| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 LAccepted-AOC | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Saji Abraham L1 |
|---|---|---|---|---|
| 1.00ROAD MAINTANENANCE | ||||
| 1.00 | OD282558/2025-2026:steel work for purlin /single section with G I pipes including cutting, hosting, fixing in position and applying a priming coat of approved steel primer, including and bolted with special shaped washers etc. complete .. | 274.05 | kg | 185.37 ₹50,800.83 Lowest |
| 1.00 | OD285833/2025-2026:dismantling stone rubble masonry manually/mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 mts lead as per direction of Engineer in charge | 13.66 | cum | 1,240 ₹16,934.68 Lowest |
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 8.1 | cum | 941 ₹7,623.98 Lowest |
| 1.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.07 | tonne | 1,00,926 ₹6,560.19 Lowest |
| 1.00 | OD282642/2025-2026:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 19.38 | cum | 4,160 ₹80,629.12 Lowest |
| 1.01 | OD282801/2025-2026:Dry Rubble (Department supply) without concrete levelling course masonry with good quality blasted rubble including packing to compactness to line and levels cost and conveyance of all materials labour charges etc complete as per direction of dept: officers st site | 8.19 | cum | 1,787.53 ₹14,647.02 Lowest |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 0.82 | cum | 9,887 ₹8,117.23 Lowest |
| 1.01 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 0.52 | cum | 9,554 ₹4,948.97 Lowest |
| 1.01 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 0.24 | cum | 9,186 ₹2,195.45 Lowest |
Tender Value
₹1.9 L
EMD Value
₹4,812
Closing Date
31 Jan 2026, 6:00 pmClosed
Assistant Engineer
Assistant Engineer LIDEW Section Puthuppally
Protection wall
2025_LSGD_817833_8
05/AE/LIDEW/PLY/2025-26
Open Tender
Civil Works - Others
Item Rate
240 days
Puthuppally
Please refer Tender documents.
6 documents required · 6 mandatory
₹555
Yes
₹4,812
Yes
23 Apr 2026
23 Jan 2026
2 Feb 2026
23 Jan 2026
31 Jan 2026
23 Jan 2026
ROAD MAINTANENANCE
OD282558/2025-2026:steel work for purlin /single section with G I pipes including cutting, hosting, fixing in position and applying a priming coat of approved steel primer, including and bolted with special shaped washers etc. complete ..
OD285833/2025-2026:dismantling stone rubble masonry manually/mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 mts lead as per direction of Engineer in charge
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
OD282642/2025-2026:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
OD282801/2025-2026:Dry Rubble (Department supply) without concrete levelling course masonry with good quality blasted rubble including packing to compactness to line and levels cost and conveyance of all materials labour charges etc complete as per direction of dept: officers st site
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1394216.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
80FOT.pdf
Tender Documents • 0.26 MB
80SBD.pdf
Tender Documents • 0.98 MB
80PA.pdf
Additional Documents • 0.26 MB
80bidsub.pdf
Other Document • 0.34 MB
80affid.pdf
Other Document • 0.24 MB
Epay.pdf
Other Document • 0.24 MB
IPACT.pdf
Other Document • 0.24 MB
NIT7.pdf
Other Document • 0.20 MB
BOQ_1394216.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .