| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.4 LAdmitted-Finance | ₹38.4 L | L1 | Admitted-Finance |
| 2 | L2₹38.8 LAdmitted-Finance | ₹38.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K.Murugesan L2 | P THANNASI L1 |
|---|---|---|---|---|---|
| 1.00Providing Drainage at Amirthampal Nager II nd Cross Loganathan House To Velmurugan House H/O Andankovil West Panchyat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 329.01 | Cum | 266 ₹87,516.66 | 264 ₹86,858.64 |
| 3.00 | Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course. | 35.73 | Cum | 5,392 ₹1.9 L | 5,338 ₹1.9 L |
| 4.00 | Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat. | 118.35 | Cum | 6,154 ₹7.3 L | 6,092 ₹7.2 L |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 893.26 | Sqm | 553 ₹4.9 L | 547 ₹4.9 L |
| 6.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 199.49 | Sqm | 584 ₹1.2 L | 578 ₹1.2 L |
| 7.00Providing Drainage at Amirthampal Nager III rd Thangavel House To Kanagasivam House H/O Andankovil West Panchyat | |||||
| 8.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 366.86 | Cum | 266 ₹97,584.76 | 264 ₹96,851.04 |
| 9.00 | Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course. | 39.84 | Cum | 5,392 ₹2.1 L | 5,338 ₹2.1 L |
| 10.00 | Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat. | 118.77 | Cum | 6,154 ₹7.3 L | 6,092 ₹7.2 L |
Updated dates
Tender Value
₹38.9 L
EMD Value
₹38,910
Closing Date
6 Mar 2026, 3:00 pmClosed
Special Officer/Block Development Officer(V.P)
Block Development Office, Thanthoni
1.Construction of New Drainage from Amirthambal Nagar 2st Street Loganathan House to Velmurugan House Varai 2.Construction of New Drainage from Amirthambal Nagar 3rd Street Thangavel House to Kanagasivam House Varai
2026_RDTN_668890_2
Thanthoni Block - Andankovil West - CGF -2025-26
Open Tender
Civil Works
90 days
Thanthoni Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹38,910
25 May 2026
2 Mar 2026
6 Mar 2026
2 Mar 2026
6 Mar 2026
2 Mar 2026
Providing Drainage at Amirthampal Nager II nd Cross Loganathan House To Velmurugan House H/O Andankovil West Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Providing Drainage at Amirthampal Nager III rd Thangavel House To Kanagasivam House H/O Andankovil West Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Techpricebid.pdf
Tender Documents • 0.94 MB
BOQ_803662.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid