Loading…
Loading…
Tender Value
₹16.8 L
EMD Value
₹33,506
Closing Date
11 Sept 2026, 5:30 pm
Executive Engineer
NORTHERN HIGHWAY PLANNING DIVISION I
Survey work for the proposed construction of Bridges and ROBs throughout all over North Bengal under Northern Highway Planning Division I, P.W.R Dte. 20 nos sites within the Zone under Northern Highway Planning Division I, Siliguri.
2026_WBPWD_5019534_1
WB/PWD/EE/NHPDI/PWR/NIT01(3rd call) 26-27
Open Tender
CIVIL WORKS
Percentage
Saktigarh, Siliguri
Please refer Tender documents.
4 documents required · 4 mandatory
₹33,506
Yes
20 Aug 2026
20 Aug 2026
14 Sept 2026
20 Aug 2026
11 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour cost for Topographical survey of river u/s &
d/s 1500m approach road both side=1000m work
a) skilled Labour
4nos labour x5 days = 20nos | - | Per day per head | 479 | - |
| 2 | Labour cost for Levelling Survey of c/s
river,deepest channel & approach road long
section & cross section work a) Unskilled Labour
5nos x4 days=2Ono | - | Per day per head | 396 | - |
| 3 | Labour cost for G.T.S. BM carry at site
a) Unskilled Labour
3nos labour x 1 days= 3nos | - | Per day per head | 396 | - |
| 4 | apor COSTTOr ROW OemarcaTOn
Unskilled Labour
3 nos labour x2 days= 6 nos | - | Per day per head | 396 | - |
| 5 | Cost of Jungle cutting for clear object
a) Unskilled Labour 4daysx3no=12 nos | - | Per day per head | 396 | - |
| 6 | Daily Hire vehicle fare from Survey camp to Work
6site up & dn 80 k.m(ave) x10 days =800 k.m | - | KM | 18 | - |
| 7 | Cost of survey camp including electric and other 7 facilities Team 3 member x 10 days =30 nos | - | Per day per head | 660 | - |
| 8 | Drinking water 10dayx 9lit= 90 lit | - | Per Litre | 22 | - |
| 9 | Lump Sum in respect of nails, peg, Note-Book, Pen,
Pencil & broom | - | L.S | 2,200 | - |
| 10 | Cost for control pillar 250x250x750 =2nos | - | Per Piece | 770 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.82 MB
BOQ_5092093.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].