| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹43.9 LAccepted-Finance 2 63 SHIVAJI NAGAR GURUGRAM HARYANA | L-1 | Accepted-Finance Accepted | |
| 2 | L-2₹49.5 L+₹5.6 L (12.8%)Accepted-Finance E 2 124 SECTOR 11 ROHINI NEW DELHI 110085 | NORTH WEST | DELHI | 110085 | L-2 | Accepted-Finance Accepted | |
| 3 | L-3₹55.1 L+₹11.3 L (25.7%)Accepted-Finance A 15 1ST FLOOR PRIYADARSHINI VIHAR DELHI 110092 | SHAHDARA | DELHI | 110092 | L-3 | Accepted-Finance Accepted | |
| 4 | L-4₹57.5 L+₹13.6 L (31.1%)Accepted-Finance | L-4 | Accepted-Finance Accepted | |
| 5 | L-5₹57.7 L+₹13.8 L (31.5%)Accepted-Finance A 7 62 SECTOR 15 ROHINI DELHI 110089 | NORTH WEST | DELHI | 110089 | L-5 | Accepted-Finance Accepted |
Tender Value
₹91.5 L
EMD Value
₹1.8 L
Closing Date
20 Apr 2026, 3:00 pmClosed
Executive Engineer, PWD, SER-1, New Delhi
O/o Executive Engineer, PWD, SER-1, New Delhi-110065
Road Restoration work of Lodhi Road, BRT Road, Zakir Hussain Marg via BRT road, Neela Gumbad to Lodhi Flyover, B.P Marg to 4th-Avenue Road and other various road by NDMC, BSES, DJB under Sub-Division SER-14 of Division SER-1 during 2026-27
2026_PWD_289864_1
04/EE/PWD/SER-1/2026-27
Open Tender
Civil Works
Percentage
60 days
Assistant Engineer, SER-14
As per NIT
14 documents required · 14 mandatory
₹0
₹1.8 L
7 May 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | - | Cum | - | - |
| 0.0 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
With material conformaing to Grade-II (Size range 53 mm to 0.075 mm) having CBR value -25 | - | Cum | - | - |
| 0.0 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. | - | Cum | - | - |
| 0.0 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge.
50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | - | Cum | - | - |
| 0.0 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with lectronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.
40/50 mm compacted thickness with bitumen of grade VG-30 @5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in drum Type Hot Mix Plant of 60-90 TPH capacity | - | Cum | - | - |
| 0.0 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With medium setting bitumen emulsion | - | - | - | - |
| 0.9 | On W.B.M / W.M.M. @ 0.4kg/sqm | - | Sqm | - | - |
| 0.0 | On bituminous surface @ 0.25kg/sqm | - | Sqm | - | - |
| 0.0 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | - | Cum | - | - |
| 0.0 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | Mtr | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.14 MB
BOQ_384880.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .