Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
23 Jul 2026, 6:00 pm
Chief Engineer [C & O], Wanakbori TPS
Supply and application of HVOF (High velocity oxy flame) thermal spray coating in various locations of boiler unit-8 at WTPS.
319274
WTPS/S/ET/02/2026/SUPPLY-22 RFQ NO 76895M
Open
Miscellaneous Goods
Kheda
7 documents required · 7 mandatory
₹5,900
GUJARAT STATE ELECTRICITY CORP. LTD. [NEFT/RTGS/online payment -PAYABLE AT BANK OF BARODA WTPS BRANCH]
₹2.5 L
3 Jul 2026
3 Jul 2026
3 Jul 2026
23 Jul 2026
3 Jul 2026
Subject: Supply and application of HVOF (High velocity oxy flame) thermal spray coating in
various locations of boiler unit-8 at WTPS.
Reference No:- WTPS/S/TECH/RFQ- 76895M/BMD-8
HSN With Cess Quantity
Sr. No. Description of materials UOM
CODE If Any IN Required
Works (Part – A)
Charges for the anti-erosive thermal spray
1 coating by HVOF on furnace water wall
burner corner area
BOILER TUBE COATING MATERIAL :
2 CHROMIUM CARBIDE BASED POWDER :
CR2C2 + 25 NICR
The overall L1 will be considered as WORKS (PART-A) + SUPPLY (PART-B) = L1 (Total End
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
Sub: Supply and application of HVOF thermal spray coating in various locations of boiler unit-
1. Base Material: Tube dia 38.1 mm x 5.59 mm thk ,SA 213 T12
2. Wear resistance: The coating alloy surface structure and high hardness of coatings should be
excellent adhesive, abrasive and erosive wear resistance.
3. Corrosion Resistance: Alloy coating would spontaneously passivate in the presence of air or
oxidizing environments. Alloy coating should be very resistant to sulfidation in boilers and
provide excellent corrosion resistance to alkaline and oxidizing acid environments.
4. High Temperature performance: Alloy coatings should be maintaining good hardness at
elevated temperatures. The hot hardness properties provided erosion and corrosion resistance
to even at high temperature.
5. Resistance of thermal cycling: Thermal sprayed alloy should be solidifies under compression
offering high bond strength and excellent corrosion resistance to thermal cycling.
6. No heat affected zone: Thermal spray coating processes will not introduce a microstructure
change risking cracking that could propagate into the boiler tube. And co-efficient of thermal
conductivity and expansion should be similar to SA 213 T12 grade.
7. Scaffolding if required shall be in scope of GSECL.
8. HVOF applied on Water wall burner corner area on to the boiler tube by application & boiler
9. Surface preparation by Grit blast to achieve an acceptable profile.
10. Thermal spray coating by HVOF of minimum 200 -225 MICRONS coating in accordance with
quality assurance procedure, to designated areas on boiler water wall area. After application of
thermal spray ,Hardness of metal spray coating should be achieved coating hardness 60HRC to
70 HRC(Min 60 HRC to be achieved at any condition)
11. Thermal spray coating thickness will be checked jointly with GSECL engineer (at min 3 places)
if any deviation noticed same is to be rectified.
12. Cleaning and site clearance.
13. All the above process should be carrying out in presence of Party‟s technician and engineer.
14. Work Schedule: Party shall have to complete the work within stipulated time period of
Shutdown/Short shutdown by keeping the man power round the clock after necessary
replacement of thinned / reduced thickness boiler tubes.
15. Mobilisation period: Party shall have to mobilise the manpower with machineries within 7 days
on intimation from any of method of communication.
16. Coating material should be routed through main store, WTPS.
17. Warrantee Period: 24 Months (Twenty Four) from date of application of thermal spray (HVOF).
Party shall have to warrants that the work will be done free from defects in workmanship.
18. Coating warrantee: During annual inspections, any coating found damaged or removed, will be
re-coated to withstand the above warrantee span of 24 months (Twenty four) from the date of
completion of coating.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
19. The Time Limit for the Work Contract will be 18 Months from the Date of Commencement of
work. The GSECL reserves Right to extend this Contract for further period as deemed suitable
with the same Rates, Terms and Conditions.
20. The period of completion of overhaul of unit shall be intimated to the party by EIC as per SLDC
schedule for AOH/COH excluding the mobilization period of 07 days .Validity of this work is
months from the date of commencement letter
21. Prior approval from the applicable IBR authority shall be obtained by the contractor before
execution work involving the application of boiler tube coating material: Chromium Carbide
Based Powder (CR2C2 + 25% NiCr). The work shall commence only after receipt of the
required approval.
1. SCOPE OF PARTY:
Description Unit Qty
1 HVOF material (Cr3 C2 +25Ni Cr) As per requirement
2 HVOF coating systems with all require accessories. --- Do ---
Blasting machines with all required hoses and accessory with
Blasting Nozzles.
Miscellaneous spares like gun tips, washer, spray plate,
valve, Oil & Steam hose pipe etc.
5 Tool box: For HVOF machine and blasting units. --- Do ---
2. SCOPE OF GSECL:
Description Unit Qty Free/Chargeable
Electricity and service air at single
1 As per requirement Free
point nearer to work site
2 Necessary scaffolding for this work As per requirement Free
3 Accommodation As per availability On chargeable
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
OTHER GENERAL SCOPE OF WORK
Testing / checking of contractor’s T&P & Electrical equipment inside plant premises:
1. This testing / checking is in addition to whatever tests / checks the contractor might have got done
before entry in to plant premises.
2. During annual shutdown time many major activities shall be scheduled other than metal spray
work. For metal spray work GSECL will not guarantee availability of ID fans, as shutdown job taken
on this system also. Party to make their own arrangement for their comfort level for continuous
working environment without ID Fans during metal spray application work. Max. Efforts shall be put
for ensuring ID fans availability.
The contractor should schedule the job round the clock to complete the work in stipulated time
period by engaging sufficient manpower, materials and tools & tackles at site. The contactor should
bring sufficient extra equipment and spares to avoid un interruptions of work and to ensure
healthiness of their equipment for timely completion of work.
Quantum of job mentioned against tender items is indicative only & may vary as per site
requirement and not to be construed as maximum or guaranteed quantity.
TERMS & CONDITIONS OF WORKS:
1. The Time Limit for the Work Contract will be 18 Months from the Date of Commencement of
work. The GSECL reserves Right to extend this Contract for further period as deemed suitable
with the same Rates, Terms and Conditions.
2. The period of completion of overhaul of unit shall be intimated to the party by EIC as per
SLDC schedule for AOH/COH excluding the mobilization period of 07 days .Validity of this
work is 18 months from the date of commencement letter.
3. The Scope of Works with Each Major Jobs to be carried out are given with Special Conditions of
Contract shall be read in Conjunction with the General Conditions of Contract, Specifications of
Works, Drawings and any Other Documents forming Part of this Contract wherever the Contract so
requires, Separate Section or Part of Each Works shall be deemed to be Supplementary to
Complementary to every other Part and shall be read with and in to the Contract so far as it may
be Practicable to do so.
4. All the Works / Jobs should be carried out as per the Instruction and Specified Scopes under direct
supervision and entire satisfaction to Engineer in Charge. All the Materials Account should be
maintained Works wise so that Payment can be made accordingly and strictly as per Actual Work
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
5. Party has work in harmony with the Maintenance Staff and Operation Staff and other Agencies
working in the area. Non cooperation in this regard will be viewed very seriously and in case of
Dispute, the Decision of EIC shall remain binding to the Agency as well as BMD-8.
6. The Party has to commence the Works after ensuring the Issue of the Line Clear by the concerned
Department. It is the Prime Responsibility of the Party to take Care in these regards of Safety
7. The Party shall have to do all Related Works as per Site Requirements and as per instruction of
Engineer in Charge. Party has to arrange of his own all types of Tools and Tackles adequate for
the Works including Skilled and Experienced Supervisors, Technicians, Welders, Riggers,
Foremen, Electricians etc to meet Scheduled Overhauling within Time Limit.
8. Electrical Connection and Energy Consumption will be given Free of Charges. The lighting is to be
arranged by the Party. The GSECL shall make Arrangement for providing Power Supply to the
Contractor for working their Equipments, Tools etc. as and when required as decided Locations /
Points by Engineer in Charge. ICTP Switches and ELCB‟s may be arranged by the Contractor.
Further Distributions shall be at the Cost of Contractor. Floods for Lighting will be arranged by
GSECL as and where required. However, Contractor shall arrange 100 Watts / 24 Volts Bulbs at
9. The Scope of Works includes Carting of Materials form the GSECL Main Store / Sub Store as the
case may be if applicable and as directed by GSECL Engineer for which no Extra Payment shall
be made for Transportation.
10. The Contractor shall maintain the Tools / Tackles such as Chain Pulley Blocks, Welding Generator
Sets, Hook-Chooks, Wire Slings, Spanners, Gas Cutting Sets, Welding Accessories, Grinding
Machines, drilling machines etc., Equipments and Machines required for handling this Contract in
working Conditions at their Cost in such a way that All Works should be completed within
Stipulated Period only. Overhead Cranes provided in plant for lifting purpose can be utilized Free
of Charge if available otherwise Contractor has to arrange Alternative Arrangement at their Cost.
Delay in Working for Want of Above will be viewed seriously.
11. All other items which are not listed but required to carry out this work will have to do without any
12. Air, Water, Electrical Supply, OEM Tools / Tackles etc. will be given Free of Charges by GSECL at
Single Point as decided by the EIC.
13. GSECL will provide Workshop Facility together with Operator in GSECL Workshop premises Free
of Charge as and when required and as decided by the Engineer in Charge as the case may be.
To and Fro Transportations of Spares / Materials for Repair at Workshop will have to be arranged
at Contractor‟s Cost.
14. For Shifting / Lifting of Heavy Materials and Transportation, Mobile Crane, Trailer, Tractor, Trucks
etc. should be arranged by the party itself, there is no any extra charges given for transportation
15. All the Removed Materials are to be credited / disposed off as per the instructions of Engineer in
16. The Contractor shall have to arrange to remove the Day to Day Scrap Materials from Site and
credit to GSECL Main Store / Site Store as per instruction of Engineer in Charge. The Site must
have to be cleared before Starting / Commissioning of Equipments / Unit; otherwise the Amount of
Expenditures Actually incurred will be recovered from Contractor‟s Bill without assigning any
reason in the Event of Non-removal of Scraps.
17. Party has to collect and credit Balance Materials after Completion of Work from / to GSECL Main
Store or Site Store as per instruction of Engineer in Charge, if Materials are to be supplied by
GSECL Free of Cost. Contractor should be ready to start the Work at once when the Contract is
awarded to him. For Fabrication and Assembly etc. other required Materials should be collected
from Main Store / Site Store and made available well in advance to meet the Requirement as the
case may be before Commencement of Work. A Delay in Commencement will lead to Cancellation
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
18. After Synchronization of Unit / Re-commissioning of Equipment / System, if any Problems arise for
the Works carried out, it shall have to be set right by the Contractor without any Extra Charges to
the GSECL. Contractor should attend Any Defect Contributory to their Faulty Workmanship during
the Trial Run and Re-commissioning of Equipment / System / Unit, and set Right without any Extra
Charges to the GSECL. If Rectifications is not carried out in Time as instructed by Engineer in
Charge, the same shall be carried out by GSECL by engaging GSECL Staff or Any Other Agency
and Cost of which will be recovered including Supervision Charges from the Contractor‟s Bill as per
Company‟s Rules.
19. The Time is the essence of the Contract and Party have to ensure that the Work has to be
completed within Stipulated Period, calculated from the Date of L/C issued keeping Man Power
round the Clock and if required necessary the additional resources are to be mobilized.
The Contractor can arrange Pre-Arrangement i.e. Before Shutdown like Shifting / Lifting of
Materials from Stores to Working Floor and made Available after Finishing Ready to expedite the
Works in Time Limit Schedule. This Advance Arrangement Period shall not be considered /
included in Time Limit Period.
20. As this Works being a Risky Job, if any Fatal / Non Fatal Accident or Occurrence happens,
Corporation is not responsible for Any Kind of Legal Liabilities and Workmen Compensation; only
the Contractual Party is responsible for Legal Compliance and any Compensation thereof.
21. The Payment will be done for Actual Work done only.
22. All General Terms & Conditions as per Corporation‟s Standard Format applicable to this Contract.
GENERAL TERMS & CONDITIONS:
1. The Contractor has to visit the Site and familiarized themselves thoroughly with the Site
Conditions, Equipments and Systems before submitting the Tender. For Site Visit, the Tenderers
may contact Engineer in Charge of Site office with Permission of undersigned on any Working Day
during Working Hours before submitting the Tender.
2. The Materials, Design and Workmanship shall satisfy the relevant Indian Standard. The Job
Specification contained herein and Code referred to where the join Specification Stipulate
Requirements in addition to these contained in the Standard Code and Specifications, these
Additional Requirements shall be satisfied.
3. Contractor shall comply with the Factory Acts, Labour Laws and Safety Laws in force and
amended from time to time.
4. Any other Rules and Regulations, Conditions etc. that are in force at present and that may be
framed by the GSECL from time to time in connection with the Contracts will be binding and
acceptable to the Contractor.
5. Party has to furnish the Documents for Insurance of Workmen, Labours License and other Account
Section Formalities before starting the Works, failing to which Contractor shall not be allowed to
commence the Work.
6. If Successful Contractor fails to pay the required Security Deposit and does not come forward to
execute the Work, the full value of EMD paid will be forfeited by the GSECL.
7. Party should submit PERT Chart and BAR Chart well in advance and should get it approved by the
Engineer in Charge before Commencement of the Work. The Work should be positively completed
in time. Any Delay will not be tolerated.
8. The Contractor should authorize the Qualified Authentic Representative to GSECL who in turn will
collect the Material, Works Permit and remains available at Site to receive instructions from
GSECL Engineer in Charge to execute the Works. All Formalities as per GSECL‟s Procedure are
to be obeyed by Representatives of Contractor.
9. The Contractor should intimate the Names and Addresses of their Authorized and Responsible
Representative so that they can be contacted when required in connection with execution of the
said Works. The Contractor should also be present to report the Work Daily to Engineer in Charge
and receive necessary Instructions. If the Contractor does not remain present then their Contract
will be terminated as Execution can‟t be allowed in absence of the Contractor.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
10. Overhauling / Work Program shall be drawn up mutually by the GSECL Engineer and Contractor
based on the Availability of Work Front and keeping in view the Scope of Works. The Contractor
shall scrupulously adhere to their Schedule by arranging Adequate Skilled Personnel and Working
Tools Tackles. The Progress achieved against the Work Plan for Each Day shall be summarized
by the Contractor and he shall submit it as a Daily Progress Report to the Engineer in Charge
positively by 16.00 Hrs. with details of labour engaged for monitoring the Progress of Work.
11. Party shall have to complete the Works within Stipulated Time Limit by engaging Proper Adequate
Personnel working round the clock if required. The Works will have to be commenced immediately
on Short Notice as and when shutdown is arranged and as per GSECL‟s Requirement without fail.
12. For Shifting / Lifting / Transportation of Heavy Materials, Mobile Crane, Trailer, Tractor, Trucks, etc.
should be arranged by the Contractor at their cost as GSECL have no any such Facility available
13. The Party shall have to do All Related Works as per Site Requirement and as per Instructions of
Engineer in Charge. Party has to arrange of their Own Adequate All Types of Tools Tackles
required for the Works including Skilled and Experienced Engineers, Supervisors, Technicians,
Welders, Riggers, Foremen, Electricians, Helpers for the Continuous Works round the clock to
meet Scheduled Overhauling / Works within Time Limit. Works should be carried out in Proper
Way and in Co-Ordination with Each / Other Works / Agency so that Works should not suffer.
14. Contractor shall indemnify GSECL against for any Injury and / or Damages that may be caused in
their Men or Material. Moreover, the Contractor shall be Fully Responsible for any Damages
caused to the GSECL‟s Properties / Men done by their Men / Materials while executing the Work.
The GSECL will be entitled to recover the Damages from the Party at an Actual.
15. At Any Time if GSECL feels that Progress of Works is Unsatisfactory and Work Force of Contractor
is Inadequate, other Agencies / Departmental Personnel will be put in parallel for expediting the
Works. Amount so incurred will be recovered from the Contractor‟s Bill. In their case the Decision
of the Engineer in Charge shall be final and binding to the Contractor.
16. Whenever Contractor brings Material from Outside the P/H Premises, he must get an Entry Pass
Separate for Tools / Tackles / Machinery and Consumable Items and he should produce One Copy
of Such Entry Pass to Concern Department for their Verifications / Records.
17. As this being a Risky Job, if any Fatal / Non Fatal Accident or Occurrence happens, Corporation is
not responsible for any kind of Legal Liabilities and Workmen Compensation; only the Contractual
Party is responsible for Legal Compliance and any Compensation thereof.
18. Party shall submit Material Account along with Bills in Triplicate.
19. Payment will be made for actual work done only.
20. GSECL shall provide the Open Space at Appropriate Place in Plant Area suitable for keeping
Materials, Tools, Equipments, etc. and for making Temporary Office. On Expiry / Completion /
Termination of Contract, Contractor shall have to vacate the Premises immediately after Work
completed satisfactorily otherwise the Rent will be recovered as per GSECL‟s Rules if not vacated
21. GSECL will try to give Residential Accommodation on Chargeable Basis as per Rules to the
possible extent depending upon the Availability. But there will not be the Right of Contractor. The
Quarter is to be vacated immediately as soon as the Work is completed satisfactorily. Contractor
shall make their Own Full Proof Arrangement of Storage of Spares / Consumables, Tools Tackles,
etc. required for O/H & Works and shall be responsible for Safe Custody of Such Items at their Site
/ Store. In case of Theft / Lost / Damage of Such Items while in possession of Contractor, Such
Materials are to be replaced Free of Cost by the Contractor to the GSECL.
22. Subletting the Contract to other Agency is not permitted unless and otherwise approved by the
Competent Authority.
23. For any Ambiguity and Conflict, the Decision of the Chief Engineer (C&O), GSECL, WTPS shall be
final and binding to the Contractor.
24. The GSECL reserves the Right to terminate the Contract at any Time without giving Notice of
Termination or any Reason and entertaining of Claims / Compensations.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
25. The Party has to pay security deposit of 5% of contract value within 10 days from the date of Letter
of intent. It is mandatory to submit security deposit before order placement.
26. The contractor shall have to execute Agreement on stamp paper of Rs. 300/- and indemnity bond
on stamp paper of Rs. 300/- in the prescribed form before commencement of the work. The cost of
the stamp papers shall be borne by contractor.
Medical Health check up:
Contractor has to get the pre employment Medical check-up test done of his its workers as per
1. X-ray chest (PA) view in 14 X 17 inch plate with reporting by qualified Radiologist. (Maximum up
to Rs. 300/- per worker once during contract period).
2. Pulmonary function test (Maximum up to Rs. 200/- per worker once during contract period).
3. Audiometry in sound proof cabin with reporting by qualified audiologist. (Maximum up to Rs.
200/- per worker once during contract period).
4. Random blood sugar report, complete blood count & urine R/M. (Maximum up to Rs. 200/- per
worker once during contract period).
5. Clinical examination & consultation charge for qualified doctor having minimum MBBS with
CIH/AFIH degree for issuing fitness certificate (Maximum up to Rs. 100/- per worker once
during contract period).
Terms & Conditions for Reimbursement:
1. Health check-up bill shall be reimbursed once during total contract period maximum up to Rs.
1000 or actual cost per worker / labour / person, whichever is minimum after verification &
recommendation by concern doctor. In case any worker left the work in between than for
replacement Worker Company will not provide any reimbursement, however it is compulsory to
submit new reports of replacement worker for fitness certificate at contractor‟s own expenses.
2. For Periodic Medical examination, No reimbursement for periodic medical examination to be
given to contract employee for whom GSECL is conducting period medical examination at
company‟s cost at WTPS level. If contractor fails to undergo periodic medical examination, they
have to undergo prescribed investigation as per hazard analysis from outside. No
reimbursement to be given for these investigations.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
Name of Work: Supply and application of HVOF(High velocity oxy flame) thermal spray coating in
various locations of boiler unit-8 at WTPS
(I) For technical bid, the following documents are to be submitted by the tenderers:
A. Technical document
Invariably & without which technical bid will be liable for rejection.
(II) For technical bid, the following documents are to be submitted by the tenderers
Bidders remark regarding
Proposal PQR submission of document in soft
as well as hard
1. The bidder should produce certificate / document as
evidence for experience of having successfully
completed same works (i.e. HVOF thermal spray
coating) carried out satisfactorily for minimum
(one) year in last 07 (seven) years period in Thermal
power stations having a unit capacity of 210 MW &
above of government / semi government / state
electricity board / Corporation body / Private Limited
Company / Public Limited Company having
Single same Order of 65,66,321.00 during last seven
years from the date of Publication of Bid.
Two same orders each of 41,03,951.00 during last seven
years from the date of Publication of Bid.
Three same orders each of 32,83,161.00 during last
seven years from the date of Publication of Bid
B Financial qualification criteria: B.
1) The Average Annual Turnover of the bidder, shall not
be less than Rs. 24,62,371.00 during the preceding
three (3) financial years as one date of Techno-
Commercial bid opening.
2) Net worth of bidder shall not be less than 100% of
the bidder‟s paid up share capital as on the last day
of the preceding financial year. In case the Bidder
meets the requirement of Net worth based on the
strength of its Subsidiary (ies) and/or Holding
company and/or Subsidiaries of its Holding
Companies wherever applicable, the Net worth of
the Bidder and its Subsidiary (ies) and/or Holding
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
company and/or Subsidiary (ies) of the Holding
Company, in combined manner should not be less
than 100% of their total paid up share capital.
However individually, their Net worth should not be
less than 75% of their respective paid share
capitals. For Consortiums / joint ventures, wherever
applicable, the New worth of all Consortiums Joint
venture members in combined manner should not
be less than 100% of their paid up share capital.
However individually, their net worth should not be
less than 75% of their respective paid up share
Net worth in combined manner shall be
calculated as follows:
Net worth (combined )=
(x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2,
x3 are individual net worth which shall not be
less than 75 % of the respective paid up
share capitals and y1, y2, y3 are individual
paid up share capitals.
3) In case the bidder is not able to furnish its audited
financial statements on stand-alone entity basis,
the unaudited unconsolidated financial statements
of the bidder can be considered acceptable
provided the bidder further furnishes the following
documents for substantiation of its qualification.
Copies of the unaudited unconsolidated
financial statements of the bidder along with
copies of the Audited consolidated financial
statements of its Holding Company.
A Certificate from the CEO/CFO of the
Holding Company, stating that the unaudited
unconsolidated financial statements form part
of the Consolidated Annual Report of the
4) In cases where audited results for the last
preceding financial year as on the date of techno-
commercial bid opening are not available, the
financial results certified by a practicing Chartered
Accountant shall be considered acceptable. In
case, Bidder is not able to submit the Certificate
from practicing Chartered Accountant certifying its
financial parameters, the audited results of three
consecutive financial years preceding the last
financial year shall be considered for evaluating the
financial parameters. Further, a Certificate would
be required from the CEO/CFO, stating that the
Financial results of the Company are under audit
as on the date of Techno-commercial bid opening
and the Certificate from the practicing Chartered
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Accountant certifying the financial parameters is
5) The bidder must submit Average annual turn over
and net worth certificate in support of financial QR,
duly certified and verified for authenticity from
independent statutory auditor of their
company/Practicing chartered accountant/C.A
Firms/TPIA(Third party inspection agency)
empanelled approved by GSECL along with annual
audited Accounts of last three years
Note for point No.1, 2, 3 &4:
i. Other income shall not be considered for arriving
at annual turnover.
ii. “Holding Company" and “Subsidiary Company”
shall have the meaning ascribed to them as per
Companies Act of India, in vogue.
iii. Net worth means the sum total of the paid up
share capital and free reserves. Free reserve
means all reserves credited out of the profits and
share premium account but does not include
reserves credited out of the revaluation of the
assets, write back of depreciation provision and
amalgamation. Further, any debit balance of Profit
and Loss account and miscellaneous expenses to
the extent not adjusted or written off, if any, shall
be reduced from reserves and surplus.
C. Other Requirements:
Bidder should have a separate valid GST registration
number and PAN Number.
Details of P.F. code No. from the appropriate provident
fund authorities and details of P.F. paid to the employees
for last six months. Certificate of separate provident fund
account number.
The Bidder must submit Performance Certificate(issued
directly by the Utility) against the different PO s executed.
Bidders shall be required to submit all the documents, in
3 support of Technical QR (such as copy of Purchase
Orders / Work Orders / Contract Agreements, Client
Certificate etc.) duly certified and verified for authenticity
from independent Statutory Auditor of their Company.
Labour License for Labour Contract: The contractor on
getting the work order but before starting the work shall
4 have to furnish the copy of Labour License under the
Contract Labour (Regulation & Abolition) from the
appropriate authorities. Also required workman group
insurance policy covering labour engaged.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
5 The Bidder must submit details of minimum tools,
tackles and equipment‟s relevant to the job.
6 Tender fee & EMD will be applicable as per NIT.
Special Contract Condition :
Details of registered partnership deed in case of
1 partnership firm and activities of association and
memorandum of association in case of company.
Party has to produce copy of group insurance (Workman
compensation policy) prior to work execution for all labors
engaged against awarded contract for subject work. Party
has to give acceptance for the same.
Assurance for Unconditional Tender with technical bid
Certified copies of last three years audited annual account
i.e. profit & loss account and Balance sheet if the
estimated cost of the tender exceeds Rs. 100 lakhs. If the
4 party is a proprietary party and not required to get annual
account audited under the law, a copy of Income Tax
return or certificate from practicing Chartered Accountant
certifying the “Profit & Loss account” should be submitted.
Above Technical bid documents are to be submitted at once. Late submission of documents after
opening of tender will not be accepted, unless asked by the GSECL
(II) Instructions to Bidder:
1. GSECL reserves right to split the contract.
2. Chief Engineer(C&O), Wanakbori TPS reserves right either to accept or reject any or all tenders
without assigning any reasons.
3. Subletting of ordered work is not permitted.
4. Bidders must have sufficient numbers of qualified and experienced Supervisors / Welders / Fitters
and team of persons to complete the work in scheduled time.
5. Bidder should also quote the MR / DD no. on tender cover for payment of EMD.
6. Tender without payment of EMD will not be opened or considered.
7. Bidder has to sign on each page of the bid with seal.
8. Assurance for Unconditional tender on envelope of technical bid itself.
9. Validity for the offer must be for minimum 120 days from the tender opening of technical bid.
10. Security Deposit: It is mandatory to submit security Deposit before order placement. Party shall
have to pay security deposit of 5% of contract value within 10 days from the date of letter of intent.
Such Security Deposit will be payable either in D. D. / Bank Guarantees. Bank Guarantees from
Scheduled / Nationalized Banks will be acceptable if the amount of security Deposit payable
exceed Rs. 5,000/-.
The Bank Guarantees will be executed on the standard form prescribed by the corporation. In case
of the Bank Guarantees furnished / submitted they should have clear one time validity till the
completion of the order in all respects and up to the expiry of the Guarantee period from the date of
work completion. Bank Guarantee for interim period will not be allowed. If by any reasons the work
period is extended then contractor should undertake to renew the Bank Guarantee at least one
month before the expiry of the validity failing which GSECL will be at liberty to encase the same.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
If the full Security Deposit amount is not paid immediately after the receipt of the Letter of Intent,
then the order will not be placed (at the discretion of the GSECL) and without entering into any
correspondences and this will be binding on the tenderer.
If the tenderer fails to pay the Security Deposit or defaults in execution of the orders placed or if
GSECL suffers any financial loss due to this, then GSECL will be at liberty to adjust the amount
from other orders of the same firm or by encasing the Bank Guarantee.
Failure to deposit the SD will entail for failure of EMD and the contract shall be treated as
terminated. You shall not be, allowed to start the work if, SD is not paid. Any loss to the GSECL due
to late start of the work because of the late payment of SD shall be contractor‟s liability.
SIGNATURE OF CONTRACTOR
WITH SEAL & DATE
Chief Engineer (C&O)
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
GENERAL CONDITION OF CONTRACT:
A) Person below the age of 18 years and above 60 years should not be employed for the work.
B) No female worker shall be employed in the night shift between 07-00 PM to 06-00 AM.
C) Contractor shall maintain a valid labor license under the contractor labor (Regulation and
Abolition) Act for the employing necessary manpower to be required by him in the absence of
such license the contractor shall be liable to terminated without assign any reasons thereof.
D) The contractor shall at his own expense comply with all labour laws and keep the GSECL
indemnified in respect thereof. Some of the major liabilities under various labour and industrial
laws which the contractor shall comply are as under:
1. Payment of contributing of way of Employer‟s contribution towards provident fund, family
pension scheme, deposit linked insurance scheme, administrative charges etc. at the rates
made applicable from time to time by Government of Gujarat/ Government of India or other
Statutory Authorities.
2. Payment of deposit in respect of each contract labor at rate applicable with the office of
Commissioner of Labor are as per contract labor (Regulation and Abolition) Act.
3. License fee as prescribed under the contract labor (Regulation and Abolition) Act and rules
framed there under depending upon the number of workman employed by the contractor.
License is compulsory if ten or more labors engaged due date.
4. Identity cards as prescribed under the factories act. (with photo affixed there to the same
for identification) shall be issue to workmen.
5. Payment of retrenchment compensation, notice pay and other liabilities as per Industrial
Disputes Act. Any payment to the contractor‟s employees arising out of any claim or
disputes under the industrial Disputes Act. 1947 or any other labor laws.
6. Payment of compensation in case of accidental injury shall be made as per the WC act.
7. Provision of crèche if female labor employed is more than 30 numbers.
8. Maternity leave as per the provision of the Maternity Benefit Act.
The above are some of the major liabilities of the contractor in addition to other liabilities
prescribed under the various labour laws in force from time to time from statutory Authorities like
State Government / Government of India, which the contractor shall have to comply with.
2. PROVIDENT FUND AND FAMILY PENSION SCHEME.
The contractor shall submit along with his bill (month wise) statement regarding deductions against
employees‟ provident fund and family pension scheme in respect of each concerned employee.
Provident fund and family pension scheme at the rate of 12 % of wages (or at the rates made
applicable by the Government time to time). The contractor‟s contribution and his workers
contribution towards provident fund and family pension scheme shall deposited by the contractor
with Regional Provident Fund Commissioner, Ahmedabad. In case if the contractor deposits the
contribution to the Assistant Provident Fund Commission, the zerox copy of challans and schedule
must be submitted in the office. For maintaining the CPF Account of contractor‟s employees the
contractor will have to pay administrative charges as applicable of the emoluments of the employer
of the contractor's every month.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
3. GROUP INSURANCE SCHEME:
The contractor has to take Group Insurance for all workmen engaged by him and copy of the
same shall be produced to Concerned Officer.
4. PAID LEAVE FACILITY :
Paid leave facility at the rate of one day for every 20 days worked by the contract, labour shall be
provided by the contractor to his workers. It shall be duly verified and approved / certified by the
authorized officer of GSECL.
5. The contractor shall employ adequate number of experienced staff at site for daily supervision and
for maintaining of various registers and records required under the law and contracts. No
payment for such supervision shall be admissible.
6. CONTRACTOR TO INDEMINITY THE BOARD
The contractor shall indemnity and keep indemnified the Board and every member, officer and
employees of the G.S.E.C.L. also Engineer in charge and his staff against action proceeding
claims, demands, costs and expenses whatsoever arising, out of or in connection with the maters
referred in above clauses and elsewhere and against all actions claims, demands, cost and
expenses which may be made against the G.S.E.C.L. by any workmen / employees of the
contractor or any sub contractor and/ or contractor from any liability any wise any workman
employees of the contractor or sub contractor under any laws rules or regulation having the force
of low including but not limited to claims against the owner workmen compensation Act
The employees Provident Fund 1952, and or/ the Contract labor (Abolition and Regulation) Act.
1970 the G.S.E.C.L. shall not be liable for in respect of or in consequence of any accident or
injury to workman of other person in the employment of the contractor or his sub contractor and
the contractor shall identify workman in the G.S.E.C.L. against all such damage and
compensation and against all claims, demands, proceeding costs charge and expenses what so
ever in respect thereof or in relation there to.
7. WORKMAN‟S COMPENSATION & EMPLOYER‟S LIABILITY INSURANCE :
Insurance shall be affected for all the contractor‟s employees engaged in the performance of this
contractor. If any of the work is subjected, the contractor shall require the sub contractor to provide
workman‟s compensation and Employers Liability Insurance for the letter‟s employees are covered
under this scheme.
8. Any other rules and regulation, conditions, Circulars etc. that are in force at present and that may be
framed by the GSECL From time to time in connection with contracts will be binding and acceptable
9. The contractor must possess separate P.F. code for the above subject work.
10. Attendance rolls shall be maintained up to date. All the written registers, Performa etc…shall be
filled up and maintained up to date and kept ready for inspection at any time or submitted in-time to
the concerned authorities as per contract labour etc. Factory Act. etc... By contractor
11. It is the responsibility of the contractor to ensure that contractor‟s employees maintain strict
discipline as regards security, methods of safe working etc, and not to cause any hindrance to
smooth running of power station or in execution of duties by GSECL staff. Any lapse in this regard
will be viewed seriously and contract is liable to be terminated. If any of contractor‟s staff is found
unsuitable or not behaving properly, the contractor shall have to remove him from the work-site on
demand by GSECL. The contractor shall have to strictly observe the rules and conditions specified
in the enclosed works contract booklet of the GSECL, which are not modified hereunder. To keep
harmonious industrial relations amongst contract labours is the sole responsibility of the contractor.
Any breach of the same will be viewed seriously.
12. Before starting the work, the contractor should contact Industrial Relation Officer/ Labour Welfare
Officer for all formalities and obtaining the gate passes of all contract laborers and for other
13. The contractor shall deposit 15 days salary at the rate of last drawn salary for every completed two
years of services for each worker for the liabilities of the gratuity (*applicable to ARC/BRC works
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
14. The Company reserves the right to terminate this rate contract at any time during contract period
without giving notice of termination of any reasons thereof.
15. The Company will be entitled to deduct directly from the bills, to be paid to the contractor any sum
of sums payable by the contractor and which sum/sums the GSECL is required to pay as a
principal employer on account of Contractor default in respect of all liabilities referred to in above
16. Nothing in the contract document stated shall anywise constitutes any workman/ employees of the
contractor or any sub contractor as or to be workman employees of the owner or place
obligationary liability in respect of any such workman/ employee upon the GSECL.
17. Office Correspondence will be carried out in English and if at any time to facilitate the contractor,
Gujarati Translation may be furnished if deemed fit the English version will be the contract one the
same only will held good for legal matter.
18. Contractor will be responsible and liable to pay difference in wages if any and or observe the
revised service conditions that may be awarded by the honorable Industrial Tribunal effective from
the dated directed in the award.
19. Rate quoted are firm and hence no price escalation or labor escalation will be applicable towards
execution of work.
20. In case of delay in execution of work the penalty as Cl. No. 3 of Tender and contract for work will
21. Party shall have to provide at their own the required personal protective equipments of standard
make (ISI approved) to their staff during work execution and it will be your responsibility to see that
the same are by your staff while at work.
Follow the following procedure at each milestone for the execution of works contract.
(a) On Commencement of Contractual Work:
(1) The Contractors shall have to obtain Photo-Gate-Pass before the commencement of contractual
work awarded. Contractor shall have to apply for the gate passes in triplicate in a prescribed
application form which is to be available from Security Section for the entry of workmen in the
(2) Such application shall have to be proceed for the approval of Factory Manager. After obtaining
approval of Competent Authority, contractor shall have to prepare the Gate Passes and obtain the
signature of Factory Manager.
(3) If Labours are required to be engaged in Emergency during Public Holiday, Contractors Can apply
for Temporary Gate-Pass for the period of only three days with recommendation of respective
EE/SE and the same shall have to be regularized after following the procedure of Gate Pass
applications on the office working day from HR Department. It is to note that No Temporary Gate-
Pass shall be issued for the work other than acute emergency to carry out the work in power
station premises.
(4) The Contractor shall have to obtain the Group Insurance Policy under the Employee
Compensation Act, 1923 prior to commencement of work.
(5) The Contractor who intend to engaged 10 or More than 10 labours to Carry out the awarded
contractual work then necessary - Form No. V under the Contract Labour (R& A) Act, 1970 / Form
No. VI under the Interstate Migrant worker (employment regulation) rule 1979 as applicable is to be
obtained from HR Department for the purpose of obtaining Labour License from the Licensing
(b) During Contractual Work under the progress:
(1) Bill Recording Officer of User department shall have to ensure as to whether contractor has
engaged minimum number of contract workmen per day as per the terms of work order.
(2) All Contractors shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
situated in the premises of Wanakbori TPS area in case of ARC /BRC works Contract. The
Contractor shall supply copy of Bank Statement duly stamped by the Concerned Bank as a token
of proof towards payment of Wages to HR Department.
(3) All Contractors has to comply & maintain statutory documents / registers at site under the provision
of labour laws & EPF Act.
(c) Submission of Statutory documents to ensure the compliances:
1) The Contractor shall have to submit following statutory documents, work order wise, under the
labour laws and EPF to the recording officer of user department for ensuring the compliances of
provision of labour laws and EPF Act for the respective working period.
Copy of Attendance register - with name & address of establishment, Name of work and site
(duly signed & stamp by Contractor) - Form XVI
Copy of Wage Payment Sheet - with signature of workmen, duly signed & stamped by
Contractor - Form XVII
Copy of Bank Statement of Wage Payment (duly signed & Stamp by Concern Bank)
Copy of PF Challan along with ECR Statement
Copy of Gate Pass Permission (duly signed by Authorities) -
Copy of Work Order (First Time)
Copy of Valid W.C. Policy (First Time)
Copy of Valid Labour License (If Applicable in case of More than 9 manpower Engaged by
Contractor for said work) (First Time)
Form No. XIII - Register of workers employed by Contractor (First Time)
Prescribed under the Contract Labour (R&A) Act, 1970 Contractor shall specify the Name of Work,
Place of Work and Work order number in Muster Roll- Form No. XVI & Wage Register - Form No
GENERAL CONDITIONS OF CONTRACT:
1. The contractor shall at their own expense make all necessary provision for housing water supply
and sanitary arrangement for their employee as well as for works and shall pay direct to the
authorities concerned all rates and taxes.
2. The contractor shall make their own arrangements for the necessary approach road, for transport
of their materials and be responsible for the Compensation on account of damage to crop on
Corporations‟ property.
3. All the royalty charges, octroi other duties will be paid by the contractor and no extra could be
claimed on this account.
4. The organization will supply articles at the place and rates mentioned in schedule „A‟ of Tender
In case of the materials issued either through or with the recommendation of this organization it
will be absolutely necessary for the contractor to maintain a correct and honest record of the daily
consumption of the said materials/with inside particular reference to the work during the day.
The Engineer-in-charge of this department or his authorized agent shall have the right to inspect
and check the stores containing these materials and the account for these materials shall be
presented for inspection whenever asked for by them. Every facility shall be afforded by the
contractors for all these inspections Engineer-in-charge will supply the materials in any quantity
5. Godown of sheds hired or constructed for storage of controlled materials and more/ particularly of
cement shall be such as would prevent the materials from getting damages in any way.
6. It will be absolutely incumbent o the contractors to have on the site of work only such of the
materials as have been dully passed by the Engineer-in-charge. Materials that have been rejected
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
must on no account be allowed to remain on the side and in spite of written order to do so any
such rejected material is on the site beyond a period of 48 hours, notice the Engineer-in-charge
shall have the right to remove it at the risk and cost of the contractor and even destroy it.
7. It must be distinctly understood that the conditions of the contract and of claims in respect of extra
work will not be allowed, unless the works to which they relate is clearly without the spirit and
meaning of the specifications or unless such work are ordered in writing by the Engineer-in-charge
and claimed for in specified manner.
8. On completion of the work, the site shall be cleared by the contractors within the stipulated period,
and ground brought to original state and they shall not be entitled for any extra claim on this
9. General specification of the latest edition of the P.W.D. Hand Book volume I & II shall also apply.
10. DAMAGE CAUSES TO WORKS: The work whether fully constructed or not, and all materials,
machinery plant tools, temporary building and other things connected there shall be at the risk and
in the sole charge of the contractor until the works have been delivered, completed to the
Engineer- in-charge and certificate from him to that effect obtained until such delivery the
contractor shall at their own cost take all the precautions reasonably necessary to keep all the
aforesaid works materials machinery, plant, tools, temporary building and other things connected
with the work, free from any loss or damage and in the event to the same or any part there of being
lost or damage shall from with within possible speed, reinstate and make good such loss or
damage at contractor‟s own cost.
11. Supply of controlled articles will be invariably recommended after the actual requirements have
been carefully scrutinized. In the event of any such materials remaining in surplus in charge of the
contract, on account of some modifications either in the design or changes in construction or any
other reason will be returned to the department.
12. There will be generally no objection on the component parts of the works being given over to
responsible sub contractors but it must be borne in mind that this department would under no
circumstances recognize these sub contractors and responsibility of executing the work in
accordance with the condition of the contract will entirely rest on the main contractors. The main
contractors will therefore always have the very responsible member preferably a technical hand,
present on the works with power to sign all work order issued on the site of work and to take
requisite actions in the interest of very efficient execution of works.
13. With a view to ensure rapid progress on the works purchaser may store at work sites certain
quantities of the materials such as cement etc. and it will be incumbent on the tender to purchase
these materials, at the rates mentioned in schedule „A‟ of tender form for supply of necessary
articles, all necessary help will be tendered but in must be clearly understood that the purchases
does not accepted and responsibility for the delay that may be cause in their supply on account of
circumstances beyond the purchaser‟s control.
14. The Engineer-in-charge will fix the hours of work and no work shall be executed beyond that period
during night time or in absence of the Engineer-in-charge or his authorized agent. The box
measures shall be filled only in the presence of the Engineer-in-charge or his authorized agent.
15. Contractor will be asked to present the sample of materials and the approved sampled will be
preserved at the site of work and no change in the approved sample will be allowed without the
written permission of the Engineer-in-charge.
16. If any work is not executed according to the specifications and the directions of the Engineer-in-
charge the same will be rejected or reduced rate will be allowed as deemed fit by the Engineer-in-
17. Contract will have to communicate the name of his authorized agent who shall be presentation the
works and shall be authorized to sign the materials requisitions receive instruction given verbally,
or on the order book on behalf of the contractor.
18. The materials issued to the contractor as per schedule „A‟ of the tender shall not be removed from
the work and all surplus material at the end of the works which is considered serviceable shall be
returned to the organization even the unserviceable material shall be removed only with the prior
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
permission to the E.E. in writing.
19. The contractor will have to sign the conditions of the contract and execute the agreement, send the
list of previous works executed solvency certificates and pay up the security deposits, failing to that
the tender will be rejected and earnest money deposit will be forfeited. The value of the stamp
paper and stamp duty charges shall be borne by the contactor.
20. The contractor must arrange for all transport of materials weighting of material issued at
department stores and all such cost include in the rates of schedule „B‟ with the loss or above
percentage quoted by the contractor for finished work.
21. The competent authorities can delete to any items in the schedule „B‟ of the tender order if they fill
that the items is not essential to be executed.
22. A schedule of quantities is included in the tender document it shall definitely understood that the
Corporation does not accept any responsibility for the correctness or complication of this schedules
and this schedule is liable to alterations by commissions, deduction or additions at the description
of the Chief Engineer of as set forth in conditions of contract specific percentage less or above
shall be quoted by the contractor below the total amount of schedule „B‟. The tender documents
shall be quoted by the contractor below the total amount of schedule „B‟. The tender documents
shall be written legibly and free from grouser, over written on conversion of figures correction
where unavoidable shall be made by crossing out initialing dating and rewriting both in figures and
in words in case of my discrepancy in figures the price quoted in words shall prevail.
23. This notice to tenders shall form a part of the contract.
24. The entire work is to be completed within the stipulated time limit from the date of work order. The
contractor will not be eligible for any extra for the idle period of work or waiting period that may be
required to suit other considerations and no claim for compensation on account of such will be
considered. However in case or delay due to circumstances beyond the control contractor either in
date of commencement or due to waiting during construction extension time may be considered for
completion of work.
25. In case contractor is unable to account for full quantity of materials issued to him from the
department stores, recovery will be effected from him at cost rates or market rates prevailing at the
time of issue whichever is higher, plus 15% to cover Corporation‟s departmental supervision
charges for all material unaccounted for.
26. Due consideration will be given in granting extension of time for completion of the work if found
necessary on account of delay supply of materials. No claim for compensation or for damages for
extension in time shall be entertained in this account.
All materials inquired by the contractor shall be drawn from the stores by requisition given in
writing by the contractor at least one week before the requirement of work. The recoveries will be
affected in running payment for all material issued up to the date of measurements for the
particular bill or the quantities used in the works measured at the description of the Executive
Engineer in charge of work.
27. The contractor shall keep one full time qualified engineer at site who shall be fully authorized to
receive and comply with such instructions as given by the Executive Engineer. The names of such
Engineer with his qualification and experience shall be intimated by the contractor. The E.E. shall
have the right to demand the removal of any technical person. Skilled or unskilled work men who in
his opinion are considered to cause bad workmanship in the execution of work or to cause
28. Bill shall be submitted by the contractor monthly on or before the date fixed by the E.E., for all
works executed in the previous months.
29. SUPPLY OF WATER AND ELECTRICITY: Water supply, electrical connection & consumption
shall be given Free of cost by GSECL for work purpose only.
30. Should this tender be accepted I/We have agreed to abide by and full fill all the terms and provision
of „Tender and Contract of works‟ as applicable and in default there to forfeit and pay to the
Corporation the some of money due.
31. The work will have to be carried out in co ordination with other Agencies on the same site on
account of this in case the contractor has to stop or delay his works for same time he will not claim
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
anything extra only Corporation may consider to give suitable extension in time limit if necessary
on such account.
32. Any disputes arising out of the contract if not settled mutually, than the same shall be settle by
Gujarat Public Work Arbitration Tribunal act-1992.
33. Amicable settlement: Any dispute, difference, controversy or claim between the Parties arising out
of or relating to this contract with reference to the construction, interpretation, breach, termination
or validity thereof ( hereinafter referred as “the Dispute”) shall, upon the written request of either
Party be referred to the authorized representatives of the Disputing Parties for resolution. The
authorized representatives shall promptly meet and attempt to negotiate in goodfaith a resolution of
the Dispute within thirty days of the service of the request.
34. Arbitration: If the Parties fail to amicably resolve the disputes or differences or contrary claims as
indicated herewith in sub clause (1) of Clause_, arising under or in connection with the present
Works Contracts , whether pertaining to works contracts alone or works and Procurement both, the
same shall be referred to arbitration under the Gujarat Public works Contracts Disputes Arbitration
Tribunal Act,1992”
The following are the major obligations to be fulfilled by the Contractors as per the Contract Labor
(R&A) Act 1970 and rule mentioned there under:
1 The contractor should not be allowed to engage ten or more contract laborers without initiating to
obtain the labour license under the Contract Labour Act from the Assistant Commissioner of
Labour, Nadiad (the said number i.e., ten or more includes Supervisor and other staff).
2 The contractors shall have to obtain group insurance under WC Act before starting the work.
3 All Contractors shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably
situated in the premises of Wanakbori TPS area in case of ARC /BRC works Contract. The
Contractor shall submit the copy of Bank Statement duly stamped by the Concerned Bank as a
token of proof towards payment of Wages to HR Department. In Case of Non ARC/ BRC works
contract, it is also expected the same practice to be adopt by the contractor. If any problem arise
for payment of wages through bank, same be informed to chief engineer (Gen) and after approval
the payment shall be disbursed in presence of the GSECL representative and obtain their
signature in Wages Register - Form No. XVII prescribed under the Contract Labour (R&A) Act,
1970. Prior to that Contractor shall intimate the Date, Time & Mode of Payment in advance to LWO
/ IRO. Contractor has also required to get the wage register of respective month certified from
LWO / IRO as per the provision laid down under the Contract Labour (R&A) Act,
4 Payment to contract laborers has to be made through Bank/ Cheque/ RTGS only. Wages rates for
contract laborers are applicable as per the terms and conditions of the license. The contractor shall
have to pay wages to workers as notified by Government of Gujarat., from time to time.
5 It should be ensured that all the labours engaged by contractor are covered under the provident
fund scheme and employee‟s pension scheme and their contribution are remitted regularly to the
concerned RPFC. The Xerox copies of challan along with ECR in this regards should be submitted
regularly in G.S.E.C.L. office.
6 In case the contractor having more than one contract in the same TPS, the contractor shall have to
submit contract wise separate list of the workmen to the concerned Officer.
7 The contractor shall have to pay wages to workers as notified by Government of Gujarat., from
The above instructions should be followed scrupulously to avoid undue litigation for non Compliance
“GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTORS.
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Rules. Concern principle contractors are responsible for informing & observance of these rules by
their supervisors/contract workers as well as the owner/supervisors/ workers of sub-Contractors
engaged, if any, by them for the work contract awarded to them. Prior to commencement of the
work, Contractor shall have to submit a written assurance on their letterhead to the concerned
Sectional Head / Engineer-in-charge that they have thoroughly gone through these Rules, have
educated their employees / workers of their sub contractor and will strictly observe the said Rules
while execution of work under work contract awarded to them. They will have to indemnify the
company for any loss or damage / accident / injury to the company‟s property / employee or
employee of their own in default of non - observing these rules.
(01) Contractor should issue photo gate pass for their workers from GSECL Factory Manager as per
Gujarat Factories rules, 1963 & details shall be filled up in GSECL gate pass format as per
Aadhar card /Election card id proof & to follow the gate pass issue procedure through concern
department EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical Officer, Safety
Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for
three days with prior permission of Factory Manager only. More than three days, Permanent
photo gate pass procedure shall be completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of Gujarat
Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all contractor workers
before commencement of work & examination responsibility shall be taken by contractor as well
as concerned Head of Department .Pre-employment & Periodical medical examination of
contractor workers shall be carried out in form no.32 from GSECL Factory Medical Officer after
every six (06) months of contractor with their contractor workers. Contractor shall be fulfilled all
health requirements before commencement of work. After completion of medical examination in
form no.32/33, GSECL Factory Medical Officer shall be signed in contract worker gate pass
procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D animation movie &
Training record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the issue
PPE to contract workers as per nature of job, Form no.10 of lifting tools and tackles, Driving
license, Electrical contractor license, Electrical trade qualifications, Safety induction training, SOP,
supervisor qualifications etc. After fulfillment of all Safety compliances, Safety Officer/Dy. Safety
Officer shall be signed in Contract worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is awarded the work
order. Subletting of contract shall be allowed only if prior approval of Power station chief before
execution of work. Contractor/agency shall be submitted the entire subletting contract documents
with gate pass application through concern department EE & SE, LWO/DGM, Safety Officer/Dy.
Safety Officer & Factory Manager.
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules, 1956, Valid
Electrical contractor License shall be submitted to concern electrical department EE/SE/Electrical
Safety Officer/ Safety Officer/Factory Manager at the time of apply gate pass by agency/party with
latest renewal from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical License photocopy
shall be checked by Concerned HOD of Electrical Department/Electrical Safety Officer/Dy.Safety
Officer/ Safety Officer/Factory Manager.
(08) As per natur e of job/work, qualified supervisor (Diploma (Electrical/ Mechanical/Civil/ C&I) +
3 years experiences or ITI + 10 years) shall be engaged by contract agency & qualification
certificate with experience certificate shall be submitted to concern EE/SE/LWO/IRO/DGM/ Dy.
Safety Officer /Safety Officer/Factory Manager at the time of apply gate pass.
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out the work on
electrical lines and Apparatus, Contract person/worker possesses a certificate of competency or
electrical work permit, issued by the Appropriate Government. That means, Electrical trade
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Qualification of contract worker/person like ITI-wireman/ Electrician, Diploma (Elect), BE/B. TECH
(Elect), ME/ M. TECH (Elect) shall be submitted to concern EE/SE/LWO/IRO/DGM, Dy. Safety
Officer/ Safety Officer/Factory Manager at the time of apply for photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7
round the clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor
(BE/Diploma (Elect/Mech/Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged by
contractor during dangerous operations/dangerous works as well as day to day dangerous
activities, safety supervision, tool box talk, Safety awareness programme, SOP preparation with
hazards & its control measures with each step , checking of lifting tools & tackles, hydra mobile
crane, Safety precautions, coordination with Safety Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of vehicles & to
follow the Motor vehicle Act,1988,the Central Motor Vehicles (Amendment) Rules,2016 as well as
Gujarat Motor Vehicles rules,1989 & driver license shall be checked every day by security shift in
charge before entry in the Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person as
per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences. SOP will
review & approve by concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety
Officer/Factory Manager before execution of work.
(13) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide
standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue
format by concern JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective
Equipments / Safety Gadgets suitable to give sufficient protection against hazards involved in
their work / job to their staff, as per the job requirement and insist / enforce their workers to put on
the same while at works.
The ongoing work is liable to be stopped at any time if your contract workers/staffs found working
without P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI approved
only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety Shoes, Safety
Helmet, Safety goggles, Mask & Reusable Ear plug to their workers/supervisor compulsory & it
will check by concern section HOD & Dy. Safety Officer /Safety Officer at the time of gate pass
List of Safety Equipments
Industrial Safety Helmet For protection of head against falling objects or during fall
of person from height. Yellow Colour helmet is used for
contract worker with agency logo.
Safety Goggles/welding goggles/ For protection of eyes against flying particles / dust,
chemical splash goggles chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in high
noise level area.
Chemical suit/Gas tight suit /Fire For body protection against chemicals, oils, sharp edged
proximity suit/FR Boiler Suit objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp
edged objects, heat, hot metals/objects, electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects, sharp
Oil/Chemical/water/heat/ edged objects, heat, hot metals/objects, electricity etc..
Electrical resistance etc.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Safety Belt(full body hardness For fall prevention while working at heights or in depth,
with double lanyard & shock working in vessel or in confined space.
absorber) / Rope / Life line / Fall
Dust Mask/Respirator with Protection of respiratory system against dust.
Chemical Cartridge Respirator Protection against toxic chemical fumes / gases
with full face mask type /vapors/dust etc.
Trolley mounted Air line Working in oxygen deficient zone or confine space area
respirators with full face mask
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of confine
(LEL,O2,CO,H2S,SO2, etc) space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from 01 (one) feet
distance before starting the any electrical work .
Auto darkening welding helmet The new auto darkening welding helmet combines
(EN 379 & EN 175 Level-B) with legendary Speed glass quality and auto darkening
PAPR as per EN 12941:1998, technology with an innovative wide-view grinding visor to
class TH2 and AS/NZS 1716 give welders an all-in-one solution for more flexibility,
precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter which
removes particles from the air. The unit provides a
constant airflow independent of filter combinations and
clogging. The unit can also be equipped with a gas filter
(for example A1B1E1). The unit supplies air to the head
top via the connecting breathing tube. The airflow creates
a slight positive pressure which together with the sealing to
the face prevents particles and other contaminants from
entering the head top.
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by
party/agency/contractor to their contractor workers as per nature of job and allotment of PPE list
shall be submitted to Safety Officer, WTPS on his letter head as per below mentioned format by
Contractor before commencement of work through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name De Name of Name of PPE IS: Mak Q Unit Date Recei
no. of sig Section Code e of ty of ving
worke nat under work no. of PPE issue signat
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
rs ion execution PPE ure
01 Safety Helmet Nos.
Safety goggles Nos.
Reusable Ear Pair
Safety Shoes Pair
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all
contractor workers at entry gate of Factory Premises & shall entered contractor workers with
Safety Shoes & Safety Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor
workers on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should always remain
present at work site. Concern JE/DE of GSECL shall be supervised the contract work as per
(18) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/C&I/ Environment
survey/Chemical etc measuring /testing equipments/instruments which are used during contract
work shall be submitted before starting the work & shall be checked by concern JE/DE/EE before
starting work & it‟s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of work on
dangerous substances, machineries or area at which cautionary notice is displayed and obtain
“Line Clear” or “Work Permit” through the concern Department / Section JE/DE and shall be
informed to concern section JE/DE for closed/ returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE
regarding hazards of specific work, risk & it‟s control measure (mentioned in HIRA) before starting
the job work and records shall be maintained for each & every job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working in factory
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by contractor &
contractor workers from Concern EE/Chief Chemist before starting of chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened fixed vessel,
sump, tank, pit or opening in ground or in floor which, by reason of its depth, situation,
construction or contents ,is or may be a source of danger before starting the work each & every
days or after interval/recess. Contractor supervisor shall be informed to concerned HOD
regarding any unsafe conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile
phone etc are to be strictly followed by all workers who are working in factory premises.
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all
the inflammable material lying at or nearby worksite or cover it properly by suitable protective
covering. Also, special care shall be taken before carrying out such job & see that all possible
contributing factors to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to commence the work in fire
prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipments & fire
extinguishing media / material like sand / water buckets or other appropriate equipment at such
(26) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space /
Vessel Entry Permit” from concerned department prior to commencement of the work.
(27) For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be used.
For taking care of the persons working inside the confined space / vessel, a supervisor / person
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
capable to keep continuous watch on person(s) working inside, assist them in case of emergency
or arrange to get immediate outside help, shall remain present at entry point. Use full body safety
belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants / passers
etc shall remain available near entry point or the entry point shall be cordoned by a barricaded
tape with a cautionary notice. After completion of the works, all the lids / covers / grills / grits
opened, shall be re-fixed / re-placed in the original position as it were prior to commencement of
the work and leave the work place in safe condition in all respect, so as to prevent accident to
fellow workers.
(28) The contractor shall see that he / his persons do not work on or block (by stacking material, spare
parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases /
ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on which there is
traffic movements or possible traffic movements in case of emergency. Such passages are meant
for safe escape in the event of emergency. If it is utmost necessary to carry out work in such area
with blocking of passage, prior permission of Competent Authority or the Engineer-In-Charge
shall be obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading
tape & display suitable caution notice or keep a person to restrict / divert the traffic on this route
through other safe passage.
(29) Prior to use power / electrically operated hand tools / equipments / machines / gadgets like
welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is
found safe to use. Do not use defective, unsafe or improperly maintained equipments.
The electrical power supply required to run such equipments shall not be taken directly at their
own but shall be obtained through concerned Electrical Maintenance Departments or their
authorized persons or under their observations / guidance only. The Electrical Section shall
provide temporary electrical connection up to contractor‟s Mains Board on which it is compulsory
to install mains switch, ELCB & fuses of adequate capacity. All such equipments shall invariably
be earthed adequately to prevent electrical shock, sparking, short circuit etc. Power cord to be
used shall be of adequate capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord for three
phase power connections. The plugs, receptacles, pins, holders etc shall be of adequate capacity
& safe to use. All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used during work
execution shall be of standard make & bear ISI certification mark on it. The consumables like
welding electrodes, grinding wheels / discs etc which has specific prescribed life span shall not be
used in any case if its expiry date is over.
(30) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical
contractor for safe use in areas where hazardous, flammable, or combustible vapors, liquids,
dusts, or residues may be present in Gas Based power plant and list of tools and tackles shall be
submitted with technical bid. Non-Sparking Non-Magnetic electrical hand tools and tool kits shall
be checked by JE/DE before commencement of Electrical work.
(31) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane,
EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it
shall be checked and used only if found safe to use. Also, ensure that these are tested, examined
& certified in form no.10 by Competent Person as per the Factory act-1948 & Gujarat Factories
Rules and its validity do not expire. Further, it shall be fixed properly and firmly prior to lifting the
weight. Valid Test certificate of all Lifting machines used by Contractor to be submitted to
Dy. Safety Officer/ Safety Officer before commencement of work through concerned EE/SE.
(32) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain
the work permit when working at height. While climbing on such scaffolding or working on any
structure at height, use of full body safety belt /full body hardness with double lanyard & Fall
arrestor & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
(33) Contractor or their employee shall not interfere in day-to-day routine plant activities / works except
the work assigned to them, shall not loiter in the areas other than their work jurisdiction, as well as
shall not temper / operate / touch the machineries/equipments / auxiliaries with which they are not
concerned. Also, the contractor shall strictly instruct their staff for not to sit or take rest
at/near/below running plants, auxiliaries, systems or any place which is risky, hazardous & prone
(34) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen, Acetylene,
LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking due care. To handle /
shift such cylinders a special trolley /cage meant for it must be used but in no case it should be
(35) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour generated area,
Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on each
vehicle by party/agency and it will check by shift security in charge before entry of vehicles in the
factory premises.
(36) No women or young person shall be employed or permitted to work in Lead-compound area like
battery room etc. as per schedule VI of GFR
(37) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime
mover or of any transmission machinery while the prime mover or transmission machinery is in
motion. Examination or operation of motion machinery shall be made or carried out only by a
specially trained adult male worker wearing tight fitting clothing as per section 22 of factories act
(38) In all risky job, before start the work, contractor should obtain General Safety Work Permit
through concerned section from Shift-in-charge well in advance.
(39) In case of noticing smoke or fire during their work execution, they shall make immediate efforts to
extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station Fire
Officer or Emergency Control room no which is displayed at prominent place of factory like Main
Security Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station, All
security gates, Occupational Health Centre.
(40) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No. 21 &
ANNEXURE may be obtained from concerned section or Dy. Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer
through concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as
per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall be
filled up by concern department JE/DE with written consent of contractor. The Form may be
obtained from concerned Electrical section or Electrical Safety Officer. Electrical accident
investigation shall be carried out by Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate of injured
person with endorsement of GSECL factory Medical Officer to LWO/Dy.Safety Officer/Safety
Officer/Electrical Safety Officer then after injured person may allow for work.
(41) For any incident occurred but have no injury to any persons should also reported as per GSECL
format and informed to Dy. Safety Officer/Safety Officer as Near Miss Incident.
(42) Safety penalty shall be imposed against Offences by contract workers: If any contract
worker worked in a factory contravenes any provision of Factories act or any rules or orders made
there under, imposing any duty or liability on workers, contractor/agency shall be punishable with
fine which mentioned as under.
Sr. No. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, Rs.1000/- per day
confine space entry, hot work etc.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge Rs.1000/- per set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature of job like Rs.1000/-per day
mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles (like Rs.2000/- per
C.P.Bs., Hook chooks, winch, forklift, mobile crane, EOT equipment
crane etc) & its attachments (like D-shackles, slings, U-
clamps, Eye bolts or any fixtures) in Form No.10 of Gujarat
Factories Rules,1963
(ix) Work without Double lynyer Safety belt during working at Rs.3000/-per person
Height work, work without anchoring in hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
Safety Penalty is to be imposed directly by individual Dy. Safety Officer/Safety Officer/ Electrical Safety
Officer and Factory Manager/Occupier against violation of statutory requirements and penalty will be
recovered through RA bill. Photograph/CCTV camera footage is to be put up with penalty note by
imposed individual officer.
(43) Party will damage any fire equipments or property or machinery in factory during execution of
work, total damage cost will be recovered from party RA bill and recovery Office note put up by
(44) All the relevant labour and industrial laws shall also be followed compulsorily.
(45) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces, scrap
etc. are to be removed by contractor and scrap shall be deposited to scrap yard of Main Store.
(46) For performance evaluation of contractor, safety factors of work accident, fire incident & near
miss accident will be considered. Steps can be taken to review the job assignment up to
cancellation for negligence.
(47) Over & above these, contractor shall have to follow all the safety requirements /rules & regulations /
norms and legal provisions laid down in various statutes. Particularly the provisions of The Factories
Act-1948 & the Gujarat State Factories Rules-1963 (Amended up to date), The Electricity Act-2003 &
rules, BOCW Act/Rules shall be followed strictly. The contractor shall also obey the rules /
regulations / instructions of the local Competent Authority for safety & health requirements.
(48) The above rules shall be scrupulously followed and where required, Contractor / contractor
workers may contact to the Dy. Safety Officer/Safety Officer/Electrical Safety Officer in case of
any ambiguity or needs further guidance in this regard.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Contract Labour Information Management System (CLIMS)
GSECL has developed a Contract Labour Information Management System (CLIMS)- a
comprehensive digital platform designed to manage all activities related to contract labour
transparently and efficiently.
The primary objectives of CLIMS are to save time for both agencies and GSECL personnel, to
ensure full legal and regulatory compliance and to reduce the operational burden on agencies,
allowing them to focus on their core activities. To ensure the successful implementation and
operation of CLIMS, the following guidelines are hereby issued.
l. CLIMS is a web-based system that can be accessed by agencies from any location using a
desktop, laptop, or mobile device.
2. To begin using the system, agencies must register by entering their EPO (E Urja Order)
number. All other necessary details are automatically fetched from the E-Urja system.
3. The issuance of gate passes for contract labour is managed entirely through CLIMS. Agencies
can generate and track gate passes within the system.
4. In order to enable gate pass issuance, agencies are required to input and upload the
necessary details of their contract labourers into the system.
5. Once the required information is submitted, the gate pass approval process is initiated and
managed through the system. The request automatically moves through the predefined workflow
levels. Agencies can monitor the real-time status of their gate pass applications via CLIMS.
6. Upon completion of all required approvals within the system, the gate pass is issued to the
B. Attendance and wages of workers:
1. Once contract workers gate passes are approved in the system, they are required to be
registered in Bio-Metric/Face Reader Punching machines by HR Department.
2. The attendance of all contract workers can be monitored and maintained through CLIMS by
3. Access to data of Bio-Metric is given to agencies. It should be the duty of agencies or his
supervisor to ensure the supply of specified number of manpower and to ensure their Bio-Metric
punching and reporting at the location of work.
4. Attendance register and wage register of the worker will be generated by CLIMS from the login
of agency only.
C. Compliance to various labour laws:
l. All the contractors have to comply various labour laws and they shall submit the attached
Declaration-cum Indemnity Bond before staring of work. This Bond may also be made part of
ensuing tenders/contracts.
2. Contractors shall upload the CLIMS generated previous month attendance sheet, wage register
duly signed by workers, wage bank statement, ECR copy, PF Challan and Remittance slip.
3. The said submitted documents in CLIMS will go to user department, after verification of
completeness of documents, user department will forward it to HR Department for further
verification and approval.
4. If the documents are complete, HR Department will approve in CLIMS and send to Account
Department for further process of bill.
5. If non-compliance is found in submitted documents, it will be returned to user department in
CLIMS with specific remarks and user department will forward it to contractor for compliance. In
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
such cases, 75% of the bills may be released subject to a maximum ceiling of 20% of the contract
values. Such system of payment shall be allowed only for 3 monthly Running Accounts (RA) bills
(Maximum cumulative amount up to 20% of the contract value) of the contractor in a period
contract (AMC) of 12 months or 6 RA bills in a period contract (BMC) of 24 months if there is non-
compliance. All other RA bills and specifically final bill shall not be processed if the previous &
current compliances are not made by contractor. No such relaxation will be granted for non-
periodic, one time or overhauling type contract.
D. Special Case:
In case of work order issued for expert services to PSU or OEM/OES following procedure may be
1. If officers / specialized manpower / expert Engineers from Govt / Semi Govt Companies / PSUs
/ OEM/OES/foreign experts are deployed for short-term, specialized, or ad-hoc technical /
consultancy services (e.g., commissioning, maintenance, consultancy or inspections), concerned
Engineer In-Charge (EIC) shall certify the same
2. The EIC must obtain following documents from the concerned Govt / Semi Govt Companies /
PSUs/OEM/OES etc:
(i) Declaration cum undertaking (As Per Annexure-A) that visiting experts are their regular
employees with documentary proof, and
(ii) Declaration towards compliance of applicable labour laws.
The above documents shall be submitted along with the bill / Invoices by EIC to HR department
for the purpose of HR clearance in lieu of the procedure at Clause -C above.
SIGNATURE OF CONTRACTOR
WITH SEAL & DATE
Chief Engineer (C&O)
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Declaration –cum-Undertaking
This is to certify and declare that Shri [Employee's Full Name] , son/daughter of [Father's Name], is
a permanent/regular employee of [Company Name], employed in the capacity of [Designation].
His/Her Employee ldentity Card is attached herewith for reference.
It is further declared that his/her Universal Account Number (UAN) under the Employees'
Provident Fund and Miscellaneous Provisions Act, 1952, is IUAN Number] as applicable
We hereby undertake and declare that:
1. We have complied with all applicable provisions of all the labour laws , including but not
limited to the Employees' Provident Fund and Miscellaneous Provisions Act, 1952; the
Employees' State lnsurance Act, 1948; the Payment of Wages Act, 1936; the Payment of
Bonus Act, 1965; the Contract Labour (Regulation and Abolition) Act, 1970; the Minimum
Wages Act, 1948; and other relevant labour and industrial legislations, in respect of Shri
[Employee's Full Name] as applicable to us.
2. We further undertake to produce, as and when required, all statutory records, registers,
Challans , and returns as proof of compliance to the Gujarat State Electricity Corporation
Limited (GSECL) or any other statutory/government authority.
3. We hereby indemnify GSECL in respect of any civil or criminal liability which may arise due
to any non-compliance of the law of the land in respect of our above-mentioned
This Declaration-cum-Undertaking is issued in good faith and to the best of our knowledge and
belief and shall be binding upon us.
Authorised Signatory,
For [Company Name]
[Authorised Signatory Name]
[Seal/Stamp of Company]
[contact Details]
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Job Safety Analysis sheet
JSA for: Supply and application of HVOF (High velocity oxy flame) thermal spray coating in various
locations of boiler unit-8 at WTPS.
Job Step Hazard Risk Control Measures Responsibility
Level Risk assessment should be
carried out and inform to all
Application of Fall of object High All job related PPE Contractor &
& person should be use as per It‟s Supervisor
from height note of works.
velocity oxy Area barricaded.
Safety talk to be given
before work execution.
spray coating in Close supervision
various locations
Arrange Proper
of boiler scaffolding.
Failure of High Crane / Hydra must be
lifting tools / operated by competent
tackles operator.
Confirm crane/hydra to
be used as per load of
Form no 10 must
available for lifting
machine/ tools & tackles
Electric shock High Electric supply through Contractor &
ELCB/RLCB. It‟s Supervisor
Industrial plug socket
should be used.
Three pin used with
earthing wire connection.
Three cord cable to be
Lamp guard to be used.
Cable cord to be laying
on dry surface only.
Exposure to High Use PPE, personal care Contractor &
eyes required. It‟s Supervisor
Close supervision
Area barricaded.
Exposure to Medium Use PPE, personal care Contractor &
hot surfaces required. It‟s Supervisor
Close supervision
Area barricaded.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Injury to Medium Load should be hang in
human body vertical direction only.
due to Hazard due to
unbalancing unbalancing of load
of hanging should be considered
load before dismantling of any
slips/trips/falls load/ plant structure.
NOTE: Required check list should be filled up by contractor at time of work execution.
Prepared by Reviewed by Checked by Approved by
EE Dy. Safety Officer SE Factory Manager Chief Engineer
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
DECLARATION FORM
ON LETTER HEAD OF SUPPLIER
Subject: Supply and application of HVOF (High velocity oxy flame) thermal spray coating in
various locations of boiler unit-8 at WTPS.
Reference No:- WTPS/S/TECH/RFQ- 76895M/BMD-8
1. I/We hereby declare that I/We have carefully & thoroughly studied the entire tender placed on
the website and General terms & conditions, technical specification, PQR and other documents
of the tender mentioned under reference along with the Commercial terms and conditions.
2. I/We hereby confirm and certify that the offer submitted by me/us is strictly in accordance with
the GSECL‟s Tender specifications, Guaranteed Technical Particulars and drawing as
mentioned in the Tender Specifications. There is no commercial or Technical deviation (except
the deviations shown in respective Annexure-12 of Technical Deviations of this tender
document) in the offer from the Board‟s Tender Specification. I undertake to abide by the
GSECL‟s Technical specification / Guaranteed Technical Particulars / Drawing, I undertake to
supply materials strictly as per the GSECL‟s Technical specification / Guaranteed Technical
Particulars / Drawing, even if any technical deviations are mentioned by me. I also undertake
to abide by all commercial conditions of the GSECL, including delivery schedule. I have
submitted all the annexure-1 to 15,form of integrity pact etc along with the technical Bid dully
filled along with all the details”
3. I / We, hereby declare that our Technical Bid is strictly in line with the Tender specifications
(except the deviations shown in Annexure-12 of Technical Deviations of this tender document).
4. I / We also agree that additional conditions / deviations, if any, found in the Commercial terms
& conditions (except the deviations shown in Annexure-12 of Technical Deviations of this
tender document) our offer shall be out rightly rejected without assigning any reason thereof.
5. I/We hereby abide to execute the contract agreement & submitted the same along with the
acceptance of LOI and the same will be acceptable to me/us.
6. I/We hereby accept and confirm that any dispute on this regard shall not be entertained by the
tender inviting authority.
7. The full value of the “Earnest Money Deposit” paid herewith should be absolutely forfeited to
the Corporation, should I/ we do not deposit the specified amount of specified Security Deposit
within 10 Days from receipt of the Letter of Intent.
8. If, I fail to submit all required documents with application or tender copy ( in each tender ) then
my tender will be cancelled, which is binding to me.
authorized signatory of M/s ______________________________________________ here by
proprietor / any partner / any directors of the firm is not stop deal and / or banned for business
dealing and / or black listed by GUVNL and / or their any subsidiary company viz. GSECL /
GETCO / DGVCL / MGVCL / UGVCL / PGVCL as well as Government and / or Semi
Government company / department.
10. We here by confirm that we have not stake in one or more other agencies / bidders who are
participating in same tender and if it is found that the submitted information / declaration are
wrong in the tender / enquiry as stated in tender terms, than we will be disqualified
automatically &it will be accepted to us. EMD / SD will be forfeited. More over if GSECL shall
take stern action including stop dealing with our firms which is also accepted to us
Seal of the Firm Signature of the Tenderer with Designation.
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
[On Company’s Letter Head]
(Require for Price Justification, if Necessary)
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(All Bidders will have to furnish the following undertaking duly filled in, for all the quoted
items/works of the tender along with online Technical Bid)
Ref.: Tender No……………. / Gem Bid. No.
We, the undersigned, hereby declare and undertake that we have not accepted or executed
any Letter of Acceptance (LOA) or Purchase Order (PO) at a unit ex-works price/any work at
rate lower than the rate offered in this tender in any station of GSECL/GUVNL/ & Subsidiaries/
CPSU / SPSU/IPP etc. during the period from six (6) months prior to two (2) months after the
bid submission date of this tender.
We also understand that LOA / Purchase Order placed by any station of GSECL/GUVNL
Subsidiaries/ CPSU/SPSU/IPP etc. on the basis of above undertaking shall not be considered
as „offered‟ price for the tender items in subsequent tender, if it is not within period mentioned
I/We accept above undertaking.
Seal of the Firm Signature of the Tenderer
With Designation
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
<On the letterhead of the vendor/ payee>
Subject : Declaration for TDS/TCS under the Income Tax Act (IT Act)
Reference : Provisions of S. 206AB/ 206CCA/139AA of the IT Act
This is with reference to the determination of appropriate Tax deduction at source (TDS) or Tax
collected at source (TCS) as per the provisions of the Act i.e. Section 206AB/ 206CCA/139AA of the IT
Act. In relation to the said provision of the Act: I / We, having status of <<mention status i.e.
Individual/Company/ Firm etc.)>>hereby declare and confirm that: -
a) I/We have<<mention PAN>>Permanent Account Number (PAN) under the IT Act.(Copy of
PAN card is enclosed herewith.)
b) I/We have linked / will be linking Aadhar number with PAN as required under section 139AA (2)
read with Rule 114AAA.latest by 30th June
c) I/We have/have not filed income tax returns (ITR) for two previous years immediately prior to
the year in which tax is required to be deducted and for which last date of filing of income tax
return is expired u/s139(1) of the Act.
I/ We am/ are hereby attaching a copy of acknowledgment of ITR filed for any one of previous
two financial years of which due date u/s139(1) is expired, as proof of filing ITR. (Strike out full
sentence if not filed IT returns)
d) The aggregate amount of Tax Deductible at Source (TDS) and Tax Collectible at Source (TCS)
exceed/don‟t exceed Rs. 50,000 or more in each of the two aforesaid previous years in my/our
case (Vendor has to provide the extract of its Form 26AS if copy of ITR is not provided as
e) I/ We shall, indemnify the Company for any consequences arising out of any acts of commission
or omission including incorrect declaration basis which the Company would act upon.
I/We agree that Company shall determine applicability of section 206AB/206CCAof the IT Act
based on the aforesaid declaration/documents filed by me/us and would deduct TDS/TCS
accordingly. The decision of Company shall be final and acceptable to me/us. Strikeout
whichever is not applicable.
Yours faithfully,
< Full Name of Vendor & seal >
BIDDER’S SIGN WITH SEAL
RFQ- 76895M Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT RFQ- 76895M BMD-8.pdf
TECHNICAL BID RFQ- 76895M BMD-8.pdf
General Commercial Terms and Conditions-n procure.pdf
Download all tender documents and submit your bid