Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | ₹1.7 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.8 Cr+₹5.0 L (2.88%)Rejected-Finance | ₹1.8 Cr+₹5.0 L (2.88%) | L2 | Rejected-Finance L2 |
Tender Value
₹80.8 L
EMD Value
₹1.1 L
Closing Date
16 Mar 2020, 11:00 amClosed
EXECUTIVE ENGINEER
IPH DIVISION DHARAMSHALA
Cons of Tertiary Treatment Plant based on Root Zone Technology in shape of constructed Wet Land including Operation and Maintenance for three years
2020_HPIPH_35724_1
EE/IPHD/EA-I/2020-19128-227
Open Tender
Civil Works
Item Rate
365 days
dharamshala
Please refer Tender documents.
7 documents required · 7 mandatory
₹800
-
₹1.1 L
Yes
27 May 2020
28 Feb 2020
16 Mar 2020
28 Feb 2020
16 Mar 2020
28 Feb 2020
28 Feb 2020 - 16 Mar 2020
Amount
Evolving Planning, Hydraulic & Structural Design, Site development, Construction, Installation, Testing and Commissioning of Upgradation of existing STPs with tertiary treatment based on constructed wetland technology, multigrade filter including autoclorination disinfection unit in RCC construction which should be capable of treating secondary effulent of characteristics as mention as below. The characteristics of treated/disposable effulant should comply with the revised standards given below. The Design Mehodology should be based on CPHEEO manual guidelines and clearity indicate proper authentic reference, design constant & kinetic equation involved in the procss of design calculations duly vetted from IIT/PEC. Refer chapter vi (a) to (c) for basic data, scope of work, Technical specification & Terms & conditions.
To operate, repair & maintain all civil works for teriary treatment in the shape of constructed wetland under sewerage system Dharamshal Town cinsisting of one no. Tertiary treatment sewage plant (Full capacity) at Dharamshala for the period of three years in all respect to the entire satisfaction of Engineer - in - charge. The O&M of constructed wetland shall be carried strictly as per the provsions made in the latest Manual on Sewerage & Seweage treatment systems issued by CPHEEO (Eddition 2013) firm should do comply the stringent effluent standards laid down by HP Pollution Control Board. Secondary treated Effluent Parameters:-Parameters Unit Inlet Secondary treated Effluent Parameters:- Parameters Unit Inlet Ph 6.5 - 8.5 BOD mg//l 30.00 COD mg/l 250.00 TSS mg/l 100.00 Teritiary treated Efluent Parameters Parameters Unit Outlet Ph mg//l 6.5 - 8.5 BOD mg//l < 10.00 COD mg/l <50.00 Ammonical -N mg/l <5.00 TSS mg/l < 20.00 Fecal Coliform MPN/1ooml <100.00
Dogra Construction Company Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .