| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC V P O BANURI TEHSIL PALAMPUR DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | ₹3.2 L | L1 | Accepted-AOC Awarded due to lowest quoted rates |
| 2 | L2₹3.4 LRejected-AOC CHIEF ENGINEER OP KANGRA ZONE HPSEBL DHARAMSHALA | KANGRA | HIMACHAL PRADESH | 175013 | ₹3.4 L | L2 | Rejected-AOC Rejected due to higher quoted rates |
| 3 | L2₹3.4 LRejected-AOC UPPER BAZAAR BHAWARNA TEHSIL PALAMPUR DISTT KANGRA H P | ₹3.4 L | L2 | Rejected-AOC Rejected due to higher quoted rates |
| 4 | L3₹3.4 LRejected-AOC VILL BHATERH PO SAINTHAL TEHSIL JOGINDERNAGAR DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | ₹3.4 L | L3 | Rejected-AOC Rejected due to higher quoted rates |
Updated dates
Tender Value
₹3.2 L
EMD Value
₹3,200
Closing Date
30 Jan 2026, 10:00 amClosed
Sr. Executive Engineer
o/o Sr. Executive Engineer, Electrical Division, HPSEBL, Baijnath
Tender for providing (Revised) 11/0.4kV, 63kVA S/stn. a/w LT line at Dhraman-2 in E-section Kandwari under ESD Paprola. TS No. 69 and 70/2025-26.
2026_HPSEB_126099_1
BED-95/2025-26
Open Tender
Electrical Works
60 days
Kandwari
refer tender docs
3 documents required · 3 mandatory
₹590
₹3,200
9 Feb 2026
17 Jan 2026
30 Jan 2026
17 Jan 2026
30 Jan 2026
17 Jan 2026
LT line
AAAC 7/3.15mm (50mm²)
Steel Tubular Poles (8 mtr)
Muffs with concerete filling
Channel Iron (75x40 x5)mm2 length 1.50 mtr + 0.02 mtr
Shackle insulator (16 kN)
D-Iron (U-Clamps)
LT Stay Set
Stay Wire (7/3.15 mm)
Full clamp [2 no. for A.I. 1no. For stay]
half clamp
Earthing Set Complete
Earth wire (GI, 8 SWG) for earthing
Earth Knob
Nuts and Bolts of Various Sizes
Aluminium Paint
Erection charges for Pole (08 mtr long)
Erection charges for AAAC 7/3.15mm
Erection charges for GI wire
Erection charges for LT stay set
Erection charges for Earthing set
Transportation charges
GST on Erection & Transportation
Distribution Transformer 63kVA
Distribution Transformer (Ordinary), 11/0.4 kV, 63KVA
Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
Muffs with concerete filling
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos]
MS Angle Iron (50x50x6 mm), Length : 2800 mm X 1 Nos] for LA's
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Bed, Belting & Knee Bracing
X Arm Channel Iron (100X50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed
X Arm Channel Iron (100X50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracing
Transformer LT Distribution Box and G.O. fixing Assembly
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 Nos
GO Switch Handle supporting (Channel Iron (75x40x6mm), Length 460mm
GO AB Switch Unit (11kV, 400A, 25 KA ) tripple Pole O/D type
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
Pipe Earthing Set
LT Distribution Panel Box with MCCB for 63KVA DTR
Half Clamp (M.S. Flat 50X6 mm)
Full Clamps (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Thimble
Copper Thimble
Danger Plate
Barbed Wire
LT Cable (3.5 Core) 70 mm²
Energy Meter (3-Phase, 4-Wire) DLMS compliant 100 A CT Type for 63 KVA Transformer (Duly tested by M&T Division)
Aluminium Paint.
LT Switched Capacitors 9 KVAr for 63 KVA (rate per KVAr)
Chain link fencing ,angle iron, gate etc. for transformer fancing.
Erection Part for Distribution Transformer
Digging of pit for pole 02 No. poles
Drilling of holes in X arm
Preparation of platform str. Member CI, AI, i.e X arm and Knee Bracing set.
Erection of Double Pole structure
Concreting 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm
Erection of platform
Erection of X-Arm,Drop out,Lightening Arrestors, MCCB, Switch L.T.Box, Energy Meter
Erection of stay sets complete in all respect.
Erection of Jumper
EARTHING for 03 No. Earths
Prov. Digging of pit for earthing size 0.90X1.20X2.40 = 3 Nos.
Fixing of earth rod, clamp, earth wire and connecting to the structure
Providing Charcoal and Salt for the earthing
Filling of the pit with material
Providing Earthing Conn. To G.O Switch, Lightning Arrestor Etc.& Poles
Prividing earthting to the Transformer, LT Box, Meter Box etc
Barbed Wire & Painting
Erection of 63kVA Transformer, LT Box, MCCB Switch, Cable, service Cable and Energy Meter
Transportation charges for DTR
GST on Erection and Transportation Charges
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BID-95.pdf
Tender Documents • 1.10 MB
BOQ_185849.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid