Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC First lowest | |
| 2 | L2₹11.9 L+₹2.0 L (20.4%)Rejected-AOC PIRAVANTHOOR | L2 | Rejected-AOC Second lowest |
| Sl No | Description | Qty | Unit | C JOSEPH L1 | WINMARK ENDEAVOURS L2 |
|---|---|---|---|---|---|
| 1.00Appendix: A - Building proper | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 62 | sqm | 10.15 ₹629.3 Lowest | 12 ₹744 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 96 | cum | 282 ₹27,072 Lowest | 300 ₹28,800 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.26 | cum | 719.78 ₹906.92 | 450 ₹567 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.59 | cum | 8,686.5 ₹48,557.54 | 8,500 ₹47,515 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 11.25 | cum | 6,159.98 ₹69,299.78 Lowest | 9,000 ₹1,01,250 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 117.04 | kilogram | 123.1 ₹14,407.75 | 122 ₹14,279 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 12.84 | cum | 348.7 ₹4,478.01 Lowest | 450 ₹5,778.9 |
| 1.01 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 3.94 | cum | 7,970.5 ₹31,443.62 Lowest | 8,900 ₹35,110.5 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 0.5 | metre | 249.8 ₹124.9 Lowest | 280 ₹140 |
Tender Value
₹10.1 L
EMD Value
₹25,306
Closing Date
17 Jul 2026, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,Buildings Sub Division, Punalur
balance work for the construction of building for Mahadevarman anganavadi, Karavoor in Pathanapuram LAC. The provisions given in the estimate are site levelling, Earth filling inside basement,PCC for floori
2026_PWD_859662_1
06/BL/AEE/PNLR/3852/2026-2027
Open Tender
Civil Works - Buildings
Item Rate
180 days
Punalur
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹25,306
Yes
7 Sept 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix: A - Building proper | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.4 | kilogram | - | - |
| 1.007 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
| 1.008 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1 | cum | - | - |
| 1.009 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1453612.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
PRELIMINARY.pdf
Tender Documents • 0.12 MB
FORMOFTENDER.pdf
Tender Documents • 0.03 MB
INTEGRITYPACT.pdf
Tender Documents • 0.01 MB
BOQ_1453612.xls
BOQ • 0.35 MB
AFFIDAVIT.pdf
Tender Documents • 0.02 MB
EPAYMENT.pdf
Tender Documents • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .