Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹12.8 L
EMD Value
₹13,000
Closing Date
6 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER, MEHSANA ELECTRICAL (R&B) DIVISION, MEHSANA
Providing Lift For Court Building Jotana (G+1 ) at Jotana, Dist-Mehsana. (Revised Estimate)
358103
07/03 OF 2026/2027
Open
Electrical
Works
Mehsana
12 documents required · 12 mandatory
₹900
Executive Engineer, Mehsana Electrical (R&B) Division, Mehsana
₹13,000
23 Oct 2026
23 Oct 2026
23 Oct 2026
6 Nov 2026
23 Oct 2026
120 days
Sr. Lift Item AMC Rate (To be quoted Per Total
No. No. as shown Item Column)
1 1 All-In-Service charges
No. After completion of free
maintenance period of one year.
10 For 10th year
11 For 11th year
12 For 12th year
13 For 13th year
14 For 14th year
15 For 15th year
(*) Capital cost: Capital cost for percentage of AMC rate is considered on the basis of
estimated rate or the quoted rate whichever is less.
Note :- The offer received for yearly maintenance will be dealt independently and
shall have no relevance with main work and
1. The lowest Bidder of lift installation work will have to agree. According to negotiated rate
on the basis of Govt. resolution no. RBD/EEW/e-file/16/2025/6368/Section N; Dtd. 17/09/2026,
whichever is lower.
2. The Lowest Bidder L1 (Lowest bidders) will have to sign Agreement for Yearly
Maintenance Contract after completion of One Year Free Maintenance Period from the
Date of License issued by the Lift Inspector or date of lift put to public use, whichever is
3. The Lowest Bidder L1 (Lowest bidders) will have to pay S.D./ F.D.R. @ 5% of Average
Rate of Yearly Maintenance Contract Value approved by the Deptt. and same will be
refunded after completion of 15 Years yearly maintenance contract. S.D. of Original work
i.e. lift installation work will be refunded only after entering into agreement for 15 Years
Yearly Maintenance Contract.
ALL-IN-SERVICE & MAINTANANCE: -
Name of Work : Providing Lift For Court Building Jotana (G+1 ) at Jotana, Dist-Mehsana.
(Revised Estimate)
1. The contractor shall provide free maintenance service including supply of necessary
spares and materials; regular servicing of elevator and attending breakdown calls
whenever required for the period of 12 ( Twelve ) Months from the date of taking over the
lift installation covered under the contractor beneficial or commercial use.
2. The contractor(s) should give his/their rate per year and for All-in-Service & Maintenance
Contract of Lift in schedule-B. The All-in-Service contract will remain in force for the
period of 15 ( Fifteen ) Years after completion of free maintenance period stated in Note-1
above. The offer of Tenderer for All-in-Service should included cost towards supply of
Necessary spares, materials, regular & break down services and overhauling of the
3. For All-in-Service Contract Whole Lift including additional accessories like Emergency
Devices, Safety Devices, Lamp/Luminaries/Fans in Lift Cabin and Machine Room, Battery
and related accessories, Intercom/Phone of the cabin etc will be part of All-in- Service
SIGNATURE OF BIDDER
Dy.Executive Engineer, Executive Engineer,
Electrical( R & B ) sub.Div. Mehsana Elect.(R& B) Division
Mahesana Mehsana
Scope of Work covered under
All in Comprehensive Maintenance & Service Contract
(1) The tender is liable to be ignored if complete information is not given there-in, or if the particulars
and data (if any) asked for in the schedule to the tender are not filled in.
.(2). An agreement is signed by him in the prescribed form within 10 (Ten) days of the receipt of letter
awarding the contract.
(3). The maintenance service will commence within 15 (Fifteen) days of the receipt of the letter
awarding the contract.
(4). the successful tenderer shall have to submit the security deposit for the execution and due
fulfillment of the AMC contract. No interest shall be paid on the said deposit.
(5). The security deposit shall be released to the Contractor on virtual completion of the AMC period.
(6). The contractor shall be responsible for engaging adequately trained personnel required for
providing good maintenance services.
(7). The staff of the contractor should possess sound health and be free from and diseases, especially
contagious and frequently recurring diseases.
(8). The contractor shall make his own arrangements for security and protection of his men and materials
and the completed work till the same are taken over by the Department.
(9). For repairing & maintenance works, the quoted rates shall be inclusive of all
materials, labors, Transportation & Packings, Preparation of surfaces, scaffolding, if any
execution of works as per the specifications and directions of the Engr. In Charge.
(10). The contractor has to obtain (l-Cards as prescribed) for all workers etc. for carrying out the work
and permission to work, if works are to be carried out on Saturday / Sunday/Holyday & during
(11). The contractor has to obtain working passes from department of the office to carry out the work at
(12). The tenderer should have been registered by the competent authority and' should have PAN
number, Service tax registration, Registration of the Agency under the Shops & Establishment Act,
License under the Contract Labour Act, PF registration with the Regional PF
Commissioner, ESI Registration, Workmen Compensation Policy as applicable.
(13). The tenderer should not be blacklisted by any Department of the Central or State Government or
any PSD or any other organization.
(14). Performance Security:
(i) The Contractor should furnish performance security to Ex. Engr. Baroda Electrical Division, R &
B Department Vadodara for an amount of 10% of the contract price of AMC per year valid up to
12 months from the date of implementation of AMC Contract, in the Form FDR from the
nationalized/Schedule Bank. The first payment will be released subject to the production of this
(ii) The proceeds of the performance security shall be payable to department as compensation
resulting from the Contractor's failures to complete its obligation under the contract.
(iii) The Performance Security Deposit would be refunded after the successful completion of AMC and
no interest would be paid.
(15) Maintaining the Lift to keep the equipment properly adjusted and in proper safe operating
condition by regular and systematically examining, adjusting, lubricating all parts / components,
including warranted repairs of replacement of machine, motor generator, controller and parts as
required including worm gears, thrust, bearings, break magnet coils or brake motors, brake shoes,
brushes, winding, commutators, rotating elements contacts, coils, resistance for operating and
motor circuits, magnet frames and other mechanical part due to wear and tear, using only genuine
and original parts (Manufactures invoice / Mark on parts shall be the proof the party being
genuine, use of in genuine parts with incorrect invoice, marks will be considered as breach of
contract.) Mark of parts and components will be got approved, if the original figments of
manufacturer’s do not exit.
(16) Renewing guide shoes ribs or guides rails when necessary to ensure smooth and quiet operation
and to keep the guide rails properly lubricated.
(17) Renewing all wire ropes as often as necessary to maintain the adequate factor of safety to equalize
the tension on all hoisting ropes and repairing or replacing conductor cable.
(18) Maintenance of hung ceiling light diffusers. light tubes and bulbs. Mirrors and cabin fans as well
as in machine room El. and Fixtures are also included in the scope of agency.
(19) Lubricating, servicing and checking of all components which should be done minimum once in a
month. The Executive Engineer/ Deputy Executive Engineer/ Engineer-in-charge can call back the
service of repairing crew any time during the month, during regular working hours as well as
during overtime hours and it will be obligatory on the part of agency to respond within 24 hours
after registration / intimation of call back. The Emergency Rescue devices and Emergency Lights
including Batteries are covered under Annual Maintenance Contract for any Kind of repair or
replacement during the maintenance period.
(20) Servicing, repairing and replacement of spare parts, etc. should be carried out with the knowledge
of authorized representative/s of Electrical Division and his signature should be obtained in token
of works carried out.
(21) Preventive repairs shall be attended to in a phased program and the Section Officer In charge shall
notify such maintenance closures to public.
(22) The contractor shall as far as possible, attend the call of the Engineer In charge quickly for such of
these items which are required to be done under the terms of contract. If no response to attend the
call is for the coming from the contractor within 48 hours till the report undertaking the work,
recovery calculated on hourly rate basis for the service contract would be recovered from him.
(23) The lifts under contracts should function satisfactory for the entire period of contract. The liit
installed shall be inspected once in three months by the Senior Engineer Personal of the firm
jointly with the Executive Engineer. Baroda Electrical Division. Baroda and suggestion and
premedical measures to bottle-neck, if any and for better functioning be sorted out the lift working
days are considered as 365 days per year and stoppage on account of maintenance and repairs are
allowed at 25 days in a year. The liquidated damages for closure for any more period, then
stipulated above shall be recovered Rs. 15.00 per day on daily rated basis by dividing the annual
contract price 365 days.
Maximum recovery will be 20% of the contract value It contractor does not attend the lift
within 10 days, then these10 days will be considered as notice period for termination of
contract for public interest.
After corned out all in service work satisfactory the contractor shall have to submit to
bill/invoice for the period for which all in service wont carried out payment will be made
on availability of grant / LOC as per Govt. Press.
The accepting authority or the Executive Engineer in charge of the work reserves the right
to terminate and/or suspend the contract at any time after giving 10 days notice of his
intension to do so which out assigning reasons thereof.
(24) A log book will be maintained for each lift and the record of work done for servicing, maintenance
and repairs, etc. will be recorded there in jointly by the contractor and Liftman In charge to keep
track of periodical work done in each lift. This will be considered basic record for all purpose for
all purposes including these specified in paras.
(25) All Legal Liability in case of passenger trap in the elevator, insurance, fire shall be covered in the
all-in-service contract and hence no subsequent claim in this regard shall be entertained.
The accepting authority or the Executive Engineer In-charge of the work reserves the right to
terminate and/or suspend the contract at any time after giving 10 days prior notice of his intension
to do so without assigning reasons thereof.
(26) Failure in lift equipments / parts due to variation in power supply will be in scope of lift agency.
Lift agency will have to install necessary protective devices for the same.
(27) Earthing provided at time of lift erection will be regularly maintained & monitored by lift agency.
SIGNATURE OF CONTRACTOR
Dy.Executive Engineer, Executive Engineer,
Electrical( R & B ) sub.Div. Mehsana Elect.(R& B) Division
Mahesana Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001 Prequalification Bid.doc-2.pdf
002 Tender Document And Technical Bid.pdf
G S T LTR.pdf
GR.pdf
Lift AMC Condition-PART IV After Price BID F.pdf
NIT -07 2026-27.pdf
PQ.pdf
STANDARD BIDDING DOCUMENTS.pdf
Tharav AMC ELECTRICAL NORMS GR DATE 17-09-2026.pdf
JOtana Court Lift DTP.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .