Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.8 L
Closing Date
6 Oct 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW DIVISION RAJOURI
CONSTRUCTION OF T/ROAD GHAI TO MAJOOR UPPER W.NO 1 Pyt. Lamberi Upper Block Lamberi Under B2V3
2021_RDPR_141195_2
e-NIT No. 51 REW RAJOURI OF 2021 Dated 25-09-2021
Open Tender
Civil Works
Item Rate
30 days
Lamberi
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
CD-Account No. 0020010200000890
Exempted
11 Oct 2021
25 Sept 2021
7 Oct 2021
25 Sept 2021
6 Oct 2021
25 Sept 2021
45 days
Amount
Earthwork in bulk excavation by mechanical means ,over areas including disposal of excavated earth up to 50 mtr. And lift upto 1.5 mtr in 80% AKS and 20% ordinary rock.
Earthwork in excavation by mechanical means in trenches for foundation ,over areas (exceeding 30cm up to 1.50m) in depth as well as 10m on plan including disposal of excavated earth up to 1 mtr. Form cutting edges and disposal of earth and level neatly dressing in 80% AKS and 20% ordinary rock.
Providing and laying in position cement conc. Of specified grade excluding the cost of centering and shuttering all work up to plinth level (1:3:6) (1: cement:3 coarse sand:6 graded stone agg. 20 mm nominal size) Including all lead lift and carriages including loading, unloading stacking at site complete Job.
Supply and pacing of stones in Plumb Conc.
Providing and laying dry stone crushed aggregates ( 40 mm size) mixed with sand.
Providing and laying in position cement conc. Of specified grade excluding the cost of centering and shuttering (1:2:4) (1: cement:2 coarse sand:4 graded stone agg. 20 mm nominal size) flooring
Centering and Shuttering including strutting, propping etc and removal of form for footings, foundations etc.
mohd tufail
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .