| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-Finance | L1 | Accepted-Finance L1 bidder | |
| 2 | L2₹13.6 L+₹26,403.82 (1.98%)Accepted-Finance 1005 SUB TREASURY THODUPUZHA | IDUKKI | KERALA | 685501 | L2 | Accepted-Finance L2 bidder | |
| 3 | L3₹13.7 L+₹36,598.10 (2.75%)Rejected-Finance | L3 | Rejected-Finance L3 bidder | |
| 4 | L5₹14.5 L+₹1.2 L (8.99%)Rejected-Finance ELAMDESHAM BP CONCRETING OF VELLAPLAVU KOTTA ROAD WARD 5 KARIMANNOOR GP | KOTTAYAM | KERALA | 686001 | L5 | Rejected-Finance L5 bidder | |
| 5 | L6₹15.0 L+₹1.6 L (12.3%)Rejected-Finance THURUTHIPARA HOUSE KALAYANTHANI | KOLLAM | KERALA | 689694 | L6 | Rejected-Finance L6 bidder |
| Sl No | Description | Qty | Unit | RENJITH MANUEL L5 | rajeshmanuel L6 | Saheer L3 | Mohith Abraham L1 | ADHARSH CONSTRUCTIONS L4 | AKSHAY K R L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Cement Concrete Retaining Wall 1.20 Meter Height 74 Rm | |||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 57.72 | cum | 235 ₹13,564.2 | 257 ₹14,834.04 | 244 ₹14,083.68 | 232.1 ₹13,396.81 Lowest | 237.79 ₹13,725.24 | 233.05 ₹13,451.65 |
| 1.00 | OD2464/2026-2027:Dowel Bars-Supplying and providing MS dowel Bars of size 16mm dia of 1.5m long (1m in rock and .50 in concrete) including drilling holes of 20mm dia and filling the gap with cement grout (.50kg/each) etc .complete | 150 | each | 440 ₹66,000 | 486 ₹72,900 | 480 ₹72,000 | 438.5 ₹65,775 | 355.64 ₹53,346 Lowest | 440.4 ₹66,060 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 59.84 | sqm | 375 ₹22,440 | 385 ₹23,038.4 | 325 ₹19,448 Lowest | 347.93 ₹20,820.13 | 356.42 ₹21,328.17 | 349.47 ₹20,912.28 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 181.64 | sqm | 815 ₹1,48,036.6 | 838 ₹1,52,214.32 | 775 ₹1,40,771 | 756.5 ₹1,37,410.66 Lowest | 774.95 ₹1,40,761.92 | 759.8 ₹1,38,010.07 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 23.68 | cum | 9,650 ₹2,28,512 | 9,950 ₹2,35,616 | 8,400 ₹1,98,912 Lowest | 8,977.5 ₹2,12,587.2 | 9,196.7 ₹2,17,777.86 | 9,017.35 ₹2,13,530.85 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 39.96 | cum | 8,320 ₹3,32,467.2 | 8,500 ₹3,39,660 | 7,800 ₹3,11,688 | 7,720.5 ₹3,08,511.18 Lowest | 7,909.31 ₹3,16,056.03 | 7,755.07 ₹3,09,892.6 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 58.38 | kilogram | 102 ₹5,954.86 | 112 ₹6,538.67 | 110 ₹6,421.91 | 101.3 ₹5,914 Lowest | 103.77 ₹6,058.2 | 101.74 ₹5,939.68 |
| 1.01 | OD2465/2026-2027:PVC WEEP HOLES-Providing weep holes using 75mm dia pvc pipes working presure 4kg/cm2 including cost of meterials ,conveyance ,labour charges etc completed. | 29.3 | metre | 113 ₹3,310.9 | 110 ₹3,223 | 110 ₹3,223 | 98.1 ₹2,874.33 | 12.7 ₹372.11 Lowest | 102.33 ₹2,998.27 |
| 2.00Display Board | |||||||||
Tender Value
₹15.0 L
EMD Value
₹37,584
Closing Date
17 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy Director of Soil Conservation
Directorate of Soil Survey and Soil Conservation, 3rd and 4th Floor, Centre Plaza Building, Vazhuthacaud, Thiruvananthapuram
1. Cement Concrete retaining wall 1.2 m height (74 RM). 2. Spring water recharge- Polyethylene storage tank with GI stand. 3. Display Board.
2026_DSSC_887380_1
SOIL/DSSSC/88/2026-2027
Open Tender
Civil Works - Others
Item Rate
150 days
Vannapuram panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹37,584
Yes
25 Nov 2026
9 Nov 2026
19 Nov 2026
9 Nov 2026
17 Nov 2026
9 Nov 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cement Concrete Retaining Wall 1.20 Meter Height 74 Rm | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 57.72 | cum | - | - |
| 1.002 | OD2464/2026-2027:Dowel Bars-Supplying and providing MS dowel Bars of size 16mm dia of 1.5m long (1m in rock and .50 in concrete) including drilling holes of 20mm dia and filling the gap with cement grout (.50kg/each) etc .complete | 150 | each | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 59.84 | sqm | - | - |
| 1.004 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 181.64 | sqm | - | - |
| 1.005 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 23.68 | cum | - | - |
| 1.006 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 39.96 | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 58.38 | kilogram | - | - |
| 1.008 | OD2465/2026-2027:PVC WEEP HOLES-Providing weep holes using 75mm dia pvc pipes working presure 4kg/cm2 including cost of meterials ,conveyance ,labour charges etc completed. | 29.3 | metre | - | - |
| 2Display Board | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1514528.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1514528.xls
BOQ • 0.31 MB
BalanaduBidDocument.pdf
Tender Documents • 2.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .