| Sl No | Description | Qty | Unit | M THANGARAJ L1 | PRANAV TRADERS L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Construction of Community hall at Kalipalayam H/O.Kuppam Panchayat | |||||
| 2.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with stand | 44.51 | M3 | 263.38 ₹11,723.04 | 264.68 ₹11,780.91 |
| 3.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 25.45 | M3 | 45.45 ₹1,156.70 | 46.75 ₹1,189.79 |
| 4.00 | Cement concrete 1:4:8 mix (one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted, etc., complete | 12.8 | M3 | 5,226.62 ₹66,900.74 | 5,227.92 ₹66,917.38 |
| 5.00 | Brick work in cm 1:5 mix(one cement and five sand) using country bricks 4 ground maded of size 23 x 11 x 7 cm including curing, finishing and cost & Conveyance of all materials etc., complete. | 34.28 | M3 | 6,130.49 ₹2.1 L | 6,131.79 ₹2.1 L |
| 6.00Supplying and erecting centering for sides Centering for soffits of RCC slabs of 5 plane surface like lintels, beams, etc., including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm | |||||
| 7.00 | For Column Footing | 52.37 | M2 | 547.1 ₹28,651.63 | 548.4 ₹28,719.71 |
| 8.00 | Column Upto Iintel | 166.62 | M2 | 1,094.6 ₹1.8 L | 1,095.9 ₹1.8 L |
| 9.00 | Supplying fabricating and placing in position of ribbed steel rods for 6 reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 3.3 | Mt | 91,916.98 ₹3.0 L | 91,918.28 ₹3.0 L |
| 10.00RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering, shuttering, and ost of reinforcement grill out including curing etc complete and also including fixing fan clamps and ixtures in rcc works | |||||
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
25 Feb 2026, 3:00 pmClosed
Special Officer/BDO(V.Pt), K.Paramathi
Special Officer/BDO(V.Pt), K.Paramath
Construction of Community hall at Kalipalayam H/O.Kuppam Panchayat
2026_RDTN_664458_1
Construction of Community hall at Kalipalayam H/O.Kuppam Panchayat
Open Tender
Civil Works - Others
180 days
Kuppam Panchayat Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
Yes
14 Mar 2026
23 Feb 2026
25 Feb 2026
23 Feb 2026
25 Feb 2026
23 Feb 2026
Name of the Work : Construction of Community hall at Kalipalayam H/O.Kuppam Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with stand
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Cement concrete 1:4:8 mix (one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted, etc., complete
Brick work in cm 1:5 mix(one cement and five sand) using country bricks 4 ground maded of size 23 x 11 x 7 cm including curing, finishing and cost & Conveyance of all materials etc., complete.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of 5 plane surface like lintels, beams, etc., including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm
For Column Footing
Column Upto Iintel
Supplying fabricating and placing in position of ribbed steel rods for 6 reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering, shuttering, and ost of reinforcement grill out including curing etc complete and also including fixing fan clamps and ixtures in rcc works
For Column Footing
Column Upto Iintel
Plastering with cm 1:5 mix(one cement and five sand) to 12 mm thick 8 including cost and conveyance of all materials in all floors etc., as directed by departmental officers etc, complete complying with standard specifications.
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications
Plastering surfaces of RCC items such as slabs,beams, sunshades with cement mortar 1:3-10mm thick including packing, providing cement mortar beading for sunshades staircase steps, lands slabs etc., as directed by departmental officers etc,
Providing weathering course with best quality of brick Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab, the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thicknes
Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm 12 x 2 cm approved qty with, CM. 1.3 12 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with 13 white cement mixed with colouring pigment at the rate of 0.40 Kg./sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M. Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed 15 stone M. Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg./sq.m. neatly in all floors, curing, etc. complying with standard specification and as directed by the departmental officers.
Cost And Supply Of European Water Closet
Cost And Supply Of Indian Water Closet
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends, & clamps etc..
Distembering two coats of oil bound distember using one coat of primer coat including cost & conveyance to size and all labour charges etc., complete.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping, clean removel of dirt etc complete.
Cost And Supply of Doors(1.20*2.10)
Cost And Supply of Windows(1.20*1.30)
Painting two coats of new iron work with best quality synthetic enamel paint of approved quality and colour with priming coat including the cost all materials etc..complete, in all floors.
WATER SUPPLY ARRANGEMENTS
Cost And Supply Of 1000lit HDPE Tank
25mm Pvc pipe
25mm Pvc Bend
25mm Pvc Tee
15mm Pvc Tap
ELECTRICAL ARRANGEMENTS
Light Point and Fan Point-SD-17
Plug Point-SD-36
Tube Light-SD 87
Ceiling Fan-SD 106
Street Light SD-94
CFL Bulp SD-80
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_797816.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid