Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | -10.77% | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹4.2 L (4.18%)Admitted-Finance | -7.04% | ₹1.0 Cr+₹4.2 L (4.18%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹8.3 L (8.26%)Admitted-Finance | -3.40% | ₹1.1 Cr+₹8.3 L (8.26%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹14.4 L (14.3%)Admitted-Finance | +2.00% | ₹1.1 Cr+₹14.4 L (14.3%) | L4 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
12 Sept 2026, 4:00 pmClosed
XEN PWD Division Nowshera
XEN PWD Division Nowshera
Repair and Restoration of Menka Mahadev Temple
2026_PWDJK_323476_4
enit 88 of 2026-27
Open Tender
Civil Works
Percentage
Nowshera
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
XEN PWD Division Nowshera
₹2.2 L
XEN PWD Division Nowshera
19 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metre All kinds of soil 80% and 20% hard rock | 91 | Cum | 367.65 | ₹33,456.15 |
| 2 | Coursed Rubble Masonry with hard stone in foundation and plinth and curing complete with Lime mortar 1:1:1 (1 Lime putty: 1 Surkhi: 1 Fine sand) 2nd sort | 95 | Cum | 9,236.4 | ₹8,77,458 |
| 3 | Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level including curing complete with Lime mortar 1:1:1 (1 Lime putty: 1 Surkhi: 1 Fine sand) | 86 | Cum | 10,667.65 | ₹9,17,417.9 |
| 4 | Providing and laying in position lime concrete with graded stone/ brick aggregate 40 mm nominal size and 40% mortar comprising of 1:1:1 (1 lime putty: 1surkhi: 1fine sand) including curing complete but excluding cost of centering andshuttering. All works upto plinth level with: Graded Stone Aggregate | 6 | Cum | 4,389.3 | ₹26,335.8 |
| 5 | Pointing on stone work with cement mortar 1 : 3 (1 cement/Lime putty : 3 fine sand) Raised and cut pointing | 279 | Sqm | 541.7 | ₹1,51,134.3 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:4:8 (1 cement/lime putty : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4 | Cum | 5,202.9 | ₹20,811.6 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5 | Cum | 7,788.4 | ₹38,942 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level & above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,790 | Kg | 123.2 | ₹3,43,728 |
| 9 | Centring and Shuttering including strutting, propping etc and removal of form work for Foundations: footings, bases of columns etc. for mass concrete. | 39 | Sqm | 286.35 | ₹11,167.65 |
| 10 | Centring and shuttering including strutting , propping etc. and removal of form work for Suspended floors, roofs, landing, balconies and access plate form | 18 | Sqm | 718.2 | ₹12,927.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1088888.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .