| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.2 LAccepted-AOC | 1 | Accepted-AOC L1 BIDDER | |
| 2 | 2₹21.6 L+₹35,914.40 (1.69%)Rejected-AOC | 2 | Rejected-AOC L2 BIDDER | |
| 3 | 3₹22.2 L+₹97,219.04 (4.57%)Rejected-Finance | 3 | Rejected-Finance L3 BIDDER |
Tender Value
₹23.5 L
EMD Value
₹50,000
Closing Date
5 Oct 2023, 4:00 pmClosed
Deputy Director of Soil Conservation
DirectorateofSoilSurveyandSoilConservaitonVazhuthacaudThiruvananthapuram
Retaining wall Foot Slab
2023_DSSC_605783_1
PG(1)714/2023/LSS
Open Tender
Civil Works - Others
Item Rate
180 days
Mariyapuram Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,755
₹50,000
9 Nov 2023
23 Sept 2023
7 Oct 2023
23 Sept 2023
5 Oct 2023
23 Sept 2023
Amount
Cement Concrete Retaining Wall 1.15 m height 218 Rm
Earth Work excavation for side cutting and foundation as per code 2.6.1
Rock anchoring works.- Providing dowel bars . 12 mm dia TMT bars of 100 cm long hooked at one end in 50 cm deep holes fixed with cement grouting including cost and conveyance of steel, labour charges etc. complete as per code OD58/2023-2024
Form Work forfoundation: Centering and shuttering including strutting ,propping etc and removal of form work for foundation, footing ,bases of coloums as per code 4.3.1
Centering and Shuttering for Super structure slanding side, vertical side and end side as per code 4.3.2 ( Centering and shuttering including strutting ,propping etc and removal of form work for Retaining walls ,return walls (any thickness) including attached pilasters ,buttresses ,plinth and string courses ,fillets,kerbs and steps etc )
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) as per code 4.1.3
Foot Slab
Form work for foot slab bottom :Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform as per code 5.9.3
Form work for foot slab sides :Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete as per code 5.9.1
Steel reinforcement for R.C.C work including straightening,cutting , bending,placing in position and binding all complete upto plinth level Thermo -Mechanically Treated Bars of grade Fe-500 D or more as per code 5.22.6
Reinforced cement concrete for Passage Slab as per code 5.1.2 ( Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering ,shuttering ,finishing and reinforcement - All work up to plinth level 1:1.5:3 ( 1 cement ,1.50 coarse sand ,3 graded stone aggregate 2o mm nominal size )
THOMAS T M
NEW KERALA BUILDERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_903032.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .