| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC MADAVOOR PO KOZHIKODE KERALA KL | KOZHIKODE | KERALA | 673585 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹13.5 L+₹2,765.39 (0.20%)Rejected-AOC KERALA KL KERALA | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹13.5 L+₹3,322.76 (0.25%)Rejected-AOC 17 01 DISTRICT TREASURY THAMARASSERY | KOZHIKODE | KERALA | 612906 | L3 | Rejected-AOC L3 bidder | |
| 4 | L4₹13.6 L+₹9,924.64 (0.74%)Rejected-AOC KERALA KL KERALA | ALAPPUZHA | KERALA | 686534 | L4 | Rejected-AOC L4 bidder | |
| 5 | L5₹14.5 L+₹97,414.24 (7.22%)Rejected-AOC ANNASSERY PO THALAKKALATUR KOZHIKODE 673317 KERALA | KOZHIKODE | KERALA | 673317 | L5 | Rejected-AOC L5 bidder |
| Sl No | Description | Qty | Unit | VK BALAN L2 | N.P. KANARAN L4 | SHAMEJ T L5 | JIMMI DAVID L3 | ROYAL BUILDERS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00canal lining | ||||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 375 | sqm | 6.92 ₹2,595 | 6.96 ₹2,610 | 8.4 ₹3,150 | 7 ₹2,625 | 6 ₹2,250 Lowest |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 0.88 | cum | 565.68 ₹497.8 | 568 ₹499.84 | 695 ₹611.6 | 565 ₹497.2 | 500 ₹440 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 121.2 | cum | 192.38 ₹23,317.42 | 192 ₹23,271.36 | 236 ₹28,604.38 | 190 ₹23,028.95 Lowest | 200 ₹24,241 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 46.68 | cum | 5,923.93 ₹2,76,529.05 Lowest | 5,956 ₹2,78,026.08 | 6,900 ₹3,22,092 | 5,930 ₹2,76,812.4 | 6,000 ₹2,80,080 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 430.1 | sqm | 626.97 ₹2,69,659.8 | 630 ₹2,70,963 | 600 ₹2,58,060 | 628 ₹2,70,102.8 | 580 ₹2,49,458 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 83.72 | cum | 6,399.04 ₹5,35,727.63 Lowest | 6,430 ₹5,38,319.6 | 6,500 ₹5,44,180 | 6,405 ₹5,36,226.6 | 6,500 ₹5,44,180 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.46 | cum | 6,897.01 ₹1,06,627.77 Lowest | 6,933 ₹1,07,184.18 | 8,400 ₹1,29,864 | 6,905 ₹1,06,751.3 | 7,500 ₹1,15,950 |
| 1.01 | 5.22.2:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire | 37.18 | kilogram | 81.95 ₹3,046.9 Lowest | 84 ₹3,123.12 | 100.8 ₹3,747.74 | 82 ₹3,048.76 | 86 ₹3,197.48 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 273.88 | sqm | 236.95 ₹64,895.87 | 237 ₹64,909.56 | 270 ₹73,947.6 | 235 ₹64,361.8 | 200 ₹54,776 Lowest |
Tender Value
₹16.6 L
EMD Value
₹41,574
Closing Date
25 Aug 2025, 6:55 pmClosed
Executive Engineer
O/O Executive Engineer, KyIP Division Perambra
Rectification of canal
2025_Irrig_787730_1
IRR/PI/TR/4128/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Edakkara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹41,574
Yes
23 Oct 2025
18 Aug 2025
27 Aug 2025
18 Aug 2025
25 Aug 2025
18 Aug 2025
18 Aug 2025 - 25 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .