Tender Value
₹7.6 L
EMD Value
₹19,000
Closing Date
29 Aug 2026, 3:00 pmDue tomorrow
Executive Engineer
Cochin Devaswom Board,Round North,Thrissur
Vyttila Temple - Repair work and providing truss work over shop rooms
2026_CDB_865132_1
H1.575/26
Open Tender
Civil Works - Buildings
Percentage
90 days
Vyttila
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,124
₹19,000
12 Aug 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
29 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Steel work for purlin /single section with G.P pipes including cutting hoisting fixing in position and excluding applying a coat of primer etc complete. | - | kg | 144.21 | - |
| 1.02 | Steel work in built up G.P tubular (round,square or rectangular hollow tubes etc)trusses etc including cutting hoisting fixing in position and excluding applying a priming coat of approved steel primer including welding and bolted with special shaped washers etc complete. | 1 | kg | 191.01 | ₹190.82 |
| 1.03 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | - | m2 | 842.14 | - |
| 1.04 | Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately) External work - 80 mm nominal dia | 1 | m | 1,009.73 | ₹1,008.72 |
| 1.05 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 0.2 | m2 | 252.95 | ₹50.34 |
| 1.07 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead | - | m2 | 56.51 | - |
| 1.08 | Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | 377.65 | - |
| 1.09 | Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources | - | m3 | 12,281.44 | - |
| 1.1 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | - | m2 | 147.63 | - |
| 1.11 | Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers. | - | sqm | 640.14 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_1463914.xls
BOQ • 0.29 MB
PRELIMINARY.pdf
Tender Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].