TO WORK DONE
In case the total amount of work done is less than 5% of the contract value, prorate S.D. to that
In case the total amount of work done is less than 5% of the contract value, prorate S.D. to that
extent may be refunded to the contractor while releasing the payment of final bill. In soft, the
S.D. to be retained by the Corporation after payment of final bill shall be equal to 2% of the
amount of final bill as per the prevailing norms or as per the norms decided from time to time.
If there is increase in amount of work more than 5% of the contact value. The Additional S.D.
shall be recovered from the running bill. When the total of any of work done by the contractor
up to running bills under consideration is more than 5% of the contact value. However, such
S.D. shall be recovered in the round figure of Rs.1,000.00 i.e. the amount of work done when it
exceeds 5% of the contract value it shall be refunded of to the nearest multiple of Rs.
25,000.00 such additional S.D. shall be recovered for the works amount to Rs. 5/- Lakh or more
at the rate of 4% of the additional amount.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
DETAILED TECHNICAL SPECIFICATIONS
ø SINGLE PHASE IOT CCMS STREETLIGHT CONTROL PANEL
Smart 4G Timer, Supply of IoT based 4G Smart Streetlight Control & Monitoring System having a Smart
Panel comprising of 1 Phase IoT Streetlight Smart 4G Timer with 16x2 LCD to display RSSI, relay status,
RTC time & diagnostics., Controller with 8-hour battery backup during external power failure. External
power failure alert immediately to cloud., 110-630 V AC @ 50-60 Hz – 1 phase operating range.,
Standby power consumption <3W., Smart 4G Timer with RS232 port for DLMS Energy meter., Smart 4G
Timer must be compatible with any make / brand of DLMS (RS232) Energy Meter., DI: 2 Nos. (1
Contactor / Latch detection, 1 for Door Sensor.)., DO: 1 Relay for control with 1 extra spare relay.,
Smart 4G Timer with dual SIM functionality for connectivity backup., 4G M2M SIM 3-Year
communication included., Local configuration via WiFi / BLE for maintenance or during force majeure.,
GPS chip inbuilt of Smart 4G Timer for auto location tracking & astronomic schedule location.,
programmable schedules., Astronomic scheduling with monthly offsets.,
Smart 4G Timer has inbuilt timer stores schedules locally & also stores schedule execution logs locally,
syncs to cloud whenever connected to cloud., Auto-scheduler overrides manual operations.,
Monitoring & alerts for MCB trips., Over/under voltage, current, overload, power factor & short circuit
protections with alerts via Dashboard, App, SMS, WhatsApp & Email., Contactor / Latch chattering
protection & alerts., Smart 4G Timer with neutral failure protection and alert., Bulit-in Watchdog for
anti-jamming., Smart 4G Timer must send Regular "heartbeat" on software for CCMS status.,
Accelerometer for tamper & panel movement detection & alerts., Smart 4G Timer must be tested from
an NABL Lab for Surge Test @ 6 KV (IEC 61000-4-5), ESD Test @ 4 KV (IEC 61000-4-2), EFT @ 2 KV (IEC
61000-4-4), Conducted Emission @ 150 KHz-30 MHz (CISPR11), Damp Heat Test (40 Deg C @ 95% RH)
2 cycles of 12+12 hours (IS: 9000 (Part 5/Sec.2):1981 latest) with all test passing criteria as “Temporary
degradation or loss of function or performance which is self-recoverable”., FOTA functionality required
for upgrades., Smart 4G Timer sends & stores online/offline data of controller & load for lamp burn
hours analysis., It stores & syncs connectivity logs for configuration of network connections &
analytics., PANEL & SWITCHGEAR.
ø THREE PHASE IOT CCMS STREETLIGHT CONTROL PANEL
Smart 4G Timer, Supply of IoT based 4G Smart Streetlight Control & Monitoring System having a Smart
Panel comprising of 3 Phase IoT Streetlight Smart 4G Timer with 16x2 LCD to display RSSI, relay status,
RTC time & diagnostics., Controller works on 3-phase & also on any available 1-Phase., Controller with
8-hour battery backup during external power failure. External power failure alert immediately to
cloud., 110-630 V AC @ 50-60 Hz – 3 phase operating range., Standby power consumption <3W., Smart
4G Timer with RS232 port for DLMS Energy meter., Smart 4G Timer must be compatible with any make
/ brand of DLMS (RS232) Energy Meter., DI: 4 Nos. (3 Contactor / Latch detection, 1 for Door Sensor.).,
DO: 3 Relays for Independent control each phase (R, Y, B) with 1 extra spare relay., Smart 4G Timer
with dual SIM functionality for connectivity backup., 4G M2M SIM 3-Year communication included.,
Local configuration via WiFi / BLE for maintenance or during force majeure., GPS chip inbuilt of Smart
4G Timer for auto location tracking & astronomic schedule location., 50 programmable schedules.,
Astronomic scheduling with monthly offsets., Smart 4G Timer has inbuilt timer stores schedules locally
& also stores schedule execution logs locally, syncs to cloud whenever connected to cloud., Auto-
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
scheduler overrides manual operations., Monitoring & alerts for MCB trips., Over/under voltage,
current, overload, power factor & short circuit protections with alerts via Dashboard, App, SMS,
WhatsApp & Email., Contactor / Latch chattering protection & alerts., Smart 4G Timer with neutral
failure protection and alert., Bulit-in Watchdog for anti-jamming., Smart 4G Timer must send Regular
"heartbeat" on software for CCMS status.,
Accelerometer for tamper & panel movement detection & alerts., Smart 4G Timer must be tested from
an NABL Lab for Surge Test @ 6 KV (IEC 61000-4-5), ESD Test @ 4 KV (IEC 61000-4-2), EFT @ 2 KV (IEC
61000-4-4), Conducted Emission @ 150 KHz-30 MHz (CISPR11), Damp Heat Test (40 Deg C @ 95% RH)
2 cycles of 12+12 hours (IS: 9000 (Part 5/Sec.2):1981 latest) with all test passing criteria as “Temporary
degradation or loss of function or performance which is self-recoverable”., FOTA functionality required
for upgrades., Smart 4G Timer sends & stores online/offline data of controller & load for lamp burn
hours analysis.,
Since the technology is updating every day and hence, the intention behind the installation of CCMS
unit as mentioned in paragraph(s) under "General" section is important and if any deviation in
offered CCMS unit is there it should be brought in notice and these deviations can be accepted if
they are fulfilling the intentions of the installation of CCMS Unit for streetlight application.
3.1 CODES & STANDARDS: -
Centralized Control and Monitoring Systems (CCMS) for streetlights must comply with
international and national standards focusing on IP65/IP66 enclosure protection, electrical
safety (surge protection 10kA-40kA, IEC 61000), and communication protocols
(GPRS/GSM/4G, MQTT, RS-232). Key compliance involves NABL accreditation for testing, IEC
60529 for ingress protection, and IS 1944 for lighting quality.
Following IS & its latest amendments should be followed unless until specified: -
Safety and Performance (IEC & NABL):
Surge Immunity: IEC 61000-4-5 (up to 40kA).
Enclosure Protection: IP65 or IP66 rating for outdoor ruggedness.
Electromagnetic Compatibility: CISPR11 and IEC 61000-4-2/4/5.
Testing: NABL accredited laboratory test reports required for reliability.
Communication & Intelligence:
Connectivity: GSM/GPRS/4G/IoT gateway for real-time monitoring.
Data Protocols: Support for MQTT or JSON for server communication.
Automation: Astronomical clock, photocell, or scheduling capabilities.
Installation & Site Safety:
Wiring: Compliance with IS:1944 for street lighting layouts.
Clearance: NESC rules for safety zones.
Commonly Used Codes
IS 1944: Code of practice for lighting of public thoroughfares.
IEC 61000: Electromagnetic compatibility (EMC).
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
IEC 60529: Ingress protection rating (IP).
IEC 62053: DLMS/COSEM communication for energy meters.
All applicable relevant Indian Standards published till now.
3.2 ENVIRONMENTAL CONDITIONS: -
The LED streetlight is to be used in city of Surat, which is in Southern part of Gujarat. It is well
connected with rails & roads, situated on Mumbai Ahmadabad Railway and nearby road is NH
# 48. The average atmospheric condition during the year is mentioned below. The equipment
shall be designed to work in such environmental conditions:
(i) Maximum ambient air temperature: 50° C
(ii) Minimum ambient air temperature: 5° C
(iii) Max. Relative humidity: 90%
(iv) Average Rainfall: 55+ inches
(v) Atmosphere: Dusty and Heavy chemical smoke at times in certain areas.
(vi) Coastal area: The equipment shall be designed to work in coastal areas, which are
having humid, salt laden and corrosive atmosphere.
3.3 CONSTRUCTIONAL FEATURES:
a) The electrical component of the CCMS must be suitably encapsulated with proper heat
dissipation facility to function in environment conditions mentioned earlier.
b) The connecting wires/ materials used inside the wiring shall be low smoke halogen free, fire
retardant e-beam cables.
c) Design of the thermal management shall be done in such a way that it shall not affect the
properties of the CCMS.
d) The infrastructure for Quality Assurance facilities to verify/ test/ prove above specifications
must be available at the manufacturing facility of the offered company (ies).
a) The construction of PCBs and the assembly for components for PCBs should be as per IS
3.4 CCMS System Integration
Surat Municipal Corporation (SMC) has already implemented a Centralized Control and
Monitoring System (CCMS) for street lighting across selected areas of the city.
Under the present project, additional street lighting infrastructure along with new CCMS
shall be installed by the selected bidder. The bidder shall develop and provide a new
unified software platform/portal for monitoring and control.
It shall be the responsibility of the bidder to ensure seamless integration of the existing
CCMS system with the newly proposed CCMS into a single centralized dashboard. The
integrated platform shall enable unified monitoring, control, data analytics, reporting,
and asset management for both existing and new systems.
The integration shall be carried out using open communication protocols and standard
APIs, ensuring interoperability and avoiding vendor lock-in.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
The bidder shall coordinate with the existing CCMS service provider(s), if required, and
complete all necessary integration activities without any disruption to the existing
system operations.
The final system shall be compatible with SMC’s existing or future Integrated Command
and Control Center (ICCC) and shall support scalability for future expansions
The following information shall be distinctly and indelibly marked on the housing:
Year of manufacture/ Batch Number/ Serial Number
Name of Manufacturer (Engraving only, stickers not allowed)
Outer Body Enclosure: -
1. The outer body of enclosure shall be MS Plate with appropriate height stand & support angle.
This stand shall be appropriately covered such that incoming & out going cable are protected &
aesthetically good looking.
2. Panel made with 2mm CRCA Sheet with Ground mountable stand complete with gland Plate
waterproof glands , earthing bolts.
3. The panel should be RAL7035 powder coated.
4. Necessary arrangements must be provide for Discom Power Energy meter.
5. Panel have canopy design such that for draining down water.
6. The dimension of the panel shall be decided during detailed engineering after order &
requirement of supplied company must be coordinated & considered before finishing this
structure & section of panel.
Inner CCMS Enclosure:-
Dimensions of the enclosure box should be such as there should be adequate space to access
components of the box for R & M purpose. The vendor must also ensure at least 20% space is
left in the box for future up-gradation/ devices to be added.
The enclosure box must have a standard lock which cannot be opened by all kinds of
commonly available tools.
Wiring inside the enclosure box should be done neatly with proper use connectors &
numbering with use of Ferrule PVC Tube. The enclosure should have theft control mechanism
and generate alerts when opened.
Contactor confirming to relevant IEC/IS Standard
Should conform to IEC 62053/ 62054, IS/IEC 60898 and IEC 60947-2.
Breaking capacity of 10kA throughout the range
MCB along with design for protection & auto-recovery/ self-healing is accepted.
Important Notes:-
1. The feature proposed for CCMS is indicative. However, bidders are free to offer their lighting
control technology which should encompass all key features as above. But, the same time,
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
software must have open source code, compatible with all relevant software(s) are in use by
SMC. It means control, supervision; data acquisition must be possible with the software to be
2. Offered brand has a dedicated telephone number/ Toll Free Number to lodge a complaint by
PROJECT AREA Officials/ Public in respect of system problems.
3. For comprehensive on-site Warranty and Maintenance for 1 year: Successful bidder shall
ensure 97% service level through CCMS Unit at any point of time during the contract period of
1 year. In case of failure of CCMS Unit which is brought to the notice of successful bidder (by
mail, letter etc.). The same has to be replaced within 48 hours of intimation. If vendor fails to
correct the fault within 48 hours, the penalty starts with first penalty being levied on
completion of 72 hours from logging of complaint. Penalty rate @ Rs. 100 per day per light
connected to the CCMS unit shall be imposed and the amount shall be deducted from the
vendor payment.
4. BYPASS FACILITY: -
In case of mal-functioning or non-functioning of the CCMS, streetlight operation can be done
manually without any additional installation a 2 Poles MCB having 32 A capacity will be provided. The
MCB should be connected with outgoing wires from energy meter and outgoing MCB of CCMS.
Installation: -
The CCMS unit shall be installed on suitable fabricated stand made from GI.Reinforced Cement
Concrete (RCC) foundation having Grade M20 along with necessary Foundation Bolt, Nuts,
Washers with anchor plate and DWC pipe for cable access etc. shall be casted having required
size as proposed by manufacturer of CCMS unit with necessary plastering. Foundation should
be made in such a way as site requirement. This section should be finished in decorative
manner as directed by Engineer-in-charge. The item includes excavation, necessary
reinforcement recommended by manufacturing co, Shuttering and M20 grade CC from
preferably RMC plant or mixture of 1:1.5:3 M20 grade CC. The Contractor should make
necessary arrangement for curing required for the works at his own cost. The site should be
cleaned or excess material should be removed after the work is completed. While making
foundation, best civil engineering practice(s) must be exercised. Bidder must take approval of
foundation drawing before carrying out the work.
Earthing of Feeder Pillar
1 Nos. of earthing should be done for each CCMS Pipe type Earthing having 1.5 m long, 2.5 cm
φ, 3.25 mm thick (min.) galvanised iron pipe with coupling and buch buried in specially
prepared earth pit. Pipe must be welded with GI strip at top for proper connection with
necessary 25 x 3 mm size GI earthing strip using nut and bolt with washers. Salt and charcoal/
coke must be added as required for pipe type earthing. Earthing pipe will be connected to pole
by GI earthing strip through necessary GI nut-bolt & washers. GI welding of strip/ bolt with
pole’s face should be done for durable earthing. Earthing Drawing is attached herewith for
reference; however, final decision of engineer in charge must be binding to the contractor
regarding construction of earthing.
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Head of the Department,
Light & EEC, /Zone
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
GENERAL SPECIFICATION FOR ELECTRICAL INSTALLATION: -
The installation should be carried in conformity with the Indian Electricity Act/ Rules and the latest
edition of the wiring rules of the Institution of Electrical Engineers (London) but where this
specification differs from those rules the specifications shall be followed.
The definitions of terms in the IEC wiring rules shall apply.
SUPPLY PRESSURE AND FREQUENCY:
The supply will be three phases, 50 cycles/ second AC, 4 wire system, 415 V between phase and 230/
240 V between phase and neutral and apparatus required shall be suitable for this supply.
GENERAL TEST FOR INSTALLATION:
The installation with fittings complete shall satisfactorily pass the following tests, before the current is
"All the lamps and appliance having been connected to the conductors and all switches and fuses be
ON. A pressure not less than twice the working pressure (subject to a limit of 500 volts) shall be applied
and the insulation resistance of the whole or any part of the installation to earth must not be less in
MΩ than 25 divided by the number of points, subject to Min. of 1.5 MΩ."
The whole of the work shall be carried out to the satisfaction of the Engineer in charge and under the
constant supervision of the contractor's competent qualified and experienced supervisor/ engineer.
The contractor shall if required by the department, furnish the full details of the supervisor’s/
engineer's qualification. Only permit holder persons should be allowed to work at the site.
Head of the Department,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER: -
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
Name of Work : Supply, Installation, Testing and Commissioning of CCMS based Smart Street
Light Feeder Pillar Panels for Replacement of Existing Street Light Feeder Pillars in Various
Zones of Surat Municipal Corporation.
Sr.No. Estimate Amount Rs. % Above / Below
1 9,17,54,563.00 To be Submitted on line only
Importance Note :-
Price should be inclusive of all taxes Excluding GST, levies, packing / forwarding,
transportation, freight, watch & ward, insurance etc
Tender once offered shall not be withdrawn except with the permission of competent
authority of Surat Municipal Corporation only.
Tender once accepted shall be binding to the contractor even if the formal agreement
I/C.Executive Engineer,
Surat Municipal Corporation.
SEAL & SIGNATURE OF THE TENDERER
Tender Notice #ACE(Ele./Mech.)/Light&EEC/13/2025-2026
END OF THE TECH-BID DOCUMENT
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical Bid_CCMS_Final.pdf
Download all tender documents and submit your bid