Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.8 LAccepted-Finance AT ITMA KUSTUNA DIST SUNDARGARH | KUSTUNA | SUNDARGARH | ODISHA | ₹14.8 L | 1 | Accepted-Finance lottery |
| 2 | 2₹14.8 LAccepted-Finance | ₹14.8 L | 2 | Accepted-Finance lottery |
| 3 | 3₹14.8 LAccepted-Finance AT KHATKURBAHAL PO KUTRA DIST SUNDARGARH O PIN 770018 | SUNDARGARH | ODISHA | 770018 | ₹14.8 L | 3 | Accepted-Finance lottery |
| 4 | 4₹14.8 LAccepted-Finance AT PO PAHANDI DIST BARGARH | PAHANDI | BARGARH | ODISHA | ₹14.8 L | 4 | Accepted-Finance lottery |
| 5 | 4₹14.8 LAccepted-Finance AT PO EKMA DIST SUNDARGARH ODISHA | SUNDARGARH | SUNDARGARH | ODISHA | ₹14.8 L | 4 | Accepted-Finance lottery |
Tender Value
₹14.8 L
EMD Value
₹14,826
Closing Date
5 Jun 2026, 5:00 pmClosed
BDO, Bargaon
Office of Panchayat Samiti, Bargaon
Construction of Additional Classroom at Govt Primary school Buduna
2026_PRBGR_127363_1
3
Open Tender
Civil Works - Buildings
Percentage
Fulbari GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
BArgaon
₹14,826
Yes
6 Jun 2026
23 May 2026
6 Jun 2026
25 May 2026
5 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials with mechanical means within 5.00km. initial leads and lifts as per direction of E.I.C. | 46.1 | cum | 282.9 | ₹13,041.69 |
| 2 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | 56.7 | cum | 911.9 | ₹51,704.73 |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 15 | cum | 6,599.9 | ₹98,998.5 |
| 4 | Brick masonary work with Fly Ash bricks in cement mortar (1;6) F & P inlcuding cost, carriage & royalty of materials etc. complete as per the direction of Engineer-in-charge. | 15.7 | cum | 5,724.7 | ₹89,877.79 |
| 5 | Brick masonary work with Fly Ash bricks in cement mortar (1;6) in super structure inlcuding cost, carriage & royalty of materials etc. complete as per the direction of Engineer-in-charge. | 17.6 | cum | 5,758.1 | ₹1,01,342.56 |
| 6 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. | 32 | cum | 6,608.4 | ₹2,11,468.8 |
| 7 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. | 32 | Qntl | 9,537.3 | ₹3,05,193.6 |
| 8Centring suttering for RCC works | |||||
| 8.01 | column base/slope | 12.92 | sqm | 250 | ₹3,230 |
| 8.02 | plinth band | 17.7 | sqm | 250 | ₹4,425 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
acrdtcn.pdf
Tender Documents • 15.11 MB
BOQ_586746.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].