| 1 | L1₹17.5 LAccepted-AOC KUTTIYIL MANGAMKUZHY | PATHANAMTHITTA | KERALA | 689694 | ₹17.5 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SIBI FRANCIS L1 |
|---|---|---|---|---|
| 1.00Road | ||||
| 1.00 | OD119102/2024-2025:OD_5_586958/2023-2024
Construction of subgrade and earthen shoulders with approved material obtained from
borrow pits with all lifts and leads, transporting to site, spreading, grading to required
slope and requirement of Table 300.2 with lead upto 1000 m as per Technical
Specification Clause 301.5(OD @ alappuzha, with power roller) | 192.68 | cum | 1,406.38 ₹2,70,985.52 Lowest |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | 72.75 | cum | 2,484.07 ₹1,80,716.09 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 109.12 | cum | 9,563.75 ₹10,43,644.22 Lowest |
| 2.00Retaining wall | ||||
| 2.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 14.76 | cum | 441.5 ₹6,516.54 Lowest |
| 2.00 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 31.7 | cum | 6,847.77 ₹2,17,040.07 Lowest |
| 2.00 | 11.6.3.2:Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.<br>III. Random Rubble Masonry <br>(ii) In cement mortar 1:4 | 3.6 | cum | 9,367.58 ₹33,723.29 Lowest |
Tender Value
₹17.5 L
EMD Value
₹43,816
Closing Date
5 Jan 2026, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
LSGD OFFICE
Re Tender LAC ADS Sri P P Chitharanjan Hon M L A Thumboli Kuttunkal Road in Ward 17 of Aryad GP New Road General Civil Work
2025_LSGD_823762_16
JP/DEC2/RE/LIDEW/ALPY/25-26
Open Tender
Civil Works - Roads
Item Rate
240 days
ALAPPUZHA DP
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹43,816
Yes
10 Aug 2026
26 Dec 2025
7 Jan 2026
26 Dec 2025
5 Jan 2026
26 Dec 2025
Amount
OD119102/2024-2025:OD_5_586958/2023-2024 Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5(OD @ alappuzha, with power roller)
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Retaining wall
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
11.6.3.2:Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.<br>III. Random Rubble Masonry <br>(ii) In cement mortar 1:4
Bidder Name
SIBI FRANCIS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1381052.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 0.46 MB
Tendernotice_3.pdf
PDF • 0.10 MB
Tendernotice_4.pdf
PDF • 0.26 MB
Tendernotice_5.pdf
PDF • 0.07 MB
Tendernotice_6.pdf
PDF • 0.29 MB
BOQ_1381052.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 2.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .