| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAdmitted-Finance | ₹8.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.1 Cr+₹20.6 L (2.31%)Admitted-Finance | ₹9.1 Cr+₹20.6 L (2.31%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SERMS Infrastructure Pvt Ltd L1 | ARS JASMIN CONSTRUCTIONS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00BRIDGE PROPER | |||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 57.82 | cum | 90 ₹5,203.71 Lowest | 100 ₹5,781.9 |
| 1.00 | 12.24.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm | 175.02 | metre | 22,000 ₹38,50,440 | 21,000 ₹36,75,420 Lowest |
| 1.00 | OD76951/2023-2024:Based on 12.22 of MoRTH and approved estimate no. BR/2020/3330 - Providing permanent steel liner 6mm thick including supplying, conveying, fabricating as per detailed drawing for cast in situ pile and erecting at site in lines and levels and driven down into required depth as per drawing including cost and conveyance of all materials, all fabrication charges with all leads and lifts etc. complete according to the specification and as directed by departmental officers. | 8.87 | MT | 86,000 ₹7,63,164 Lowest | 1,00,000 ₹8,87,400 |
| 1.00 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 106.8 | cum | 12,000 ₹12,81,600 | 10,000 ₹10,68,000 Lowest |
| 1.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 30.14 | MT | 82,000 ₹24,71,808 Lowest | 1,02,000 ₹30,74,688 |
| 1.01 | 12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap | 15.33 | cum | 8,000 ₹1,22,640 Lowest | 10,000 ₹1,53,300 |
| 1.01 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 129.42 | cum | 12,200 ₹15,78,924 | 10,000 ₹12,94,200 Lowest |
| 1.01 | 13.5.H.q.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height 5m to 10m | 5.81 | cum | 13,250 ₹76,982.5 | 10,000 ₹58,100 Lowest |
| 1.01 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | 17.21 | MT | 83,000 ₹14,28,513 Lowest | 1,02,000 ₹17,55,522 |
Tender Value
₹7.8 Cr
EMD Value
₹2 L
Closing Date
11 Apr 2025, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2025_KRFB_741428_3
PWD/KR/TR/12680/2023_5_1_1/4
Open Tender
Civil Works - Bridges
Item Rate
365 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹13,010
Yes
₹2 L
Yes
17 Sept 2026
29 Mar 2025
15 Apr 2025
29 Mar 2025
11 Apr 2025
29 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BRIDGE PROPER | |||||
| 1.001 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 57.82 | cum | - | - |
| 1.002 | 12.24.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm | 175.02 | metre | - | - |
| 1.003 | OD76951/2023-2024:Based on 12.22 of MoRTH and approved estimate no. BR/2020/3330 - Providing permanent steel liner 6mm thick including supplying, conveying, fabricating as per detailed drawing for cast in situ pile and erecting at site in lines and levels and driven down into required depth as per drawing including cost and conveyance of all materials, all fabrication charges with all leads and lifts etc. complete according to the specification and as directed by departmental officers. | 8.87 | MT | - | - |
| 1.004 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 106.8 | cum | - | - |
| 1.005 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 30.14 | MT | - | - |
| 1.006 | 12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap | 15.33 | cum | - | - |
| 1.007 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 129.42 | cum | - | - |
| 1.008 | 13.5.H.q.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height 5m to 10m | 5.81 | cum | - | - |
| 1.009 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | 17.21 | MT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1229760.xls
BOQ • 0.35 MB
viewnit.pdf
Tender Documents • 0.04 MB
SBD.pdf
Tender Documents • 4.21 MB
Requisitionfore-payment.pdf
Additional Documents • 0.10 MB
BOQ.xls
BOQ • 0.35 MB
Tenderdocument.pdf
Tender Documents • 0.04 MB
Tenderdocument_2.pdf
Tender Documents • 0.10 MB
Tenderdocument_3.pdf
Tender Documents • 4.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .