Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
2 Apr 2026, 3:00 pmClosed
Through Sleeper Renewal (Primary) of existing PSC Sleepers with new wide based PSC sleepers for a length of 3.954 Km. on SL, Up & Dn. Lines under the jurisdiction of SSE(P. Way)/Jeypore on KK-II line of Waltair Division.
eT-West-WAT-06-2026~ECOR
eT-West-WAT-06-2026
Open
Works - General
6 Months
Dibrugarh, Assam
₹0
₹2.2 L
2 Apr 2026
10 Mar 2026
19 Mar 2026
A-All Items covered Under USSOR-2021 ( Expect Sleeper Renewal, Deep
B-All items covered under IR USSOR 2021- (Chapter-17- Transportation). 6348413.12 Below/P
C-All Items covered under USSOR-2021 (Through Sleeper Renewal) 1602954.42 Below/P
D-All items covered under USSOR-2021 (Deep screening & related
E-All items of works covered under "NS ITEMS" 270869.11 Below/P
related works & Transportsation of P. way Materials )
Item- 01 All items of works covered under IR USSOR-2021.
S No. Item Description of Item Unit Qty Rate Amount
Fixing of fish plates with fish bolts on a joint of
all rail sections duly lubricating fish
plates/bolts with contractor's grease graphite
in running track condition including
transportation of fish plates and fish bolts from
nearest station / store / level crossing. Note:
Rail cutting & drilling to be paid separately.
2 063090 Lubrication of ERCs and its liner contact area ERC 24806.00 4.08 101208.48
by removal of ERCs and Metal / GFN liners in
rail panel, cleaning of rust / scale of ERC, Metal
/ GFN liners & SGCI insert by using wire brush,
scrapper / sand emery paper etc supply and
application of graphite grease, as prescribed
by Railway for under side of liners &
corresponding area of rail foot & SGCI insert
with ERCs and re-fixing the same as per
procedure prescribed in latest edition of
IRPWM with contractors grease and all other
tools & plants complete and as directed. Note:
Each ERC in this item shall constitute 1 ERC
and its Liner Contact area.
3 063100 Removing seized ERC from SGCI inserts of ERC 9815.00 59.81 587035.15
existing track by using suitable approved
chemicals and re-fixing after greasing of insert
eye and ERC with Contractor's grease of
specified quality as per provisions of IRPWM,
as directed by Engineer in-charge. Note: 1.List
of Seized ERC along with location shall be
prepared after inspection of SSE/P.Way and
marked prior to execution of this item. 2. Due
care shall be taken to avoid any damage to
the sleeper 3.A penalty of 50% of the basic
cost of new sleeper in nearest sleeper factory
shall be levied on each, if SGCI insert is broken
or sleeper gets cracked in the process.
procedure prescribed in latest edition of
IRPWM including cess dressing on both sides of
track. The work will include removing excess
ballast from track and putting the same in crib
and shoulder by leading to a maximum of 50m
including crossing of track, deweeding on
ballast section etc and as directed by
Engineer-In charge.
5 084010 Loading Railway's ballast, collected at yard / cum 2681.50 41.67 111738.11
depot into Railway's BOB / BKH / any other
type of open wagon, using Mechanical Loader
or any other method with all lead and lifts, as
directed by Engineer in-charge.
WALTAIR DIVISION-ENGINEERING/ECOR
6 084020 Leading and loading Railway's Ballast cum 2772.00 106.36 294829.92
collected at yard / depot into Railway's
covered wagon using any approved method
with lead up to 250m & all lifts as directed by
Engineer in-charge.
Unloading of ballast from Railway's Hopper
Wagons, quantity distribution as per pre-
defined site requirement, clearing
infringements/jammed ballast, distributing the
unloaded ballast uniformly over the track,
profiling and boxing following all prescribed
Unloading of Ballast from Railway's wagons
other than Hopper wagons by opening the
doors of boxes and pulling & pushing down
ballast with rake irons / phowrahs and
distributing unloaded ballast uniformly over
the track as required, clearing
infringements/jammed ballast, profiling and
boxing following all prescribed safety norms.
8 084052 Under Conditions not requiring Traffic Block: cum 2772.00 90.71 251448.12
25mm gap 'in-situ' welding during traffic block
using Railway's welding portion and finishing
of weld to meet the prescribed tolerances and
pass all stipulated tests with all required
labour, materials, consumables, tools,
equipments etc. to complete the work in all
respect as per IR's "Manual for Fusion Welding
of Rails by Alumino - Thermic Process" with
latest correction slips, including marking of
welded joint, painting weld collar with
anticorrosive paint, restoration of track near
weld joint to original position and fixing of
joggled fish plate at new weld, to be removed
after passing of weld in USFD test as directed
by Engineer in charge. Note: 1. Welding
portion and related accessories as per
Annexure - I shall be supplied by Railways. All
other items required shall be supplied by the
Contractor. 2. Welding shall be carried out
only by trained welder having valid
competency certificate. 3. Hydraulic Weld
trimmer shall be used for chipping and profile
Grinder for finishing. 4. Required nos. of
Joggled fish plates shall be supplied by
Railway at nearest P. Way Stores and the
same shall be returned at nearest P. Way
Store or at other location as per direction of
Engineer-in-Charge after release from track.
crucible fitted with Automatic Tapping Thimble
Technology, 3 pieces Mould (Zircon washed)
and Compressed Air Petrol heating technique.
WALTAIR DIVISION-ENGINEERING/ECOR
25mm gap Cess Welding with Railway's
welding portion and finishing of weld to meet
the prescribed tolerances and pass all
stipulated tests with Contractor's labour,
materials, consumables, tools, equipments
etc. to complete the work in all respect as per
IR's "Manual for Fusion Welding of Rails by
Alumino - Thermic Process" with latest
correction slips, including all required handling
and rehandling of rails, marking of welded
joint, painting weld collar with anticorrosive
paint, as directed by Engineer in charge. Note:
1 . Only welding portion and related
accessories as per Annexure - I shall be
supplied by Railways. 2 . Welding shall be
carried out only by trained welder having valid
competency certificate. 3. Hydraulic Weld
trimmer shall be used for chipping and profile
Grinder for finishing.
crucible fitted with Automatic Tapping
Thimble, 3 pieces Mould (Zircon washed) and
Compressed Air Petrol/LPG pre heating
Picking up of slacks in track of all sleeper
density, duly opening up ballast, gauging,
alignment, correcting longitudinal & cross
levels, packing, boxing of ballast and dressing
the same under traffic conditions as per
procedure prescribed in latest edition of
IRPWM and as directed by Engineer in-charge.
Note: In-charge section Engineer should
identify locations requiring packing and obtain
prior approval of DEN/XEN before execution of
the work when there is no Zonal Track
Maintenance agency deployed in the section.
De-stressing of LWR/CWR track of any density
under traffic line block with contractor's
labours, tools, equipments and consumables
inclusive of all lead & lift. Activities include
cutting of LWR/CWR into convenient panels of
specified length, removal of ERCs, liners,
greasing of ERCs and liner contact area, lifting
rails and keeping them on rollers provided at
every 15 sleepers, working out elongation of
rail ends depending on prevailing site
conditions, pulling rails with the help of
Hydraulic Tensor to achieve the desired
elongation, cutting rails, as required, removing
rollers and placing rail in position, re-fixing
ERCs & liners and adjustment of gap at SEJs :
Note: (1) Welding of rail joints will be paid
separately. (2) Rail cutting and Hole drilling
shall be paid separately. (3) Opening and
closing of LC if required will be paid
separately. (4) As per procedure prescribed in
latest edition of IRPWM & CE's Circulars for
destressing of LWR/CWR, if any.
12 135011 With Railway's Hydraulic Rail tensor TRM 1915.00 35.46 67905.90
13 135012 With Contractor's Hydraulic Rail tensor TRM 1980.00 38.97 77160.60
Fixing Joggled Fish Plates with bolt / clamp
(supplied by Railway from nearest SSE Store)
in running track conditions at welds on rail, as
directed by engineer in-charge (drilling of
holes in rail, if required, shall be paid
WALTAIR DIVISION-ENGINEERING/ECOR
15 136080 Drilling holes of 16mm to 22mm dia. on all Each 59.00 318.19 18773.21
types of PSC sleepers and fixing the dowels
with adhesive of RDSO approved quality for
fixing check rails & guard rails, as directed by
Engineer in-charge.
16 136090 Cleaning of side drains along the track RM 2182.00 29.98 65416.36
including disposing of muck beyond Railway
boundary as per instructions of Engineer in-
charge to keep drains clean and clear in
17 136100 Removing weeds & bushes in ballast section TRM 682.00 13.80 9411.60
and cess up to 3.95m from centre line of track
in mid section & station yard, as specified by
Engineer in-charge including disposal of
branches, bushes outside cess/yard.
18 151100 Guarding and watching the Track machine / Shift 37.00 751.92 27821.04
group of machines, spare parts, oils, grease
etc. of PQRS cranes (one set of 2 portals)
during day and night time in a shift of 12 hours
each, at all locations wherever necessary, as
instructed by the machine in-charge. Note:
One shift comprises of 12 hours.
19 154010 Carrying out preparatory works for operation TRM 2327.00 15.02 34951.54
of Ballast Cleaning Machine (BCM) which
includes making trench in track for inserting
cutter bar, supporting track on wooden block
supplied by Railway, removal of ballast along
with muck from shoulder which is out of reach
of cutter chain and putting the same in cutting
width or between rails. Rate includes all
miscellaneous works, e.g. opening and re-
fixing of joggled fish plates, OHE Bonds,
dismantling & removing obstructions etc.
20 154020 Carrying out various works during operation of TRM 1864.00 36.36 67775.04
BCM, like filling up of ballast at deficient
location from locations where ballast is excess
or from adjoining tracks, required initial
packing, adjustment of PSC Sleepers, provision
wooden blocks supplied by department and
attending track parameters etc. complete so
as to make track fit for 20 kmph speed.
21 154030 Removal of screened muck discharged by TRM 3931.00 27.60 108495.60
BCM, where muck disposal on side slope is
restricted due to platform, cutting, OHE mast
etc. and disposing it beyond 5m from edge of
cutting up to 3m deep or alternatively carting
it up to 50m for disposing off beyond the end
of cutting / platform and making up cess
22 154040 Removal of screened muck discharged by TRM 2102.00 18.40 38676.80
FRM/SBCM where muck disposal on side slope
is restricted due to platform, cutting, OHE
mast etc. and disposing it beyond 5m from
edge of cutting up to 3m deep or alternatively
carting it up to 50m for disposing off beyond
the end of cutting / platform and making up
cess wherever low.
disposal of muck at a distance beyond 50m for
every additional lead of 50 metres or part
thereof up to 500 metres.
disposal of muck for additional lift of 1 metre
or part thereof beyond 3 metre lift in case of
disposal of muck from track in cutting.
WALTAIR DIVISION-ENGINEERING/ECOR
25 154080 Ballast equalisation & ballast profiling after TRM 2327.00 34.29 79792.83
completion of deep screening work by BCM
and/or after unloading of ballast by DMT
(Ballast Train), as directed by Site Engineer as
per IRPWM including heaping of ballast in
tamping zone keeping rails & sleeper top free
from ballast, spacing and squaring of sleeper,
gauging, cleaning of muck, proper fixing of
fastening, attention during each round of
sleeper tamping in relation to pre & post
working Note: Payment shall be made only
once in irrespective of numbers of TTRM
packing round and after restoration of normal
speed and restoration of complete ballast
profile and cess profile.
26 154100 Carrying out Through packing of sleepers to TRM 2327.00 78.86 183507.22
make track fit for 30 KM speed as per
procedure stipulated in latest version of
IRPWM, behind BCM including filling ballast
when only lifting is carried out by BCM.
27 154110 Pulling the left over ballast to the shoulders TRM 2327.00 28.68 66738.36
and dumping excess ballast in the cribs and
shoulders including boxing/profiling as per
IRPWM of track together with left over
stretches at fixed structures/masts
immediately after FRM work, leveling the muck
for making up cess and side slopes including
removing and re-fixing of traction bonds
during line block with all contractors labour,
tools, plant, all lead, lift, crossing of track etc.
complete and as directed by the Engineer-in-
WALTAIR DIVISION-ENGINEERING/ECOR
Carrying out pre-tamping, during tamping and
post-tamping work for tamping track with all
types of rails, sleepers & sleeper density by
various Track Tamping machines, like
CSM,DUO/3X Machines which include : (1) Re-
adjustment of ballast, heaping-up of ballast,
filling-up of cavities in tamping zone by
picking ballast from stacks / shoulders / crib of
adjoining track up to lead of 50 m to ensure
effective packing; (2) Clearing of ballast on
sleepers to make them visible to operator, (3)
Clearing of ballast over rail foot to facilitate
holding of rail by rollers of TTRM; (4) Digging,
screening and replenishment of ballast at mud
pumping / rounded ballast in sleeper crib
location; (5) Tightening of loose fittings
immediately before & after tamping; (6)
Replacement of broken / missing fittings
supplied by Railway; (7) Correcting displaced
sleepers to position along with squaring; (8)
Re-setting of worked-out / fallen fittings. (9)
Removing and re-fixing joggled fish plates &
wooden blocks, wherever necessary; (10)
Manual consolidation of ballast in crib /
shoulders; (11) Removing and refixing of
traction bonds during the block in electrified
sections (12) Dressing of ballast Note: 1.
Tamping blocks are not identical & it may be
given at any time either during day or night.
2. Stages of payment a) 30% of the rate will
be paid on completion of pre tamping
attention, b) Balance 70% of the rate will be
paid on completion of post tamping. 3.
Recovery at the rate of twice the above
applicable rate will be effected in case
contractor fails to carry out pre/during/post
operation. 4.Payment shall be made only once
in irrespective of numbers of TTRM packing
round and after restoration of normal speed
and restoration of complete ballast profile.
30 155030 Removing and refixing of guard Rails over slab TRM 195.00 97.90 19090.50
bridges during machine packing with all
contractor's men and materials duly removing
fittings, leading guard rails to bridge
approaches, lifting, dragging, positioning and
crossing of track etc, and as directed by
Engineer In charge.
31 157020 Carrying out ancillary works required for UTV Shift 2.00 2120.76 4241.52
working under line block i.e., turning of rails/
Sleepers and keeping in position for fixing of
UTV clamps to rail, keeping rails/PSC Sleepers
in position while loading into BFR, removal of
clamps on BFR for releasing loaded
rail/Sleepers, adjusting of rails/Sleepers on
BFR etc. by providing minimum of three men
in a shift of 8 hours, with all contractor's tools,
all lead, lift, crossing of tracks etc., complete
and as directed by the engineer - in - charge.
Note: In case, contractor provides less no. of
Labour, payment will be deducted for each
such person @ 2/3 rd of the accepted item
WALTAIR DIVISION-ENGINEERING/ECOR
Providing lighting arrangements with halogen
lamps on and around machine during machine
working in night time blocks, with contractor's
generator, consumables, all necessary
electrical fittings, operators etc. Note: 1.
Lighting arrangement is to be provided as per
advance planning of Night Blocks and written
communication. 2. In case lighting
arrangement is made available but not used
due to non-availability of block, payment @
60% of the item rate shall be made. 3. In place
of Halogen, LED lamps of equal lumen capacity
may be used with the approval of Engineer -in-
Charge. 4. If lighting arrangement fails during
block, recovery shall be made twice the rate
generator and 8x500 W)
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete
as directed by Engineer in-charge. Abrasive
Rail Cutter will be as per RDSO Specification
No. TM/SM/1 (Rev. 01 of 2012) with latest
status of RDSO; Rail Cutting Wheel Abrasive
Disc will be as per RDSO Specification
No.TM/SM/2 (Rev. 01 of 2020)
Drilling holes of 16 mm to 32 mm dia. with Rail
Drilling machine including chamfering with
appropriate chamfering tools in all types of rail
section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated 24.04.1991.
Fixing of wooden blocks of approximate size of
150mm x 300mm x 1200mm on end of check
rails including sizing at level crossings with
contractor's labour, tools & plants and as
38 186171 With Railway's wooden block by cutting Each 55.00 265.15 14583.25
Railway's wooden sleepers (supplied free by
Railways) into blocks by sawing to size
sleepers with suitable rotary hammer / drilling
machine at indicated location for fixing of
guard rails on bridges & its approaches as per
approved drawing and fixing of contractor's
HDPE dowels and adhesive of approved quality
to Drawing no. RDSO/T-3002, procured from
RDSO's approved sources with contractor's
materials and consumable.
WALTAIR DIVISION-ENGINEERING/ECOR
Manufacturing, fabricating and supplying
retro-reflective Engineering Indicator boards,
made of 2mm thick aluminium sheet or 3mm
thick aluminium composite sheet, face to be
fully covered with high intensity encapsulated
type heat activated retro-reflective sheeting
conforming to type-IV of ASTM-D4956-01 in
yellow & black or other colour combination
including subject matter, message, symbols,
borders etc. as approved by Engineer In-
charge or as per IRPWM guidelines, pasted on
substrate by an adhesive backing which shall
be activated by applying heat and pressure
conforming to class-2 of ASTM-D-4956-01 and
fixing the same with suitable sized aluminium
alloy rivets @ 20 cm c/c to back-support frame
of M.S. angle iron of size 25mm x25mm x
3mmprovided all along the edges of board
with theft resistant measures back side of
board shall be with non-peelable weatherproof
paint, consisting of one coat of zinc chromate
primer and two coats of epoxy paint. Vertical
post shall have black & white anti-corrosive
paint or powder coating complete, as directed.
1400mmx400mm with back support frame
fixed to vertical post of MS angle of size
50mmx50mmx6mm of 3650 mm long
41 202022 Speed Indicator Board of equilateral triangular Each 1.00 5205.56 5205.56
shape having each side of 1000mm with back
support frame fixed to vertical post of MS
angle of size 50mmx50mmx6mm of 3650 mm
42 202024 Termination Indicator Board of Circular shape Each 2.00 7362.86 14725.72
having diameter of 1000mm with back support
frame welded to vertical post of MS angle of
size 50mmx50mmx6mm of 3950 mm long
43 211030 Fabricating of check rails of 52Kg and 90R RM 261.00 255.91 66792.51
sections for providing to curves by cutting web
of rail horizontally by gas, grinding for
smoothening the cut edge and drilling of
parabolic shaped holes to the web of check
rails as per drawing and specification and as
per directions of engineer in-charge with all
contractor's labour, tools and materials
complete. Note: 1. Rails shall be supplied by
Railways 2.The both ends of head of check
rails are to bent/cut as per drawing. 3. The
released rail scrap shall be stacked neatly with
in a lead of 500m. 4.Drilling of holes shall be
paid under relevant item.
44 211040 Dismantling Check Rail on curves on track of RM 592.00 59.60 35283.20
all rail sections, duly removing fish plates and
bolts including removing chairs from sleepers,
leading and stacking released materials away
from track clear of infringements, complete
and as directed.
45 211050 Fixing of check rails on curves on track of all RM 592.00 64.26 38041.92
rail sections as per drawing and to correct
alignment and level with Railways fastenings
including leading of rails and fittings, crossing
of tracks, greasing of plate screws with
approved grease etc., as per drawing and
directions of Engineer in charge with all
contractors labour, tools, plants, machinery,
consumables etc., complete. Note: Required
P.Way fittings will be supplied at SSE/P.Way
WALTAIR DIVISION-ENGINEERING/ECOR
46 211140 Supplying and spraying in specified proportion Sqm 2731.00 0.51 1392.81
Weedicide Chemical, capable to kill entire
weed on track / cess / embankment with all
labour, material, tools & plants etc. complete
job in all respect. Scientific name of the
chemical is Isopropylamine Salt of Glyphosate,
in which active ingredient is Glyphosate
(41%), colour is light amber to brownish, very
low in toxicity and has favourable
environmental characteristics. It will be
ensured that no weed growth occurs up to six
months period, otherwise re-spraying shall be
done by the contractor free of cost.
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange all
statutory permits as required by rules and
regulations prevailing in the area of work.
Payment shall be made for actual working
47 211202 Hydra or similar tyre mounted Pick-n-Carry Hour 5.00 1134.57 5672.85
crane of 12T capacity for misc. works of
handling of material
Schedule Schedule B-All items covered under IR USSOR 2021- (Chapter-17- Transportation).
Item- 01 Chapter - 17 - Transportation
S No. Item Description of Item Unit Qty Rate Amount
Loading, leading and unloading of 52Kg / 60Kg
rail up to 13 metre length by Railway's Rail
Dolly / Dip Lorry to the nominated location
under traffic with line protection in case road
carriage is not possible with different lead with
a lift up to 5 metre during block period.
Unloading of rails of any section and length up
to 13 metre, in neat manner for Railway usage
from departmental material train (DMT) or
contractor's / Railway's Truck/trailer including
lead up to 50 metre, lift up to 5 metre and
stacking in prescribed manner.
3 171051 From wagons during period of traffic block MT 14.00 163.53 2289.42
where handling by mechanical means is not
Loading of 52kg / 60kg PSC line and special
sleepers beyond 2.75 metre length including
existing fittings and fastenings in Depot /
Station / Mid-section between stations in a
neat manner to departmental material train
(DMT) or contractor's / Railway's Truck/trailer
with crane or any other means including
crossing of one track with free lead up to 250
metre and lift up to 5 metre, if required with
contractor's labour, tools & plants, machinery,
consumables etc. Note: In case of any damage
to sleeper during loading, penalty @ 50% of
the all inclusive cost of sleeper shall be levied.
4 172024 I n Wagon/Truck / trailer where mechanical MT 1921.00 128.53 246906.13
handling is possible a n d traffic block is not
WALTAIR DIVISION-ENGINEERING/ECOR
Loading, leading and unloading of PSC
Sleepers of 52Kg / 60Kg by Railway's Rail
Dolly/ Dip Lorry to the nominated location
under traffic in case road carriage is not
possible for different leads and lift up to 5
contractor's Rail Dolly/Dip Lorry.
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
m a t e r i a l except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall be
the shortest motorable road length between
the points of loading and unloading.
over item no. 172047
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1. Lead shall
be the shortest motorable road length
between the points of loading and unloading.
2. Loading and unloading shall be paid extra
under relevant items.
over item no. 172057
Unloading of 52kg / 60kg PSC special sleepers
beyond 2.75 metre length in Depot / Station /
Mid-section between stations in neat manner
for Railway usage from departmental material
train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
50 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery,
consumables etc. Note: In case of any damage
to sleeper during loading, penalty @ 50% of
the all inclusive cost of sleeper shall be levied.
Collection, segregation and stacking of various
scattered P.Way materials at nominated
stacking location with serviceable and un-
serviceable ones separately within a lead up to
500 metre and lift up to 5 metre including
crossing of track(s) wherever necessary as
directed by Engineer-in-Charge.
WALTAIR DIVISION-ENGINEERING/ECOR
26 173033 P.Way fittings of all types and other similar MT 41.00 358.83 14712.03
Schedule Schedule C-All Items covered under USSOR-2021 (Through Sleeper Renewal)
Item- 01 Through Sleeper Renewal
S No. Item Description of Item Unit Qty Rate Amount
Through Sleeper Renewal (TSR) with PSC
sleepers involving removal existing sleepers of
any type along with fittings from track,
insertion of PSC sleepers lying along the cess /
formation / slope / toe within 5 metres height
with all fittings to specified spacing, gauge and
squareness, one round of through packing to
make track fit for 20 kmph speed, dressing of
ballast to standard profile, all in accordance
with the latest provisions of IRPWM and
stacking of all released material neatly at
specified places within an average lead of 100
m as directed by Engineer in-charge.
1 062013 For PSC wider base sleepers - For location of Each 124.00 331.49 41104.76
work not involving deep screening
2 062014 For PSC wider base sleepers - For location of Each 6338.00 184.81 1171325.78
work involving deep screening. (deep
screening to be paid separately)
Schedule Schedule D-All items covered under USSOR-2021 (Deep screening & related items)
Item- 01 Deep Screening & Related Items
S No. Item Description of Item Unit Qty Rate Amount
Manual deep screening of Plain track/ turnouts
as per procedure prescribed in IRPWM, June
2020 or latest, on PSC sleepers of any density
and throwing away screened muck arising out
of screening on toe of bank or on cess, if low
or on spoil banks above top of cutting
(including throwing and leveling, if required
beyond minimum 5m from the edge of cutting
which are up to 3m deep or alternatively
carting it up to 50m for disposing it off beyond
cutting or platforms) as per direction of
Engineer in-charge, including cutting cess for
effective drainage on both sides, one round of
kutcha packing with screened ballast and
further attending to track parameter to make
track fit for 20 kmph speed complete in all
respect. Note : Payment shall be made for
length along main line only for turnouts.
For Plain Track :
2 083010 Lifting and packing for regrading the existing TRM 3886.00 165.82 644376.52
PSC sleeper track to required height / level in
stages not exceeding 75mm or part thereof at
a time, providing permissible ramp for the
track, insertion of moorum / sand / stone
ballast uniformly under the existing track and
placing the same to safe approved gradient,
gauge, cushion including levelling and one
round of through packing to allow train
movement at restricted speed of 30 kmph for
a specified length with all leads & lifts and
fixing, marking, painting rail level pegs at
every 30m interval. Note: Lifting of track shall
be done in stages as per procedure prescribed
in latest edition of IRPWM to get the proposed
final level as per approved working profile, as
directed by Engineer in-charge.
WALTAIR DIVISION-ENGINEERING/ECOR
3 083011 Extra for additional lift over 75mm for every TRM 9826.00 25.63 251840.38
50mm lift or part thereof up to 275mm for
item nos. 083010 for each TRM.
Through packing of track, as per procedure
prescribed in latest edition of Indian Railways
Permanent Way Manual
4 131011 For PSC sleeper Track with Sleeper Density of TRM 3886.00 96.79 376125.94
1540 Sleepers/Km or more
First or Second Through Packing of track of all
sleeper density including giving a general lift,
as desired to eliminate sag after Deep
Screening work, lifting of track, lowering of
track and major realignment of curves and
formation rehabilitation as per procedure
prescribed in latest edition of IRPWM. Note:
General lift is normally 25 mm and isolated lift
may be up to 50 mm.
5 131032 For PSC Sleeper Track with Sleeper Density of TRM 1560.00 127.76 199305.60
Third or subsequent Through Packing of track
for all sleeper density including picking of
slacks, as required after second through
packing, subsequent to Deep Screening work
as per procedure prescribed in latest edition of
IRPWM. This item can also be used after
lifting/regrading/realignment works also. Note:
General lift is normally 25 mm and isolated lift
may be up to 50 mm.
6 131042 For PSC Sleeper Track with Sleeper Density of TRM 1559.00 98.28 153218.52
Schedule Schedule E-All items of works covered under "NS ITEMS"
Item- 01 NS ITEMS
S No. Item Description of Item Unit Qty Rate Amount
1 01 Inserting / Spreading MS plate /Flat on PSC Per 679.00 4.20 2851.80
sleepers for movement of TRT sled with Sleeper
contractors's own labour. MS plate / flat will be
made available near the site of work and all
handling , leading for stacking point to be
done by contractor by his own cost) Each
2 02 Opening of track by removing existing ballast TRM 409.00 113.48 46413.32
in shoulder and crib portion up to the bottom
of sleeper in advance of traffic block to
facilitate for laying PSC sleepers by TRT,
putting back the ballast to the correct profile
including boxing the ballast neatly after the
new PSC sleepers are laid with all lead and lift
etc. complete and as directed by the Engineer-
in-charge. (All labour and tools are to be
supplied by the Tenderer/Contractor only at
3 03 Removing the GRP from the PSC sleepers Per 679.00 7.69 5221.51
during the TRT work just a head of picking up Sleeper
of sleepers by TRT and again placing the GRP
over the sleepers laid by the TRT duly stocking
the GRP suitably by the deputing suitable men
(atleast 4) in the nominated location of the
TRT machine with all lead and lift etc.
complete and as directed by the Engineer-In-
Charge. (All labour and tools are to be supplied
by the Tenderer / contractor only at his own
WALTAIR DIVISION-ENGINEERING/ECOR
4 04 Fixing, driving ERC and liners in correct Per 679.00 15.32 10402.28
position manually, covering the complete day Sleeper
work including adjusting of rubber pads and
liners. (All labour and tools are to be supplied
by the tenderer / Contractor only at his own
5 05 Post block attention of track by checking and Per 679.00 14.10 9573.90
squaring of out of square sleepers if left behind Sleeper
by the TRT including adjusting of rubber pads
and liners and fixing / driving the ERCs in
postion and filling back ballast in crib and
shoulder portion to enable machine packing /
picking of slacks in closing / opening stretch or
any other locations by spot / stretch attention
with all lead and lift etc., completed as
directed by Engineer-in-charge. (130m rail
panels) (All labour and tools are to be supplied
by the tenderor /Contractor only at his own
6 06 Fish plating the ends of rail Pannels including Per Joint 5.00 360.26 1801.30
drilling of two holes of 32 mm dia in web of
each end of rails and tightening of bolts and
nuts as required (All labour and tools are to be
supplied by the tenderer / Contractor only at
7 07 Lifting of track for length as required at site Each 2.00 6233.74 12467.48
per block for required height after TRT working
to join the track with track lifted by the TRT
and providing smooth ramp / slope including
putting ballast into the track below sleepers
and crib portion, levelling and packing to make
track fit for safe passage of trains at restricted
speed and as directed by the Engineer-in-
charge. (All labour and tools are to be supplied
by the tenderor / contractor only at his own
cost) ( EACH BLOCK)
8 08 Assistance in laying of PSC sleepers using TRT Each 2.00 10467.85 20935.70
machine including shifting of wooden battens
from the BRH to another BRH, removal of old
entangled / broken sleepers at picking unit /
conveyor belts / platform of TRT and setting
right new PSC entangled sleepers at conveyor
belt / NTI as directed by the Engineer-in-
charge without loss of time during TRT block
working with contractor's labour, tools and
plants etc. complete. A minimum of 12 men
(for this operation itself) shall be engaged per
block working day. (All labour and tools are to
be supplied by the tenderor / contractor only
at his own cost) EACH BLOCK
9 09 String lining the 60 kg 10 rail / 3 rail panels Running 409.00 30.05 12290.45
available on cess on either side of track Metre
starting from fixied joints as beginning of work,
points and crossing, bridge approaches, SEJs
etc. as required at the site including providing
gaps for insertion of glued joints, welding of
glued joints and rail joints etc. of rail panels of
130mts to 330mts along duly pulling or
pushing the rail panels on cess using
mechanical devices like rollers, winches etc.
without including permanent stresses or
damaging the rail panels and as directed by
the Engineer-in-charge. (All labour and tools
are to be supplied by the tenderor / contractor
only at his own cost)
WALTAIR DIVISION-ENGINEERING/ECOR
10 10 Short leading of released PSC sleepers from RM 409.00 102.38 41873.42
base depot to the nominated locations to
create working space in the base depot with a
Max. lead of 2 KM. by contractor's own means,
duly segregating Cl-II / Cl-III sleepers and
stacking in a countable manner with all lead
and lift etc. complete and as directed by the
Engineer-in-charge. (All labour and tools are to
be supplied by the tenderor / contractor only
at his own cost). Note: This item will be
operated only when the base depot is fully
filled with released / new PSC sleepers and
daily position of sleepers to be maintained.
11 11 Removing and refixing of the traction bond Each 16.00 39.47 631.52
from the running rails during the TRT work
without damaging the traction bond / bolts
and nuts using contractor's men and tools and
plants and as directed by the Engineer-in-
charge (All labour, materials and tools & plants
are to be supplied by the tenderor / Contractor
only at his own cost.) (EACH BOND)
12 12 releasing the same and inserting the PSC Each 2.00 2093.57 4187.14
sleepers in the closing point duly trucking out
steel / wooden sleepers with the contractor's
labour and as directed by the Engineer- in -
charge. (All labour, materials and tools &
plants are to be supplied by the tenderer /
Contractor only at his own cost.) EACH BLOCK
13 13 Unloading of released PSC sleepers complete Per 679.00 28.86 19595.94
with fittings from TRT at base depot, Sleeper
removing, opening out their fittings and
fastenings to separate each component &
stacking at nominated locations at base depot
with a lead up to 350m across the depot to
utilise full depot space leaving space for
stacking new sleepers. While unloading
unserviceable / broken sleepers shall be
segregated and Cl-III sleepers shall be stacked
in a countable manner. (All labour, materials
and tools & plants are to be supplied by the
tenderor / Contractor only at his own cost.)
14 14 Collection and transportation of all released MT 53.00 729.28 38651.84
rails, P Way fittings such as ERC's, liners,
rubber pads etc. available in TRT base depot /
work spot by dip lorry with a lead of 2km,
unloading and stacking neatly at specified
locations in countable manner with all lead
and lift etc. complete including crossing of
track when ever required and as directed by
the Engineer - in - charge with all lead and lift
etc. (All labour, materials and tools & plants for
truckking of materials are to be supplied by
the tenderor / Contractor only at his own cost.
except Dip lorry if required will be supplied
free by Railway)
15 15 Removing the joggled fish plates one day Per Joint 6.00 79.99 479.94
earlier to the operation of the TRT machine or
as directed by the Engineer-in-charge to
facilitate the working of TRT and refixing the
same after the completion of the TRT work at
the same location without causing any
damage to it with all lead and lift etc.,
complete directed by the Engineer- in - charge.
(All labour, materials and tools & plants are to
be supplied by the tenderor / Contractor only
at his own cost.)
WALTAIR DIVISION-ENGINEERING/ECOR
16 16 Fixing the Joggled fish plates / bend fish plates Per Joint 6.00 70.77 424.62
at new welds / specified locations duly
adjusting sleeper if required, fixing "C" clamps,
bolting of fish plates, removing and refixing of
ERC clips with GJ clips and modified GFN liners
under traffic condition with all lead and lift
etc., complete and as directed by the
Engineer-in-charge. The Joggled fish plate will
be supplied at SSE/P.Way Depot. (All labour
and tools and other consumable stores are to
be supplied by the tenderor / Contractor only
at his own cost.)
17 17 Providing complete arrangements for gas Each 2.00 3074.00 6148.00
cutting at TRT work spot and depot including
gas cutter, DA, Oxygen and gas cutting
equipment made available whenever required
for cutting of rails and obstructed rail pegs at
work spot and at depot for cutting of BFR
edges and assistance to TRT machines. (All
labour and tools and other consumable stores
are to be supplied by the tenderor / Contractor
only at his own cost.) EACH BLOCK.
18 18 Fixing of bridges between AT of modified Each 2.00 939.35 1878.70
TRT/BRM keeping them light to all during block
for safe passage of portal crane, dismantling
the same as and when required including
through patrolling of AT and bridges. The holes
including deployment of required labour
during block. (All labour and materials are to
be supplied by the tenderor / Contractor only
at his own cost.) EACH BLOCK
19 19 Loading PSC Sleepers into wagon BFR of TRT TRM 409.00 30.99 12674.91
in base depot by mechanical means including
properly stacking in layers by providing
75mmx75mmx3.0mm wooden batten in
between each layer of sleeper with
contractor's own labour, mechanical means
except wooden batten. (All labour, materials
and machinery are to be supplied by the
tenderor / Contractor only at his own cost.)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GuaranteeBond.pdf
ATTACHMENT
NEFTForm.pdf
ATTACHMENT
Annexure-VandAnnexure-VA.pdf
ATTACHMENT
Annexure-VI.pdf
ATTACHMENT
Annexure-VIA.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
Boardletter-Graduate-DiplomaEngineerRegards.pdf
ATTACHMENT
GCC-2022.pdf
ATTACHMENT
GCC-2022-ACS-1to10.pdf
ATTACHMENT
InstructionstoTenderers.pdf
ATTACHMENT
JPO-Circular-GuidelinesforprotectionofCables.pdf
ATTACHMENT
PoliceVerification.pdf
ATTACHMENT
TenderFormFirstSheet.PDFdocx.pdf
ATTACHMENT
Contractore-MB-RBguidelines.pdf
ATTACHMENT
P-WaySpecialConditions-1.pdf
ATTACHMENT
P-WaySpecialConditions-2.pdf
ATTACHMENT
P-WaySpecialConditions-3.pdf
ATTACHMENT
JYPLocations.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].