Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-AOC | ₹35.5 L | L1 | Accepted-AOC agreement executed |
| 2 | L2₹38.7 LRejected-Finance | ₹38.7 L | L2 | Rejected-Finance reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical reject |
| Sl No | Description | Qty | Unit | L H MUHAMMED NUSHOOR L4 | Simon P.J. L2 | SUNREL CEMENTS PVT LTD L1 | Xavier Oommen L3 | KOTTAYAM LABOUR CONTRACT CO OPERATIVE SOCIETY LTD K1235 L6 | Anthyalankavu Engineering & Labour Contract Society Ltd No 321 L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00MAINTENANCE | |||||||||
| 1.00 | 15.7.2:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar with old mughal bricks | 10.95 | cum | 1,840 ₹20,148 | 1,657.2 ₹18,146.34 | 1,517 ₹16,611.15 | 1,731 ₹18,954.45 | 1,900 ₹20,805 | 1,840 ₹20,148 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 16.5 | cum | 2,540 ₹41,910 | 2,285.26 ₹37,706.79 | 2,092 ₹34,518 | 2,386 ₹39,369 | 2,700 ₹44,550 | 2,540 ₹41,910 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 38.51 | cum | 359 ₹13,824.37 | 323.39 ₹12,453.10 | 296 ₹11,398.37 | 337 ₹12,977.20 | 410 ₹15,788.28 | 359 ₹13,824.37 |
| 1.00 | OD137045/2025-2026:Dry rubble masonry with hard stone in foundation and plinth with good quality blastered rubble including all charges as per the direction of departmental officers | 64.91 | cum | 5,500 ₹3.6 L | 4,945.17 ₹3.2 L | 4,527 ₹2.9 L | 5,165 ₹3.4 L | 5,800 ₹3.8 L | 5,500 ₹3.6 L |
| 1.00 | OD137058/2025-2026:Dry Rubble masonry using Departmental rubble including all labour charges as per the direction of the departmental officers | 9.9 | cum | 3,331 ₹32,976.90 | 2,995.12 ₹29,651.69 | 2,741 ₹27,135.90 | 3,128 ₹30,967.20 | 3,500 ₹34,650 | 3,331 ₹32,976.90 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 34.38 | cum | 8,343 ₹2.9 L | 7,500.71 ₹2.6 L | 6,866 ₹2.4 L | 7,834 ₹2.7 L | 8,500 ₹2.9 L | 8,343 ₹2.9 L |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.88 | cum | 9,235.97 ₹81,978.47 | 8,303.14 ₹73,698.67 | 7,600 ₹67,457.60 | 8,672 ₹76,972.67 | 9,300 ₹82,546.80 | 9,235.97 ₹81,978.47 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 46.56 | sqm | 386.16 ₹17,979.61 | 347.16 ₹16,163.77 | 317 ₹14,759.52 | 362 ₹16,854.72 | 400 ₹18,624 | 386.16 ₹17,979.61 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 399.42 | kilogram | 112.43 ₹44,906.79 | 101.07 ₹40,369.38 | 93 ₹37,146.06 | 105 ₹41,939.10 | 118 ₹47,131.56 | 112.43 ₹44,906.79 |
Tender Value
₹43.0 L
EMD Value
₹50,000
Closing Date
10 Sept 2025, 5:00 pmClosed
Krishnakumar
The Assistant Engineer, LIDEW Section,Changanassery Municipality
Pro no 70/2025-26 Changanassery Municipality-General Hospital Maintenance Compound wall with cattle trapGeneral Civil Work Maintenance of Govt General Hospi tal Changanassery
2025_LSGD_792979_3
1/2025-26/EE/LIDEW/CMC
Open Tender
Civil Works - Buildings
180 days
Changanassery Municipality
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
18 Feb 2026
30 Aug 2025
12 Sept 2025
30 Aug 2025
10 Sept 2025
30 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1309015.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid