Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-AOC | ₹9.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹10.2 L+₹39,914 (4.06%)Rejected-AOC | ₹10.2 L+₹39,914 (4.06%) | 2 | Rejected-AOC L2 |
| 3 | 3₹10.2 L+₹40,350 (4.11%)Rejected-AOC | ₹10.2 L+₹40,350 (4.11%) | 3 | Rejected-AOC L3 |
| 4 | 4₹10.3 L+₹45,452 (4.63%)Rejected-AOC ALUKKA MOOKKANNOOR | ERNAKULAM | KERALA | 680667 | ₹10.3 L+₹45,452 (4.63%) | 4 | Rejected-AOC L4 |
| 5 | 5₹10.3 L+₹51,912 (5.28%)Rejected-AOC KOICKAL H POICKATTUSSERY CHENGAMANADU KERALA | ERNAKULAM | KERALA | 683572 | ₹10.3 L+₹51,912 (5.28%) | 5 | Rejected-AOC L5 |
Tender Value
₹10.9 L
EMD Value
₹27,350
Closing Date
15 Sept 2020, 5:00 pmClosed
Managing Director
Kerala Agro Machinery Corporation Ltd, A Govt. of Kerala Undertaking, Athani, Ernkaulam-683 585.
Paving interlocking tiles at reaper storage yard at KAMCO Mala Unit
2020_KAMCO_380355_1
CVL/MU-01/2020-21 dated 14.08.2020
Open Tender
Civil Works - Others
Item Rate
60 days
KAMCO-Mala Unit in Thrissur District
As per Tender Conditions
2 documents required · 2 mandatory
₹5,900
Yes
online
₹27,350
Yes
14 Oct 2020
27 Aug 2020
17 Sept 2020
27 Aug 2020
15 Sept 2020
4 Sept 2020
28 Aug 2020 - 3 Sept 2020
Amount
Civil Works
Earth work excavation in ordinary soil for levelling the site with available soil to make a base for providing paving tiles, including breaking clods, spreading watering,ramming ,back filling, uprooting of vegetation, cutting and removal of existing plants/trees, grass etc. Complete
C.C. 1:2:4 (1 cement : 2 M sand : 4 graded stone aggregate 20 mm nominal size) for side concreting including cost and conveyance of all materials, labour charges, necessary scaffolding, curing etc. complete.
Providing and laying in required pattern (Line/Design) factory made hydraulic chamfered edge cement concrete paver blocks (Coloured/Plain) of 80mm thick to withstand about 40 tonne weights in storage yard of required strength, thickness & size/ shape, made by required colour & pattern over a minimum of 100mm thick compacted bed of metal or up to getting a levelled surface, compacting and proper embedding/ laying of inter locking paver blocks into the metal bedding layer through vibratory compaction by using plate vibrator, as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-charge.After levelling, before laying the paving tiles the ground has to be compacted properly by using mechanical roller. (Test result certificate of tile has to be submitted before staring the work).
JOSE KOTTACKAL
NISHAD K K
ELDO ALIAS
ITTEERA K.I.
R. Sajikumar
CHERIAN VARGHESE
M D ESTHAPPAN
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_540548.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .