Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.7 LAccepted-AOC NIL | ₹46.7 L Quoted ₹47.8 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹48.2 L+₹43,025.80 (0.90%)Rejected-Finance | ₹48.2 L+₹43,025.80 (0.90%) | L2 | Rejected-Finance Not Being lowest Bidder |
| 3 | L3₹48.4 L+₹67,831.20 (1.42%)Rejected-Finance BAMPARBOTIA WARD P O P S TEZPUR DIST SONITPUR PIN 784001 | SONITPUR | ASSAM | 784001 | ₹48.4 L+₹67,831.20 (1.42%) | L3 | Rejected-Finance Not Being lowest Bidder |
| 4 | L4₹48.6 L+₹87,775.76 (1.84%)Rejected-Finance | ₹48.6 L+₹87,775.76 (1.84%) | L4 | Rejected-Finance Not Being lowest Bidder |
| 5 | L5₹48.7 L+₹94,527 (1.98%)Rejected-Finance | ₹48.7 L+₹94,527 (1.98%) | L5 | Rejected-Finance Not Being lowest Bidder |
| Sl No | Description | Qty | Unit | Shri Harendra Kumar Rai L4 | M/S B D ENTERPRISE L7 | M/S S K ENTERPRISES L5 | M/S SAIKIA ENTERPRISE L3 | Chinmay Traders L2 | M/S N S CONSTRUCTION L1 | M/S KAUSHICK CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down Chowkat or Frame with shutters (without taking off Shutter from the Frame) n exc. 1.50 Sqm complete all as specified and as directed. | 11 | Each | 215 ₹2,365 | 220 ₹2,420 | 240 ₹2,640 | 250 ₹2,750 | 200 ₹2,200 Lowest | 210 ₹2,310 | 260 ₹2,860 |
| 2.00 | Taking down Chowkat or Frame with shutters (without taking off Shutter from the Frame) exc. 1.50 Sqm but not exc. 4.00 Sqm Each, complete all as specified and as directed. | 4 | Each | 425 ₹1,700 | 370 ₹1,480 | 400 ₹1,600 | 390 ₹1,560 | 300 ₹1,200 Lowest | 380 ₹1,520 | 420 ₹1,680 |
| 3.00 | Taking down Shutters of any description, exc. 1.00 Sqm but not exc 2.00 Sqm Each and keep in Safe Custody for removing to store, complete all as specified and as directed. | 6 | Per Leaf | 150 ₹900 | 115 ₹690 | 130 ₹780 | 125 ₹750 | 100 ₹600 Lowest | 105 ₹630 | 140 ₹840 |
| 4.00 | Taking down Shutters of any description, not exc 1.00 Sqm Each, and keep in Safe Custody for removing to store, complete all as specified and as directed. | 3 | Per Leaf | 100 ₹300 | 60 ₹180 | 80 ₹240 | 70 ₹210 | 85 ₹255 | 51 ₹153 Lowest | 90 ₹270 |
| 5.00 | Taking down and Refixing Shutters of any description exc. 1.00 Sqm and not exc. 2.00 Sqm Each in the Same Opening after easing and adjusting complete all as specified and as directed. | 15 | Per Leaf | 220 ₹3,300 | 200 ₹3,000 | 260 ₹3,900 | 250 ₹3,750 | 180 ₹2,700 Lowest | 230 ₹3,450 | 280 ₹4,200 |
| 6.00 | Taking down and Refixing of shutters of any description n. exc 1.00 Sqm each in same opening including of taking down, easing, adjusting and refixing/renewal of builders hardware as required including renewal of unserviceable screws, etc.complete all as specified and directed. | 25 | Per Leaf | 195 ₹4,875 | 100 ₹2,500 Lowest | 180 ₹4,500 | 170 ₹4,250 | 160 ₹4,000 | 165 ₹4,125 | 190 ₹4,750 |
| 7.00 | Taking down existing aluminium shutter of area exc 1.0 Sqm but not exc 2.00 Sqm and refixing the same in the same opening after reparing and make functional including replacement of fittings, roller,lock and fixture for proper functioning as required all as specified and as directed. | 4 | Each | 1,280 ₹5,120 | 1,000 ₹4,000 | 1,266 ₹5,064 | 1,260 ₹5,040 | 850 ₹3,400 Lowest | 1,230 ₹4,920 | 1,275 ₹5,100 |
| 8.00 | S&F 2nd class hard wood plain, solid, striaght in chowkats and framed rebated on the solid rounded or chamfered put together with glue pinned at joints including making rebate for fixing second shutter as per site requirement.complete all as specified and directed | 0.09 | Cum | 98,000 ₹8,820 | 97,500 ₹8,775 | 98,500 ₹8,865 | 98,000 ₹8,820 | 75,000 ₹6,750 Lowest | 97,000 ₹8,730 | 96,500 ₹8,685 |
| 9.00 | M&L Pressed steel frames for doors with one or more rebates size of frame 125 x 60 mm including necessary fixing lugs, hinges, lock strike plate, etc., complete, as specified, supplied and fixed complete all as specified and directed.
Note :- Pressed Steel Frame should be filled with PCC 1:3:6 Type C-0 (Using 12.50mm graded stone aggregate) and cost of PCC shall be deemed included in quoted rate | 10.4 | RM | 440 ₹4,576 | 580 ₹6,032 | 600 ₹6,240 | 590 ₹6,136 | 1,000 ₹10,400 | 422 ₹4,388.8 Lowest | 700 ₹7,280 |
| 10.00 | S&F Flush Shutters 30 mm thick, Solid Core Construction with Block Board Core and Plywood Face Panels, Commercial type on Both Sides, complete all as specified and as directed. | 55 | Sqm | 1,915 ₹1,05,325 | 1,800 ₹99,000 | 2,200 ₹1,21,000 | 2,050 ₹1,12,750 | 2,200 ₹1,21,000 | 1,925 ₹1,05,875 | 1,770 ₹97,350 Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
10 Jul 2026, 6:00 pmClosed
GE South Tezpur
GE South Tezpur Mission Chariali
WELCOME MAINT INCLUDING E/M SERVICES OF MD OFFRS ACCN AT ZONE-1B, 1C AND ZONE 5 AT SAA UNDER GE (S) TEZPUR
2026_MES_773618_1
9119
Open Tender
Civil Works
Item Rate
270 days
GE South Tezpur
as per NIT
4 documents required · 4 mandatory
₹500
GE South Tezpur
₹98,000
Yes
10 Sept 2026
19 Jun 2026
14 Jul 2026
19 Jun 2026
10 Jul 2026
3 Jul 2026
19 Jun 2026 - 26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Chowkat or Frame with shutters (without taking off Shutter from the Frame) n exc. 1.50 Sqm complete all as specified and as directed. | 11 | Each | - | - |
| 2 | Taking down Chowkat or Frame with shutters (without taking off Shutter from the Frame) exc. 1.50 Sqm but not exc. 4.00 Sqm Each, complete all as specified and as directed. | 4 | Each | - | - |
| 3 | Taking down Shutters of any description, exc. 1.00 Sqm but not exc 2.00 Sqm Each and keep in Safe Custody for removing to store, complete all as specified and as directed. | 6 | Per Leaf | - | - |
| 4 | Taking down Shutters of any description, not exc 1.00 Sqm Each, and keep in Safe Custody for removing to store, complete all as specified and as directed. | 3 | Per Leaf | - | - |
| 5 | Taking down and Refixing Shutters of any description exc. 1.00 Sqm and not exc. 2.00 Sqm Each in the Same Opening after easing and adjusting complete all as specified and as directed. | 15 | Per Leaf | - | - |
| 6 | Taking down and Refixing of shutters of any description n. exc 1.00 Sqm each in same opening including of taking down, easing, adjusting and refixing/renewal of builders hardware as required including renewal of unserviceable screws, etc.complete all as specified and directed. | 25 | Per Leaf | - | - |
| 7 | Taking down existing aluminium shutter of area exc 1.0 Sqm but not exc 2.00 Sqm and refixing the same in the same opening after reparing and make functional including replacement of fittings, roller,lock and fixture for proper functioning as required all as specified and as directed. | 4 | Each | - | - |
| 8 | S&F 2nd class hard wood plain, solid, striaght in chowkats and framed rebated on the solid rounded or chamfered put together with glue pinned at joints including making rebate for fixing second shutter as per site requirement.complete all as specified and directed | 0.09 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tenderdocuments.pdf
Tender Documents • 1.63 MB
Addldocus.pdf
Additional Documents • 0.16 MB
BOQ_866227.xls
BOQ • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .